nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A beam search heuristic method for mixed-model scheduling with setups
|
McMullen, P.R. |
|
2005 |
96 |
2 |
p. 273-283 11 p. |
artikel |
2 |
A bi-objective model for robust resource-constrained project scheduling
|
Al-Fawzan, M.A. |
|
2005 |
96 |
2 |
p. 175-187 13 p. |
artikel |
3 |
A collaborative application portal for the mould industry
|
Li, Minbo |
|
2005 |
96 |
2 |
p. 233-247 15 p. |
artikel |
4 |
A linearization approach for inventory models with variable lead time
|
Chang, Ching-Ter |
|
2005 |
96 |
2 |
p. 263-272 10 p. |
artikel |
5 |
Diary of Events
|
|
|
2005 |
96 |
2 |
p. 285-286 2 p. |
artikel |
6 |
Group scheduling in flexible flow shops
|
Logendran, Rasaratnam |
|
2005 |
96 |
2 |
p. 143-155 13 p. |
artikel |
7 |
IFC (Editorial Board)
|
|
|
2005 |
96 |
2 |
p. IFC- 1 p. |
artikel |
8 |
Integrated fuzzy logic-based model for product modularization during concept development phase
|
Nepal, Bimal |
|
2005 |
96 |
2 |
p. 157-174 18 p. |
artikel |
9 |
Joint determination of target value and production run for a process with multiple markets
|
Hariga, Moncer A. |
|
2005 |
96 |
2 |
p. 201-212 12 p. |
artikel |
10 |
Multi-job lot streaming to minimize the mean completion time in m-1 hybrid flowshops
|
Zhang, Wei |
|
2005 |
96 |
2 |
p. 189-200 12 p. |
artikel |
11 |
On the design of variable sample size and sampling intervals X ¯ charts under non-normality
|
Lin, Yu-Chang |
|
2005 |
96 |
2 |
p. 249-261 13 p. |
artikel |
12 |
Tradeoffs between base stock levels, numbers of kanbans, and planned supply lead times in production/inventory systems with advance demand information
|
Liberopoulos, George |
|
2005 |
96 |
2 |
p. 213-232 20 p. |
artikel |