nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Calendar
|
|
|
2004 |
13 |
3 |
p. 435-436 2 p. |
artikel |
2 |
DePlan: a tool for integrated design management
|
Choo, Hyun Jeong |
|
2004 |
13 |
3 |
p. 313-326 14 p. |
artikel |
3 |
Editorial Board
|
|
|
2004 |
13 |
3 |
p. IFC- 1 p. |
artikel |
4 |
Multi-agent systems in construction–state of the art and prospects
|
Ren, Z |
|
2004 |
13 |
3 |
p. 421-434 14 p. |
artikel |
5 |
Neural-network-based regression model of ground surface settlement induced by deep excavation
|
Sou-Sen, Leu |
|
2004 |
13 |
3 |
p. 279-289 11 p. |
artikel |
6 |
Optimizing the schedule of dispatching RMC trucks through genetic algorithms
|
Feng, Chung-Wei |
|
2004 |
13 |
3 |
p. 327-340 14 p. |
artikel |
7 |
Parametric 3D modeling in building construction with examples from precast concrete
|
Sacks, Rafael |
|
2004 |
13 |
3 |
p. 291-312 22 p. |
artikel |
8 |
PPMS: a Web-based construction Project Performance Monitoring System
|
Cheung, Sai On |
|
2004 |
13 |
3 |
p. 361-376 16 p. |
artikel |
9 |
Product modeling to support case-based construction planning and scheduling
|
Dzeng, Ren-Jye |
|
2004 |
13 |
3 |
p. 341-360 20 p. |
artikel |
10 |
Selection of renovation actions using multi-criteria “knapsack” model
|
Alanne, Kari |
|
2004 |
13 |
3 |
p. 377-391 15 p. |
artikel |
11 |
Self-contained automated construction deposition system
|
Williams II, Robert L. |
|
2004 |
13 |
3 |
p. 393-407 15 p. |
artikel |
12 |
Simulation-based optimization for dynamic resource allocation
|
Zhang, Hong |
|
2004 |
13 |
3 |
p. 409-420 12 p. |
artikel |