Digital Library
Close Browse articles from a journal
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
                                       All articles of the corresponding issues
 
                             15 results found
no title author magazine year volume issue page(s) type
1 Automatic monitoring and control of cutter suction dredger Tang, Jianzhong
2009
18 2 p. 194-203
10 p.
article
2 Building information model based energy/exergy performance assessment in early design stages Schlueter, Arno
2009
18 2 p. 153-163
11 p.
article
3 Calendar 2009
18 2 p. 237-
1 p.
article
4 Construction management process reengineering performance measurements Cheng, Min-Yuan
2009
18 2 p. 183-193
11 p.
article
5 Control strategy of the hybrid drive for vehicle mounted aerial work platform Krasucki, Janusz
2009
18 2 p. 130-138
9 p.
article
6 Discrete-event simulation based performance quantification of web-based and traditional bidder inquiry processes East, E. William
2009
18 2 p. 109-117
9 p.
article
7 Economic evaluation model for post-earthquake bridge repair/rehabilitation: Taiwan case studies Cheng, Min-Yuan
2009
18 2 p. 204-218
15 p.
article
8 Editorial Board 2009
18 2 p. IFC-
1 p.
article
9 Evaluation of Augmented Reality in steel column inspection Shin, Do Hyoung
2009
18 2 p. 118-129
12 p.
article
10 Excavator tele-operation system using a human arm Kim, Dongmok
2009
18 2 p. 173-182
10 p.
article
11 Housing refurbishment contractors selection based on a hybrid fuzzy-QFD approach Juan, Yi-Kai
2009
18 2 p. 139-144
6 p.
article
12 Modeling corrosion currents of reinforced concrete using ANN Topçu, İlker Bekir
2009
18 2 p. 145-152
8 p.
article
13 Multiobjective design of Work-In-Process buffer for scheduling repetitive building projects González, V.
2009
18 2 p. 95-108
14 p.
article
14 Visualizing high-rise building construction strategies using linear scheduling and 4D CAD Russell, Alan
2009
18 2 p. 219-236
18 p.
article
15 Web-based conceptual cost estimates for construction projects using Evolutionary Fuzzy Neural Inference Model Cheng, Min-Yuan
2009
18 2 p. 164-172
9 p.
article
                             15 results found
 
 Koninklijke Bibliotheek - National Library of the Netherlands