nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A development of next generation intelligent construction liftcar toolkit for vertical material movement management
|
Cho, Chang-Yeon |
|
2011 |
20 |
1 |
p. 14-27 14 p. |
artikel |
2 |
A framework for an automated and integrated project monitoring and control system for steel fabrication projects
|
Azimi, Reza |
|
2011 |
20 |
1 |
p. 88-97 10 p. |
artikel |
3 |
A framework for Virtual Interactive Construction Education (VICE)
|
Goedert, James |
|
2011 |
20 |
1 |
p. 76-87 12 p. |
artikel |
4 |
Analysis of an energy efficient building design through data mining approach
|
Kim, Hyunjoo |
|
2011 |
20 |
1 |
p. 37-43 7 p. |
artikel |
5 |
An object-based 3D walk-through model for interior construction progress monitoring
|
Roh, Seungjun |
|
2011 |
20 |
1 |
p. 66-75 10 p. |
artikel |
6 |
Application of WiFi-based indoor positioning system for labor tracking at construction sites: A case study in Guangzhou MTR
|
Woo, Sunkyu |
|
2011 |
20 |
1 |
p. 3-13 11 p. |
artikel |
7 |
Automatic optimal design algorithm for the foundation of tower cranes
|
Kim, Sun-Kuk |
|
2011 |
20 |
1 |
p. 56-65 10 p. |
artikel |
8 |
Calendar
|
|
|
2011 |
20 |
1 |
p. 98- 1 p. |
artikel |
9 |
Editorial Board
|
|
|
2011 |
20 |
1 |
p. IFC- 1 p. |
artikel |
10 |
Global convergence in construction
|
Kim, Sun Kuk |
|
2011 |
20 |
1 |
p. 1-2 2 p. |
artikel |
11 |
Supply chain management model for ready mixed concrete
|
Park, Moonseo |
|
2011 |
20 |
1 |
p. 44-55 12 p. |
artikel |
12 |
The development of work performance analysis system
|
Lim, Chul-Woo |
|
2011 |
20 |
1 |
p. 28-36 9 p. |
artikel |