nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Action-based union of the temporal opposites in scheduling: non-deterministic approach
|
Yagi, Junichi |
|
2003 |
12 |
3 |
p. 321-329 9 p. |
artikel |
2 |
An automated partnering monitoring system—Partnering Temperature Index
|
Cheung, Sai On |
|
2003 |
12 |
3 |
p. 331-345 15 p. |
artikel |
3 |
An effective simulation mechanism for construction operations
|
Cheng, Tao-ming |
|
2003 |
12 |
3 |
p. 227-244 18 p. |
artikel |
4 |
Calendar
|
|
|
2003 |
12 |
3 |
p. 347- 1 p. |
artikel |
5 |
Case handling in construction
|
van der Aalst, W.M.P. |
|
2003 |
12 |
3 |
p. 303-320 18 p. |
artikel |
6 |
Development of an object-oriented scheduling model for construction projects
|
Fan, Su-Ling |
|
2003 |
12 |
3 |
p. 283-302 20 p. |
artikel |
7 |
Editorial Board
|
|
|
2003 |
12 |
3 |
p. IFC- 1 p. |
artikel |
8 |
Hybrid use of AI techniques in developing construction management tools
|
Ko, Chien-Ho |
|
2003 |
12 |
3 |
p. 271-281 11 p. |
artikel |
9 |
Load-independent control of a hydraulic excavator
|
Budny, Eugeniusz |
|
2003 |
12 |
3 |
p. 245-254 10 p. |
artikel |
10 |
Viewer controllable visualization for construction document processing
|
Zhu, Yimin |
|
2003 |
12 |
3 |
p. 255-269 15 p. |
artikel |