1 |
Calendar
|
|
|
2008 |
18 |
1 |
p. 93- 1 p. |
artikel |
2 |
Combination of radio frequency identification (RFID) and field verification tests of interior decorating materials
|
Tzeng, Chun-Ta |
|
2008 |
18 |
1 |
p. 16-23 8 p. |
artikel |
3 |
Defect detection of concrete structures using both infrared thermography and elastic waves
|
Cheng, Chia-Chi |
|
2008 |
18 |
1 |
p. 87-92 6 p. |
artikel |
4 |
Editorial Board
|
|
|
2008 |
18 |
1 |
p. IFC- 1 p. |
artikel |
5 |
Historical photography-based computer-aided architectural design: Demolished buildings information modeling with reverse engineering functionality
|
Styliadis, Athanasios D. |
|
2008 |
18 |
1 |
p. 51-69 19 p. |
artikel |
6 |
IFC and building lifecycle management
|
Vanlande, Renaud |
|
2008 |
18 |
1 |
p. 70-78 9 p. |
artikel |
7 |
Integrating 3D laser scanning and photogrammetry for progress measurement of construction work
|
El-Omari, Samir |
|
2008 |
18 |
1 |
p. 1-9 9 p. |
artikel |
8 |
Integration of cost and schedule using extensive matrix method and spreadsheets
|
Chen, Po-Han |
|
2008 |
18 |
1 |
p. 32-41 10 p. |
artikel |
9 |
Learning from risks: A tool for post-project risk assessment
|
Dikmen, I. |
|
2008 |
18 |
1 |
p. 42-50 9 p. |
artikel |
10 |
Multi-objective simulation-optimization for earthmoving operations
|
Zhang, Hong |
|
2008 |
18 |
1 |
p. 79-86 8 p. |
artikel |
11 |
The use of artificial neural networks in adiabatic curves modeling
|
Trtnik, Gregor |
|
2008 |
18 |
1 |
p. 10-15 6 p. |
artikel |
12 |
Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling
|
Rogalska, Magdalena |
|
2008 |
18 |
1 |
p. 24-31 8 p. |
artikel |