nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A hybrid optimization mechanism for constructing a dynamic simulation system—An operational behavior analysis of a moving scaffolding system
|
Pan, Nai-Hsin |
|
2009 |
18 |
7 |
p. 881-893 13 p. |
artikel |
2 |
A laser-technology-based lifting-path tracking system for a robotic tower crane
|
Lee, Ghang |
|
2009 |
18 |
7 |
p. 865-874 10 p. |
artikel |
3 |
An automated system for optimizing post-disaster temporary housing allocation
|
El-Anwar, Omar |
|
2009 |
18 |
7 |
p. 983-993 11 p. |
artikel |
4 |
Assessing the impact of materials tracking technologies on construction craft productivity
|
Grau, David |
|
2009 |
18 |
7 |
p. 903-911 9 p. |
artikel |
5 |
A study of ontology-based risk management framework of construction projects through project life cycle
|
Tserng, H. Ping |
|
2009 |
18 |
7 |
p. 994-1008 15 p. |
artikel |
6 |
Automated contract time determination system for highway projects
|
Jeong, Hyung Seok |
|
2009 |
18 |
7 |
p. 957-965 9 p. |
artikel |
7 |
Bridge inspection robot system with machine vision
|
Oh, Je-Keun |
|
2009 |
18 |
7 |
p. 929-941 13 p. |
artikel |
8 |
Calendar
|
|
|
2009 |
18 |
7 |
p. 1009- 1 p. |
artikel |
9 |
Collaborative knowledge management—A construction case study
|
Dave, Bhargav |
|
2009 |
18 |
7 |
p. 894-902 9 p. |
artikel |
10 |
Crucial tactical variables for value delivery in virtual projects
|
Barima, O.K.B. |
|
2009 |
18 |
7 |
p. 875-880 6 p. |
artikel |
11 |
Editorial Board
|
|
|
2009 |
18 |
7 |
p. IFC- 1 p. |
artikel |
12 |
Electro-hydraulic proportional control of thrust system for shield tunneling machine
|
Huayong, Yang |
|
2009 |
18 |
7 |
p. 950-956 7 p. |
artikel |
13 |
Entropy-based scheduling of resource-constrained construction projects
|
Christodoulou, Symeon |
|
2009 |
18 |
7 |
p. 919-928 10 p. |
artikel |
14 |
Improving agent-based negotiation efficiency in construction supply chains: A relative entropy method
|
Xue, Xiaolong |
|
2009 |
18 |
7 |
p. 975-982 8 p. |
artikel |
15 |
Improving megaproject briefing through enhanced collaboration with ICT
|
Chung, Jacky K.H. |
|
2009 |
18 |
7 |
p. 966-974 9 p. |
artikel |
16 |
Optimizing construction planning schedules by virtual prototyping enabled resource analysis
|
Li, Heng |
|
2009 |
18 |
7 |
p. 912-918 7 p. |
artikel |
17 |
Resource-constrained scheduling for continuous repetitive projects with time-based production units
|
Hsie, Machine |
|
2009 |
18 |
7 |
p. 942-949 8 p. |
artikel |