nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
An integrated approach to automatic pixel-level crack detection and quantification of asphalt pavement
|
Ji, Ankang |
|
|
114 |
C |
p. |
artikel |
2 |
Automated checking of building component accessibility for maintenance
|
Akanmu, Abiola A. |
|
|
114 |
C |
p. |
artikel |
3 |
BIM-based immersive Virtual Reality for construction workspace planning: A safety-oriented approach
|
Getuli, Vito |
|
|
114 |
C |
p. |
artikel |
4 |
Collaborative relationship discovery in BIM project delivery: A social network analysis approach
|
Wang, Yongqi |
|
|
114 |
C |
p. |
artikel |
5 |
Deep learning-based roadway crack classification using laser-scanned range images: A comparative study on hyperparameter selection
|
Zhou, Shanglian |
|
|
114 |
C |
p. |
artikel |
6 |
Design exploration of quantitative performance and geometry typology for indoor arena based on self-organizing map and multi-layered perceptron neural network
|
Pan, Wang |
|
|
114 |
C |
p. |
artikel |
7 |
Design of prefabricated wall-floor building systems using meta-heuristic optimization algorithms
|
Baghdadi, Abtin |
|
|
114 |
C |
p. |
artikel |
8 |
Detecting semantic regions of construction site images by transfer learning and saliency computation
|
Chen, Ling |
|
|
114 |
C |
p. |
artikel |
9 |
Dimensionality in BIM: Why BIM cannot have more than four dimensions?
|
Koutamanis, Alexander |
|
|
114 |
C |
p. |
artikel |
10 |
3D-printed attachable kinetic shading device with alternate actuation: Use of shape-memory alloy (SMA) for climate-adaptive responsive architecture
|
Yi, Hwang |
|
|
114 |
C |
p. |
artikel |
11 |
Editorial Board
|
|
|
|
114 |
C |
p. |
artikel |
12 |
Evaluating industrial modularization strategies: Local vs. overseas fabrication
|
Nekouvaght Tak, Ala |
|
|
114 |
C |
p. |
artikel |
13 |
Human activity classification based on sound recognition and residual convolutional neural network
|
Jung, Minhyuk |
|
|
114 |
C |
p. |
artikel |
14 |
Integrated project delivery with blockchain: An automated financial system
|
Elghaish, Faris |
|
|
114 |
C |
p. |
artikel |
15 |
Integrating advanced technologies to uphold security of payment: Data flow diagram
|
Chong, Heap-Yih |
|
|
114 |
C |
p. |
artikel |
16 |
Intelligent rebar layout in RC building frames using artificial potential field
|
Liu, Jiepeng |
|
|
114 |
C |
p. |
artikel |
17 |
Multi-objective optimisation of deployable bistable scissor structures
|
Arnouts, L.I.W. |
|
|
114 |
C |
p. |
artikel |
18 |
Precision versus intelligence: Autonomous supporting pressure balance control for slurry shield tunnel boring machines
|
Zhang, Yakun |
|
|
114 |
C |
p. |
artikel |
19 |
Semi-automatic detection of buried rebar in GPR data using a genetic algorithm
|
Wang, Yanhui |
|
|
114 |
C |
p. |
artikel |
20 |
Similarity search and performance prediction of shield tunnels in operation through time series data mining
|
Zhu, Hehua |
|
|
114 |
C |
p. |
artikel |
21 |
Spatial reasoning mechanism to enable automated adaptive trajectory planning in ground penetrating radar survey
|
Yuan, Chenxi |
|
|
114 |
C |
p. |
artikel |
22 |
Structuring the context for construction robot development through integrated scenario approach
|
Pan, Mi |
|
|
114 |
C |
p. |
artikel |
23 |
Towards a semantic Construction Digital Twin: Directions for future research
|
Boje, Calin |
|
|
114 |
C |
p. |
artikel |
24 |
User exemplar-based building element retrieval from raw point clouds using deep point-level features
|
Zeng, Shiqin |
|
|
114 |
C |
p. |
artikel |
25 |
XGBoost algorithm-based prediction of concrete electrical resistivity for structural health monitoring
|
Dong, Wei |
|
|
114 |
C |
p. |
artikel |