nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A computational methodology for generating modular design options for building extensions
|
Shahi, Sheida |
|
|
127 |
C |
p. |
artikel |
2 |
Adaptive robotic manufacturing using higher order knowledge systems
|
Neythalath, Narendrakrishnan |
|
|
127 |
C |
p. |
artikel |
3 |
An improved continuum model for determining the behavior of suspension bridges during construction
|
Li, Tao |
|
|
127 |
C |
p. |
artikel |
4 |
An open-source and extensible platform for general infrastructure asset management system
|
Asghari, Vahid |
|
|
127 |
C |
p. |
artikel |
5 |
A novel methodology for the path alignment of visual SLAM in indoor construction inspection
|
Lu, Tao |
|
|
127 |
C |
p. |
artikel |
6 |
A performance data integrated BIM framework for building life-cycle energy efficiency and environmental optimization design
|
Zhuang, Dian |
|
|
127 |
C |
p. |
artikel |
7 |
A practicality and safety-oriented approach for path planning in crane lifts
|
Hu, Songbo |
|
|
127 |
C |
p. |
artikel |
8 |
A rule-based system to automatically validate IFC second-level space boundaries for building energy analysis
|
Ying, Huaquan |
|
|
127 |
C |
p. |
artikel |
9 |
A tool for computer-generated dimensioned floorplans based on given adjacencies
|
Shekhawat, Krishnendra |
|
|
127 |
C |
p. |
artikel |
10 |
Automated process discovery from event logs in BIM construction projects
|
Pan, Yue |
|
|
127 |
C |
p. |
artikel |
11 |
A vision-based method for automatic tracking of construction machines at nighttime based on deep learning illumination enhancement
|
Xiao, Bo |
|
|
127 |
C |
p. |
artikel |
12 |
Comparison of different algorithms for time analysis for CPM schedule networks
|
Malyusz, Levente |
|
|
127 |
C |
p. |
artikel |
13 |
Computer vision-based interior construction progress monitoring: A literature review and future research directions
|
Ekanayake, Biyanka |
|
|
127 |
C |
p. |
artikel |
14 |
Design subspace learning: Structural design space exploration using performance-conditioned generative modeling
|
Danhaive, Renaud |
|
|
127 |
C |
p. |
artikel |
15 |
Developing a mold-free approach for complex glulam production with the assist of computer vision technologies
|
Chai, Hua |
|
|
127 |
C |
p. |
artikel |
16 |
Development of BIM-integrated construction robot task planning and simulation system
|
Kim, Sungjin |
|
|
127 |
C |
p. |
artikel |
17 |
Editorial Board
|
|
|
|
127 |
C |
p. |
artikel |
18 |
Folding analysis for thick origami with kinematic frame models concerning gravity
|
Zhang, Tianhao |
|
|
127 |
C |
p. |
artikel |
19 |
Framework for technical specifications of 3D concrete printers
|
Chung, Jihoon |
|
|
127 |
C |
p. |
artikel |
20 |
Hazard identification, risk assessment and control for dam construction safety using an integrated BWM and MARCOS approach under interval type-2 fuzzy sets environment
|
Celik, Erkan |
|
|
127 |
C |
p. |
artikel |
21 |
Human centric accessibility graph for environment analysis
|
Schwartz, Mathew |
|
|
127 |
C |
p. |
artikel |
22 |
Hybrid deep learning model for automating constraint modelling in advanced working packaging
|
Wu, Chengke |
|
|
127 |
C |
p. |
artikel |
23 |
Integrated digital twin and blockchain framework to support accountable information sharing in construction projects
|
Lee, Dongmin |
|
|
127 |
C |
p. |
artikel |
24 |
Mobile projective augmented reality for collaborative robots in construction
|
Xiang, Siyuan |
|
|
127 |
C |
p. |
artikel |
25 |
Mosaicking of mountain tunnel images guided by laser rangefinder
|
Du, Meng |
|
|
127 |
C |
p. |
artikel |
26 |
Multi-criteria decision analysis for tower crane layout planning in high-rise modular integrated construction
|
Zhang, Zhiqian |
|
|
127 |
C |
p. |
artikel |
27 |
Multi-objective optimization of lean-based repetitive scheduling using batch and pull production
|
Saad, Dina A. |
|
|
127 |
C |
p. |
artikel |
28 |
Multi-system intervention optimization for interdependent infrastructure
|
Kammouh, Omar |
|
|
127 |
C |
p. |
artikel |
29 |
Optimization of multiple-crane service schedules in overlapping areas through consideration of transportation efficiency and operational safety
|
Huang, Chun |
|
|
127 |
C |
p. |
artikel |
30 |
Planning low-error SHM strategy by constrained observability method
|
Peng, Tian |
|
|
127 |
C |
p. |
artikel |
31 |
Presenting the best prediction model of water inflow into drill and blast tunnels among several machine learning techniques
|
Mahmoodzadeh, Arsalan |
|
|
127 |
C |
p. |
artikel |
32 |
Reinforcement learning based process optimization and strategy development in conventional tunneling
|
Erharter, Georg H. |
|
|
127 |
C |
p. |
artikel |
33 |
Reinforcement method for 3D concrete printing using paste-coated bar penetrations
|
Marchment, Taylor |
|
|
127 |
C |
p. |
artikel |
34 |
Scan-to-BIM for the infrastructure domain: Generation of IFC-compliant models of road infrastructure assets and semantics using 3D point cloud data
|
Justo, Andrés |
|
|
127 |
C |
p. |
artikel |
35 |
The application of blockchain-based crypto assets for integrating the physical and financial supply chains in the construction & engineering industry
|
Hamledari, Hesam |
|
|
127 |
C |
p. |
artikel |
36 |
Towards automatic digital documentation and progress reporting of mechanical construction pipes using smartphones
|
Maalek, Reza |
|
|
127 |
C |
p. |
artikel |
37 |
Trajectory control of electro-hydraulic position servo system using improved PSO-PID controller
|
Feng, Hao |
|
|
127 |
C |
p. |
artikel |