nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A case-based reasoning system for using functional performance specification in the briefing of building projects
|
Luo, Xiaochun |
|
2010 |
19 |
6 |
p. 725-733 9 p. |
artikel |
2 |
A physics-based simulation approach for cooperative erection activities
|
Chi, Hung-Lin |
|
2010 |
19 |
6 |
p. 750-761 12 p. |
artikel |
3 |
Augmented process model for e-tendering: Towards integrating object models with document management systems
|
Ajam, Maher |
|
2010 |
19 |
6 |
p. 762-778 17 p. |
artikel |
4 |
Automated eco-friendly road stripe removal system
|
Bernold, Leonhard E. |
|
2010 |
19 |
6 |
p. 694-701 8 p. |
artikel |
5 |
Calendar
|
|
|
2010 |
19 |
6 |
p. 817- 1 p. |
artikel |
6 |
Decision support for construction method selection in concrete buildings: Prefabrication adoption and optimization
|
Chen, Ying |
|
2010 |
19 |
6 |
p. 665-675 11 p. |
artikel |
7 |
Developing an SVM based risk hedging prediction model for construction material suppliers
|
Chen, Jieh-Haur |
|
2010 |
19 |
6 |
p. 702-708 7 p. |
artikel |
8 |
Development of an intuitive user interface for a hydraulic backhoe
|
Yoon, Jungwon |
|
2010 |
19 |
6 |
p. 779-790 12 p. |
artikel |
9 |
Dispatching ready mixed concrete trucks under demand postponement and weight limit regulation
|
Lin, Pei-Chun |
|
2010 |
19 |
6 |
p. 798-807 10 p. |
artikel |
10 |
Editorial Board
|
|
|
2010 |
19 |
6 |
p. IFC- 1 p. |
artikel |
11 |
Effectiveness of remote control for a concrete surface grinding machine
|
Moon, Sungwoo |
|
2010 |
19 |
6 |
p. 734-741 8 p. |
artikel |
12 |
Improved ant colony optimization algorithms for determining project critical paths
|
Duan, Q. |
|
2010 |
19 |
6 |
p. 676-693 18 p. |
artikel |
13 |
Measuring building façades with a low-cost close-range photogrammetry system
|
Ordóñez, Celestino |
|
2010 |
19 |
6 |
p. 742-749 8 p. |
artikel |
14 |
Optimization of indoor air temperature set-point for centralized air-conditioned spaces in subtropical climates
|
Mui, K.W. |
|
2010 |
19 |
6 |
p. 709-713 5 p. |
artikel |
15 |
Predicting construction crew productivity by using Self Organizing Maps
|
Oral, Emel Laptali |
|
2010 |
19 |
6 |
p. 791-797 7 p. |
artikel |
16 |
Proactive problem-solver for construction
|
Yu, Wen-der |
|
2010 |
19 |
6 |
p. 808-816 9 p. |
artikel |
17 |
Using PLS-SEM technique to model construction organizations' willingness to participate in e-bidding
|
Aibinu, Ajibade Ayodeji |
|
2010 |
19 |
6 |
p. 714-724 11 p. |
artikel |