no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
Adaptive control charts: A Markovian approach for processes subject to independent disturbances
|
De Magalhães, Maysa S. |
|
2006 |
99 |
1-2 |
p. 236-246 11 p. |
article |
2 |
A heuristic for scheduling a permutation flowshop with makespan objective subject to maximum tardiness
|
Framinan, Jose M. |
|
2006 |
99 |
1-2 |
p. 28-40 13 p. |
article |
3 |
A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times
|
Nait Tahar, Djamel |
|
2006 |
99 |
1-2 |
p. 63-73 11 p. |
article |
4 |
Analysis of a production/inventory system with randomly failing production unit subjected to a minimum required availability level
|
Chelbi, Anis |
|
2006 |
99 |
1-2 |
p. 131-143 13 p. |
article |
5 |
An investigation into the use of ERP systems in the service sector
|
Botta-Genoulaz, Valérie |
|
2006 |
99 |
1-2 |
p. 202-221 20 p. |
article |
6 |
A sequential heuristic procedure for the two-dimensional cutting-stock problem
|
Suliman, S.M.A. |
|
2006 |
99 |
1-2 |
p. 177-185 9 p. |
article |
7 |
Comparison of negotiation protocols in dynamic agent-based manufacturing systems
|
Reaidy, Jihad |
|
2006 |
99 |
1-2 |
p. 117-130 14 p. |
article |
8 |
Contents
|
|
|
2006 |
99 |
1-2 |
p. x- 1 p. |
article |
9 |
Control and management of productive systems
|
Artiba, Abdelhakim |
|
2006 |
99 |
1-2 |
p. 1-3 3 p. |
article |
10 |
Diary of Events
|
|
|
2006 |
99 |
1-2 |
p. 247-248 2 p. |
article |
11 |
Dynamic card controlling in a Conwip system
|
Framinan, Jose M. |
|
2006 |
99 |
1-2 |
p. 102-116 15 p. |
article |
12 |
Editorial Board
|
|
|
2006 |
99 |
1-2 |
p. CO2- 1 p. |
article |
13 |
Flow shop scheduling problem with limited machine availability: A heuristic approach
|
Aggoune, Riad |
|
2006 |
99 |
1-2 |
p. 4-15 12 p. |
article |
14 |
Operating rooms scheduling
|
Jebali, Aïda |
|
2006 |
99 |
1-2 |
p. 52-62 11 p. |
article |
15 |
Optimal design of work-in-process buffers
|
Faria, José |
|
2006 |
99 |
1-2 |
p. 144-155 12 p. |
article |
16 |
Scalable enterprise systems: Quality management issues
|
Temponi, Cecilia |
|
2006 |
99 |
1-2 |
p. 222-235 14 p. |
article |
17 |
Scheduling issues for environmentally responsible manufacturing: The case of hoist scheduling in an electroplating line
|
Subaï, Corinne |
|
2006 |
99 |
1-2 |
p. 74-87 14 p. |
article |
18 |
Scheduling of a two-machine flowshop with availability constraints on the first machine
|
Allaoui, H. |
|
2006 |
99 |
1-2 |
p. 16-27 12 p. |
article |
19 |
Stochastic algorithms: Using the worst to reach the best
|
Baptiste, Pierre |
|
2006 |
99 |
1-2 |
p. 41-51 11 p. |
article |
20 |
Throughput maximization in serial production lines with worksharing
|
Chen, Jiaqiong |
|
2006 |
99 |
1-2 |
p. 88-101 14 p. |
article |
21 |
Urban traffic systems modelling methodology
|
Chabrol, Michelle |
|
2006 |
99 |
1-2 |
p. 156-176 21 p. |
article |
22 |
Value and risk assessment of supply chain management improvement projects
|
Brun, Alessandro |
|
2006 |
99 |
1-2 |
p. 186-201 16 p. |
article |