nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A decision-making system for construction site layout planning
|
Ning, Xin |
|
2011 |
20 |
4 |
p. 459-473 15 p. |
artikel |
2 |
An algorithm for the calculation of feasible mobile crane position areas
|
Safouhi, H. |
|
2011 |
20 |
4 |
p. 360-367 8 p. |
artikel |
3 |
Assessment of conformance and interoperability testing methods used for construction industry product models
|
Lipman, Robert |
|
2011 |
20 |
4 |
p. 418-428 11 p. |
artikel |
4 |
Augmented heuristic algorithm for multi-skilled resource scheduling
|
Wongwai, Narongrit |
|
2011 |
20 |
4 |
p. 429-445 17 p. |
artikel |
5 |
Augmented reality-based computational fieldwork support for equipment operations and maintenance
|
Lee, Sanghoon |
|
2011 |
20 |
4 |
p. 338-352 15 p. |
artikel |
6 |
Automated multi-objective optimization system for airport site layouts
|
Khalafallah, Ahmed |
|
2011 |
20 |
4 |
p. 313-320 8 p. |
artikel |
7 |
Calendar
|
|
|
2011 |
20 |
4 |
p. 490- 1 p. |
artikel |
8 |
Coupling analysis of finite element and finite volume method for the design and construction of FPSO crane
|
Han, Dae-Suk |
|
2011 |
20 |
4 |
p. 368-379 12 p. |
artikel |
9 |
Design of a construction management data visualization environment: A top–down approach
|
Chiu, Chao-Ying |
|
2011 |
20 |
4 |
p. 399-417 19 p. |
artikel |
10 |
Dimension optimization of an orientation fine-tuning manipulator for segment assembly robots in shield tunneling machines
|
Wu, Chao |
|
2011 |
20 |
4 |
p. 353-359 7 p. |
artikel |
11 |
Editorial Board
|
|
|
2011 |
20 |
4 |
p. IFC- 1 p. |
artikel |
12 |
Feedback analysis of tunnel construction using a hybrid arithmetic based on Support Vector Machine and Particle Swarm Optimisation
|
Jiang, A.N. |
|
2011 |
20 |
4 |
p. 482-489 8 p. |
artikel |
13 |
Formalisms for query capture and data source identification to support data fusion for construction productivity monitoring
|
Pradhan, Anu |
|
2011 |
20 |
4 |
p. 389-398 10 p. |
artikel |
14 |
Integrating BIM and gaming for real-time interactive architectural visualization
|
Yan, Wei |
|
2011 |
20 |
4 |
p. 446-458 13 p. |
artikel |
15 |
Measuring and visualizing hot mix asphalt concrete paving operations
|
Miller, S.R. |
|
2011 |
20 |
4 |
p. 474-481 8 p. |
artikel |
16 |
Optimal earth pressure balance control for shield tunneling based on LS-SVM and PSO
|
Liu, Xuanyu |
|
2011 |
20 |
4 |
p. 321-327 7 p. |
artikel |
17 |
Photogrammetric 3D modelling and mechanical analysis of masonry arches: An approach based on a discontinuous model of voussoirs
|
Riveiro, B. |
|
2011 |
20 |
4 |
p. 380-388 9 p. |
artikel |
18 |
Testing in harsh conditions: Tracking resources on construction sites with machine vision
|
Jog, Gauri M. |
|
2011 |
20 |
4 |
p. 328-337 10 p. |
artikel |