Digital Library
Close Browse articles from a journal
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
                                       All articles of the corresponding issues
 
                             99 results found
no title author magazine year volume issue page(s) type
1 A comment on Martin's: Note on an EOQ model with a temporary sale price Goyal, S.K.
1996
93-94 2-3 p. 283-284
2 p.
article
2 A conceptual and analytical framework for business process reengineering Chan, Stephen L.
1997
93-94 2-3 p. 211-223
13 p.
article
3 Addendum to: ”Determining economic replenishment interval for linear trend in demand [Int. J. Production Economics 34 (1994) 115–117] Goyal, S.K.
1995
93-94 2-3 p. 293-
1 p.
article
4 A fuzzy pooling of investment cost knowledge Dohnal, M.
1996
93-94 2-3 p. 91-106
16 p.
article
5 A hybrid econometric—neural network modeling approach for sales forecasting Luxhøj, James T.
1996
93-94 2-3 p. 175-192
18 p.
article
6 A mathematical programming approach towards optimized master production scheduling Chu, Sydney C.K.
1995
93-94 2-3 p. 269-279
11 p.
article
7 Ambiguity in multicriteria quality decisions Gutiérrez, Isabel
1995
93-94 2-3 p. 215-224
10 p.
article
8 A multipass optimization strategy for CNC lathe operations Yeo, S.H.
1995
93-94 2-3 p. 209-218
10 p.
article
9 An economic approach to job shop performance analysis (Van) Enns, S.T.
1995
93-94 2-3 p. 117-131
15 p.
article
10 An efficient heuristic procedure for the single-item, discrete lot sizing problem Canel, Cem
1996
93-94 2-3 p. 139-148
10 p.
article
11 An empirical study of capital budgeting practices for strategic investments in CIM technologies Slagmulder, Regine
1995
93-94 2-3 p. 121-152
32 p.
article
12 An example of the application of production system design tools for the implementation of business process reengineering Jones, Thomas M.
1997
93-94 2-3 p. 69-78
10 p.
article
13 An instrument for quality performance measurement De Toni, A.
1995
93-94 2-3 p. 199-207
9 p.
article
14 Announcement 1995
93-94 2-3 p. 239-240
2 p.
article
15 An options view of investments in expansion-flexible manufacturing systems Kumar, Ram L.
1995
93-94 2-3 p. 281-291
11 p.
article
16 Approximation approach for the performance analysis of production lines under a kanban discipline Albino, Vito
1995
93-94 2-3 p. 197-207
11 p.
article
17 Approximations for the mean and variance of the throughput of flexible manufacturing cells Wang, P.Patrick
1994
93-94 2-3 p. 275-284
10 p.
article
18 A project activity scheduling problem with net present value measure Sung, C.S.
1994
93-94 2-3 p. 177-187
11 p.
article
19 A strategic alignment approach for effective business process reengineering: linking strategy, processes and customers for competitive advantage Lockamy III, Archie
1997
93-94 2-3 p. 141-153
13 p.
article
20 A tabu search heuristic for the multiprocessor scheduling problem with sequence dependent setup times França, Paulo M.
1996
93-94 2-3 p. 79-89
11 p.
article
21 Author index to volume 40 1995
93-94 2-3 p. 241-242
2 p.
article
22 Author index to volume 38 1995
93-94 2-3 p. 299-300
2 p.
article
23 Author index to volume 50 1997
93-94 2-3 p. 277-278
2 p.
article
24 Author index to volume 43 1996
93-94 2-3 p. 303-304
2 p.
article
25 Author index to volume 37 1994
93-94 2-3 p. 295-296
2 p.
article
26 Batching in production planning for flexible manufacturing systems Srivastava, Bharatendu
1996
93-94 2-3 p. 127-137
11 p.
article
27 Batching policies for linearly increasing demand with a finite input rate Hill, Roger M.
1996
93-94 2-3 p. 149-154
6 p.
article
28 Bevölkerungsentwicklung, rentenfinanzierung und einkommenverteilung Petersen, Jørn Henrik
1996
93-94 2-3 p. 285-297
13 p.
article
29 Business process reengineering: Modelling and analysis Gunasekaran, A.
1997
93-94 2-3 p. 65-68
4 p.
article
30 Call for papers 1994
93-94 2-3 p. 293-
1 p.
article
31 Combined heuristics for bi-level group scheduling problems Logendran, Rasaratnam
1995
93-94 2-3 p. 133-145
13 p.
article
32 Competitive factors and performance measurement: Applying the theory of constraints to meet customer needs Wahlers, James L.
1994
93-94 2-3 p. 229-240
12 p.
article
33 Component kitting in semi-automated printed circuit board assembly Günther, H.O.
1996
93-94 2-3 p. 213-226
14 p.
article
34 Contents volume 50 1997
93-94 2-3 p. 279-280
2 p.
article
35 Contents volume 43 1996
93-94 2-3 p. 305-306
2 p.
article
36 Contents volume 37 1994
93-94 2-3 p. 297-298
2 p.
article
37 Contents volume 40 1995
93-94 2-3 p. 243-244
2 p.
article
38 Contents volume 38lume 38 1995
93-94 2-3 p. 301-302
2 p.
article
39 Corporate control of investments and management styles Segelod, Esbjörn
1996
93-94 2-3 p. 227-237
11 p.
article
40 Determination of the optimal target values for a filling process when inspection is based on a correlated variable Lee, Min Koo
1994
93-94 2-3 p. 205-213
9 p.
article
41 Development of computer-aided machining optimisation for multi-pass rough turning operations Kee, P.K.
1994
93-94 2-3 p. 215-227
13 p.
article
42 Diary of events 1995
93-94 2-3 p. 295-298
4 p.
article
43 Diary of events 1995
93-94 2-3 p. 235-238
4 p.
article
44 Diary of events 1996
93-94 2-3 p. 299-301
3 p.
article
45 Diary of events 1997
93-94 2-3 p. 275-276
2 p.
article
46 Diary of events 1994
93-94 2-3 p. 289-292
4 p.
article
47 Distribution planning for a divergent N-echelon network without intermediate stocks under service restrictions Verrijdt, J.H.C.M.
1995
93-94 2-3 p. 225-243
19 p.
article
48 Due-date assignment and single machine scheduling with compressible processing times Cheng, T.C.E.
1996
93-94 2-3 p. 107-113
7 p.
article
49 Empirically testing ES success factors in business process reengineering Guimaraes, Tor
1997
93-94 2-3 p. 245-259
15 p.
article
50 Empirically testing the antecedents of BPR success Guimaraes, Tor
1997
93-94 2-3 p. 199-210
12 p.
article
51 Erratum to: “An analytic eclectic heuristic for replenishment with linear increasing demand” [Int. J. Production Economics 32 (1993) 261] Yang, J.
1994
93-94 2-3 p. 285-
1 p.
article
52 Erratum to: “Safety stocks in multistage divergent inventory systems: A survey” [Int. J. production economics 35(1994) 321] Inderfurth, Karl
1994
93-94 2-3 p. 287-288
2 p.
article
53 Estimation of investment costs in fish processing plants Montaner, María Inés
1995
93-94 2-3 p. 153-161
9 p.
article
54 Evaluating product and process design changes with warranty data Majeske, Karl D.
1997
93-94 2-3 p. 79-89
11 p.
article
55 Evaluation of corporate environmental management approaches: A framework and application Vastag, Gyula
1996
93-94 2-3 p. 193-211
19 p.
article
56 Evolving requirements for a reengineering model for ferrous foundries in India — An experience Shivappa, D.N.
1997
93-94 2-3 p. 225-243
19 p.
article
57 Formal business process engineering based on graph grammars Klauck, Christoph
1997
93-94 2-3 p. 129-140
12 p.
article
58 From TQM to BPR: Two case studies in personnel administration De Bruyn, Barbara
1997
93-94 2-3 p. 169-181
13 p.
article
59 Human-resource-based models of production systems Hempel, Paul S.
1996
93-94 2-3 p. 239-249
11 p.
article
60 Implementing flexible automation: A multiple criteria decision making approach Lotfi, Vahid
1995
93-94 2-3 p. 255-268
14 p.
article
61 Industrial job-shop scheduling with random operations and different priorities Golenko-Ginzburg, Dimitri
1995
93-94 2-3 p. 185-195
11 p.
article
62 In memoriam: Professor John Leonard Burbidge OBE, 1915–1995 Grubbström, Robert W.
1996
93-94 2-3 p. 259-
1 p.
article
63 Joint pricing and replenishment policy for deteriorating inventory with declining market Wee, Hui-Ming
1995
93-94 2-3 p. 163-171
9 p.
article
64 Layout design in group technology manufacturing Hassan, Mohsen M.D.
1995
93-94 2-3 p. 173-188
16 p.
article
65 Layout problem for an aircraft maintenance company tool room Miu-ling Rosa, Lee
1995
93-94 2-3 p. 219-230
12 p.
article
66 Learning-induced control model to allocate managerial resources for production technology development Kim, Bowon
1996
93-94 2-3 p. 267-282
16 p.
article
67 Lynn Underwood: Intelligent manufacturing Wimmer, Ágnes
1995
93-94 2-3 p. 231-
1 p.
article
68 Managing demand uncertainty through order overplanning Bartezzaghi, Emilio
1995
93-94 2-3 p. 107-120
14 p.
article
69 Manufacturing cost estimation for PCB assembly: An activity-based approach Ong, N.S.
1995
93-94 2-3 p. 159-172
14 p.
article
70 Market share and warranty costs for renewable warranty programs Mitra, Amitava
1997
93-94 2-3 p. 155-168
14 p.
article
71 New wave manufacturing strategies: Organization and human resource management dimensions Demeter, Krisztina
1995
93-94 2-3 p. 232-
1 p.
article
72 Note on an EOQ model with a temporary sale price Martin, G.E.
1994
93-94 2-3 p. 241-243
3 p.
article
73 On the utilization of a split production system with inter-stage inspection Gopalan, M.N.
1995
93-94 2-3 p. 107-116
10 p.
article
74 Optimal pricing and product-planning for new multiattribute products based on conjoint analysis Yoo, Dong-il
1995
93-94 2-3 p. 245-253
9 p.
article
75 Pension incentives and job mobility Petersen, Jørn Henrik
1996
93-94 2-3 p. 285-297
13 p.
article
76 Performance modeling of an FMS with finite input and output buffers Sung, C.S.
1994
93-94 2-3 p. 161-175
15 p.
article
77 Performance modeling of multistage production systems operating under hybrid push/pull control Pandey, P.C.
1996
93-94 2-3 p. 115-126
12 p.
article
78 Private pension policies in industrialized countries Petersen, Jørn Henrik
1996
93-94 2-3 p. 285-297
13 p.
article
79 Process reengineering: A review of enablers Love, P.E.D.
1997
93-94 2-3 p. 183-197
15 p.
article
80 Public pension economics Petersen, Jørn Henrik
1996
93-94 2-3 p. 285-297
13 p.
article
81 Publisher's note 1994
93-94 2-3 p. 159-
1 p.
article
82 Reengineering the production planning process in the food industry Houghton, Erne
1997
93-94 2-3 p. 105-116
12 p.
article
83 Regulating employment and welfare Petersen, Jørn Henrik
1996
93-94 2-3 p. 285-297
13 p.
article
84 Reply on “Note on an EOQ model with a temporary sale price” Tersine, Richard J.
1994
93-94 2-3 p. 245-
1 p.
article
85 Strategic planning in manufacturing systems — AHP application to an equipment replacement decision Oeltjenbruns, Henning
1995
93-94 2-3 p. 189-197
9 p.
article
86 Telecommunications in Greece: A study of production structure and natural monopoly issue Christodoulopoulos, Th.
1995
93-94 2-3 p. 147-157
11 p.
article
87 The application of an open queueing network to the analysis of cycle time, variability, throughput, inventory and cost in the batch production system of a microelectronics manufacturer Lynes, Krysia
1994
93-94 2-3 p. 189-203
15 p.
article
88 The economics of pensions and variable retirement schemes Petersen, Jørn Henrik
1996
93-94 2-3 p. 285-297
13 p.
article
89 The effects of task and information asymmetry on business process redesign Seidmann, Abraham
1997
93-94 2-3 p. 117-128
12 p.
article
90 The first step in planning group technology Burbidge, John L.
1996
93-94 2-3 p. 261-266
6 p.
article
91 The impact of multiple stocking points on system profitability Meller, Russell D.
1995
93-94 2-3 p. 209-214
6 p.
article
92 The management of manufacturing models and analysis Dolgos, Olga
1995
93-94 2-3 p. 233-
1 p.
article
93 The obstacles to successful CIM McGaughey, Ronald E.
1994
93-94 2-3 p. 247-258
12 p.
article
94 The practice of production control techniques in the manufacturing sectors in the Eastern Province of Saudi Arabia Andijani, A.
1996
93-94 2-3 p. 251-258
8 p.
article
95 The role of information technology in business process reengineering Gunasekaran, A.
1997
93-94 2-3 p. 91-104
14 p.
article
96 The strategic evaluation of candidate business process reengineering projects Sarkis, Joseph
1997
93-94 2-3 p. 261-274
14 p.
article
97 The utilization of artificial intelligence to achieve availability improvement in automated manufacture Davies, A.
1994
93-94 2-3 p. 259-274
16 p.
article
98 Travel time models in automated storage/retrieval systems: A critical review Sarker, Bhaba R.
1995
93-94 2-3 p. 173-184
12 p.
article
99 What difference does your industry make? Hamblin, David
1996
93-94 2-3 p. 155-174
20 p.
article
                             99 results found
 
 Koninklijke Bibliotheek - National Library of the Netherlands