nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Adaptive computer vision-based 2D tracking of workers in complex environments
|
Konstantinou, Eirini |
|
2019 |
103 |
C |
p. 168-184 |
artikel |
2 |
Additive manufacturing as an enabling technology for digital construction: A perspective on Construction 4.0
|
Craveiro, Flávio |
|
2019 |
103 |
C |
p. 251-267 |
artikel |
3 |
An algorithm to facet curved walls in IFC BIM for building energy analysis
|
Ying, Huaquan |
|
2019 |
103 |
C |
p. 80-103 |
artikel |
4 |
Analysis of negative impacts of BIM-enabled information transparency on contractors' interests
|
Guo, Hongling |
|
2019 |
103 |
C |
p. 67-79 |
artikel |
5 |
An automatic and non-invasive physical fatigue assessment method for construction workers
|
Yu, Yantao |
|
2019 |
103 |
C |
p. 1-12 |
artikel |
6 |
Automated design and modeling for mass-customized housing. A web-based design space catalog for timber structures
|
Bianconi, Fabio |
|
2019 |
103 |
C |
p. 13-25 |
artikel |
7 |
Automatic damage detection of historic masonry buildings based on mobile deep learning
|
Wang, Niannian |
|
2019 |
103 |
C |
p. 53-66 |
artikel |
8 |
Dealing with uncertainty in sewer condition assessment: Impact on inspection programs
|
Roghani, Bardia |
|
2019 |
103 |
C |
p. 117-126 |
artikel |
9 |
Design and modelling of a modular window cleaning robot
|
Vega-Heredia, M. |
|
2019 |
103 |
C |
p. 268-278 |
artikel |
10 |
Earned Schedule min-max: Two new EVM metrics for monitoring and controlling projects
|
Ballesteros-Pérez, P. |
|
2019 |
103 |
C |
p. 279-290 |
artikel |
11 |
Editorial Board
|
|
|
2019 |
103 |
C |
p. ii |
artikel |
12 |
Extraction of pipes and flanges from point clouds for automated verification of pre-fabricated modules in oil and gas refinery projects
|
Maalek, Reza |
|
2019 |
103 |
C |
p. 150-167 |
artikel |
13 |
Feature-based topology finding of patterns for shell structures
|
Oval, R. |
|
2019 |
103 |
C |
p. 185-201 |
artikel |
14 |
Informetric analysis and review of literature on the role of BIM in sustainable construction
|
Santos, Rúben |
|
2019 |
103 |
C |
p. 221-234 |
artikel |
15 |
Integration of BIM and GIS in sustainable built environment: A review and bibliometric analysis
|
Wang, Hao |
|
2019 |
103 |
C |
p. 41-52 |
artikel |
16 |
Integration of LCA and LCC analysis within a BIM-based environment
|
Santos, Rúben |
|
2019 |
103 |
C |
p. 127-149 |
artikel |
17 |
Interlinking geospatial and building geometry with existing and developing standards on the web
|
McGlinn, Kris |
|
2019 |
103 |
C |
p. 235-250 |
artikel |
18 |
Monte Carlo simulation for tolerance analysis in prefabrication and offsite construction
|
Rausch, Christopher |
|
2019 |
103 |
C |
p. 300-314 |
artikel |
19 |
Phantom float in commercial scheduling software
|
Franco-Duran, Diana M. |
|
2019 |
103 |
C |
p. 291-299 |
artikel |
20 |
Project controls for electrical, instrumentation and control systems: Enabling role of digital system information modelling
|
Love, Peter E.D. |
|
2019 |
103 |
C |
p. 202-212 |
artikel |
21 |
Trajectory adaptation for an impedance controlled cooperative robot according to an operator's force
|
Yousefizadeh, Shirin |
|
2019 |
103 |
C |
p. 213-220 |
artikel |
22 |
Usability studies on building early stage architectural models in virtual reality
|
de Klerk, Rui |
|
2019 |
103 |
C |
p. 104-116 |
artikel |
23 |
Visualization of indoor thermal environment on mobile devices based on augmented reality and computational fluid dynamics
|
Lin, Jia-Rui |
|
2019 |
103 |
C |
p. 26-40 |
artikel |