nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A fuzzy DEA–Neural approach to measuring design service performance in PCM projects
|
Wang, Ching-Hwang |
|
2009 |
18 |
5 |
p. 702-713 12 p. |
artikel |
2 |
A performance evaluation of a Stewart platform based Hume concrete pipe manipulator
|
Kim, Young S. |
|
2009 |
18 |
5 |
p. 665-676 12 p. |
artikel |
3 |
Automated Box–Jenkins forecasting modelling
|
Lu, Y. |
|
2009 |
18 |
5 |
p. 547-558 12 p. |
artikel |
4 |
Automated bridge coating defect recognition using adaptive ellipse approach
|
Chen, Po-Han |
|
2009 |
18 |
5 |
p. 632-643 12 p. |
artikel |
5 |
Automated defect detection for sewer pipeline inspection and condition assessment
|
Guo, W. |
|
2009 |
18 |
5 |
p. 587-596 10 p. |
artikel |
6 |
Benchmarking-based process reengineering for construction management
|
Cheng, Min-Yuan |
|
2009 |
18 |
5 |
p. 605-623 19 p. |
artikel |
7 |
Calendar
|
|
|
2009 |
18 |
5 |
p. 714- 1 p. |
artikel |
8 |
Chronological development history of X–Y table based pavement crack sealers and research findings for practical use in the field
|
Kim, Young S. |
|
2009 |
18 |
5 |
p. 513-524 12 p. |
artikel |
9 |
Developing a precast production management system using RFID technology
|
Yin, Samuel Y.L. |
|
2009 |
18 |
5 |
p. 677-691 15 p. |
artikel |
10 |
Editorial Board
|
|
|
2009 |
18 |
5 |
p. IFC- 1 p. |
artikel |
11 |
Estimating bridge performance based on a matrix-driven fuzzy linear regression model
|
Pan, Nang-Fei |
|
2009 |
18 |
5 |
p. 578-586 9 p. |
artikel |
12 |
Evolutionary support vector machine inference system for construction management
|
Cheng, Min-Yuan |
|
2009 |
18 |
5 |
p. 597-604 8 p. |
artikel |
13 |
Feasibility verification of brick-laying robot using manipulation trajectory and the laying pattern optimization
|
Yu, Seung-Nam |
|
2009 |
18 |
5 |
p. 644-655 12 p. |
artikel |
14 |
FEM modeling of structures based on close range digital photogrammetry
|
Armesto, Julia |
|
2009 |
18 |
5 |
p. 559-569 11 p. |
artikel |
15 |
Fuzzy-based MOGA approach to stochastic time–cost trade-off problem
|
Eshtehardian, Ehsan |
|
2009 |
18 |
5 |
p. 692-701 10 p. |
artikel |
16 |
Modeling building projects as a basis for change control
|
Isaac, Shabtai |
|
2009 |
18 |
5 |
p. 656-664 9 p. |
artikel |
17 |
Probabilistic simulation for developing likelihood distribution of engineering project cost
|
Chou, Jui-Sheng |
|
2009 |
18 |
5 |
p. 570-577 8 p. |
artikel |
18 |
RETRACTED: Development of automated change order impact detection and quantification system
|
Lee, Min-Jae |
|
2009 |
18 |
5 |
p. 525-535 11 p. |
artikel |
19 |
Shadowing tradespeople: Inefficiency in maintenance fieldwork
|
Lee, Sanghoon |
|
2009 |
18 |
5 |
p. 536-546 11 p. |
artikel |
20 |
Simulation of coupled heat and moisture transfer in air-conditioned buildings
|
Qin, Menghao |
|
2009 |
18 |
5 |
p. 624-631 8 p. |
artikel |