1 |
AHP- and simulation-based budget determination procedure for public building construction projects
|
Lai, Yu-Ting |
|
2008 |
17 |
5 |
p. 623-632 10 p. |
artikel |
2 |
A model of integrating the cycle of construction knowledge flows: Lessons learned in Taiwan
|
Yin, Samuel Y.L. |
|
2008 |
17 |
5 |
p. 536-549 14 p. |
artikel |
3 |
Assessing working conditions using Fuzzy Logic
|
de Vries, Bauke |
|
2008 |
17 |
5 |
p. 584-591 8 p. |
artikel |
4 |
Calendar
|
|
|
2008 |
17 |
5 |
p. 656- 1 p. |
artikel |
5 |
Data processing for real-time construction site spatial modeling
|
Gong, Jie |
|
2008 |
17 |
5 |
p. 526-535 10 p. |
artikel |
6 |
Development of an automated verticality alignment system for a vibro-lance
|
Shaban, E.M. |
|
2008 |
17 |
5 |
p. 645-655 11 p. |
artikel |
7 |
Digital image reasoning for tracking excavation activities
|
Quiñones-Rozo, C.A. |
|
2008 |
17 |
5 |
p. 608-622 15 p. |
artikel |
8 |
Editorial Board
|
|
|
2008 |
17 |
5 |
p. IFC- 1 p. |
artikel |
9 |
Evolutionary resource scheduler for linear projects
|
Georgy, Maged E. |
|
2008 |
17 |
5 |
p. 573-583 11 p. |
artikel |
10 |
Factor selection for delay analysis using Knowledge Discovery in Databases
|
Kim, Hyunjoo |
|
2008 |
17 |
5 |
p. 550-560 11 p. |
artikel |
11 |
Full-span Pre-cast Launching Method (FPLM) analysis with Dynamic Simulation — Case studies of Taiwan High-Speed Rail (THSR) Project
|
Pan, Nai-Hsin |
|
2008 |
17 |
5 |
p. 592-607 16 p. |
artikel |
12 |
Integrating discrete event and lighting simulation for analyzing construction work zones lighting plans
|
Nassar, Khaled |
|
2008 |
17 |
5 |
p. 561-572 12 p. |
artikel |
13 |
Monitoring second lining of tunnel with mounted fiber Bragg grating strain sensors
|
Li, Chuan |
|
2008 |
17 |
5 |
p. 641-644 4 p. |
artikel |
14 |
Task-based modeling method for construction business process modeling and automation
|
Shi, Jonathan Jingsheng |
|
2008 |
17 |
5 |
p. 633-640 8 p. |
artikel |
15 |
Two photogrammetric methods for measuring flat elements in buildings under construction
|
Ordóñez, Celestino |
|
2008 |
17 |
5 |
p. 517-525 9 p. |
artikel |