nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A multi-stage data augmentation and AD-ResNet-based method for EPB utilization factor prediction
|
Yu, Honggan |
|
|
147 |
C |
p. |
artikel |
2 |
As-built BIM reconstruction of piping systems using PipeNet
|
Xie, Yuan |
|
|
147 |
C |
p. |
artikel |
3 |
Automated detection of construction work at heights and deployment of safety hooks using IMU with a barometer
|
Choo, Hunsang |
|
|
147 |
C |
p. |
artikel |
4 |
Automated detection of dangerous work zone for crawler crane guided by UAV images via Swin Transformer
|
Lu, Yanan |
|
|
147 |
C |
p. |
artikel |
5 |
Challenges of urban digital twins: A systematic review and a Delphi expert survey
|
Lei, Binyu |
|
|
147 |
C |
p. |
artikel |
6 |
Change component identification of BIM models for facility management based on time-variant BIMs or point clouds
|
Chuang, Tzu-Yi |
|
|
147 |
C |
p. |
artikel |
7 |
Deep learning-based relation extraction and knowledge graph-based representation of construction safety requirements
|
Wang, Xiyu |
|
|
147 |
C |
p. |
artikel |
8 |
Defocused calibration for large field-of-view binocular cameras
|
Meng, Zhichao |
|
|
147 |
C |
p. |
artikel |
9 |
Digital twin enhanced BIM to shape full life cycle digital transformation for bridge engineering
|
Honghong, Song |
|
|
147 |
C |
p. |
artikel |
10 |
Drift analysis and sectional post-processing of indoor simultaneous localization and mapping (SLAM)-based laser scanning data
|
Keitaanniemi, Aino |
|
|
147 |
C |
p. |
artikel |
11 |
3D standard motion time-based ergonomic risk analysis for workplace design in modular construction
|
Wang, Jingwen |
|
|
147 |
C |
p. |
artikel |
12 |
Editorial Board
|
|
|
|
147 |
C |
p. |
artikel |
13 |
Facility layout design for modular construction manufacturing: A comparison based on simulation and optimization
|
Yang, Zhongze |
|
|
147 |
C |
p. |
artikel |
14 |
Full-body pose estimation for excavators based on data fusion of multiple onboard sensors
|
Tang, Jingyuan |
|
|
147 |
C |
p. |
artikel |
15 |
Gaps and requirements for applying automatic architectural design to building renovation
|
Jiang, Shaohua |
|
|
147 |
C |
p. |
artikel |
16 |
High-resolution concrete damage image synthesis using conditional generative adversarial network
|
Li, Shengyuan |
|
|
147 |
C |
p. |
artikel |
17 |
Intelligent control of building fire protection system using digital twins and semantic web technologies
|
Jiang, Liu |
|
|
147 |
C |
p. |
artikel |
18 |
Intelligentization of wheel loader shoveling system based on multi-source data acquisition
|
Cao, Bingwei |
|
|
147 |
C |
p. |
artikel |
19 |
Intelligent technologies for construction machinery using data-driven methods
|
Zheng, Zhe |
|
|
147 |
C |
p. |
artikel |
20 |
Learning from explainable data-driven tunneling graphs: A spatio-temporal graph convolutional network for clogging detection
|
Gao, Yuyue |
|
|
147 |
C |
p. |
artikel |
21 |
Minimizing rebar cost using design and construction integration
|
Rahimi, Zahra |
|
|
147 |
C |
p. |
artikel |
22 |
Mobile crane selection in project logistics operations using Best and Worst Method (BWM) and fuzzy Measurement of Alternatives and Ranking according to COmpromise Solution (MARCOS)
|
Görçün, Ömer Faruk |
|
|
147 |
C |
p. |
artikel |
23 |
Multi-UAV trajectory planning for 3D visual inspection of complex structures
|
Ivić, Stefan |
|
|
147 |
C |
p. |
artikel |
24 |
Optimal procurement strategy for off-site prefabricated components considering construction schedule and cost
|
Chen, Gang |
|
|
147 |
C |
p. |
artikel |
25 |
Real-time detection of cracks in tiled sidewalks using YOLO-based method applied to unmanned aerial vehicle (UAV) images
|
Qiu, Qiwen |
|
|
147 |
C |
p. |
artikel |
26 |
Representation and assessment of spatial design using a hierarchical graph neural network: Classification of shopping center types
|
Yang, Lijing |
|
|
147 |
C |
p. |
artikel |
27 |
Satellite-based interferometry for monitoring structural deformations of bridge portfolios
|
Nettis, Andrea |
|
|
147 |
C |
p. |
artikel |
28 |
Simulating travel paths of construction site workers via deep reinforcement learning considering their spatial cognition and wayfinding behavior
|
Kim, Minguk |
|
|
147 |
C |
p. |
artikel |
29 |
Spatial-temporal fusion network for maximum ground surface settlement prediction during tunnel excavation
|
Chen, Liang |
|
|
147 |
C |
p. |
artikel |
30 |
Time series prediction of tunnel boring machine (TBM) performance during excavation using causal explainable artificial intelligence (CX-AI)
|
Wang, Kunyu |
|
|
147 |
C |
p. |
artikel |
31 |
Unifying transformer and convolution for dam crack detection
|
Zhang, Erhu |
|
|
147 |
C |
p. |
artikel |