nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A functional architecture for an e-Engineering hub
|
Ren, Z. |
|
2008 |
17 |
8 |
p. 930-939 10 p. |
artikel |
2 |
Author Index Volume 17
|
|
|
2008 |
17 |
8 |
p. 984-987 4 p. |
artikel |
3 |
Building data model and simulation platform for spatial interaction management in smart home
|
Lertlakkhanakul, Jumphon |
|
2008 |
17 |
8 |
p. 948-957 10 p. |
artikel |
4 |
Calendar
|
|
|
2008 |
17 |
8 |
p. 983- 1 p. |
artikel |
5 |
Contents of Volume 17
|
|
|
2008 |
17 |
8 |
p. 992-996 5 p. |
artikel |
6 |
Decision-making and assessment tool for design and construction of high-rise building drainage systems
|
Cheng, C.L. |
|
2008 |
17 |
8 |
p. 897-906 10 p. |
artikel |
7 |
Design, data and process issues for mega-scale rapid manufacturing machines used for construction
|
Buswell, R.A. |
|
2008 |
17 |
8 |
p. 923-929 7 p. |
artikel |
8 |
Developing construction assistant experience management system using people-based maps
|
Lin, Yu-Cheng |
|
2008 |
17 |
8 |
p. 975-982 8 p. |
artikel |
9 |
Editorial Board
|
|
|
2008 |
17 |
8 |
p. IFC- 1 p. |
artikel |
10 |
Fuzzy AHP approach for selecting the suitable bridge construction method
|
Pan, Nang-Fei |
|
2008 |
17 |
8 |
p. 958-965 8 p. |
artikel |
11 |
Integrating design and construction through virtual prototyping
|
Li, Heng |
|
2008 |
17 |
8 |
p. 915-922 8 p. |
artikel |
12 |
IT usage in Alberta's building construction projects: Current status and challenges
|
Hewage, Kasun N. |
|
2008 |
17 |
8 |
p. 940-947 8 p. |
artikel |
13 |
Remote control of backhoe at construction site with a pneumatic robot system
|
Sasaki, Takahiro |
|
2008 |
17 |
8 |
p. 907-914 8 p. |
artikel |
14 |
Resource-constrained construction project scheduling model for profit maximization considering cash flow
|
Liu, Shu-Shun |
|
2008 |
17 |
8 |
p. 966-974 9 p. |
artikel |
15 |
Subject Index Volume 17
|
|
|
2008 |
17 |
8 |
p. 988-991 4 p. |
artikel |