no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
A finite horizon lot-sizing problem with time-varying deterministic demand and waiting-time-dependent partial backlogging
|
Zhou, Yong-Wu |
|
2004 |
91 |
2 |
p. 109-119 11 p. |
article |
2 |
Approach of just-in-time distribution requirements planning for supply chain management
|
Wang, Wei |
|
2004 |
91 |
2 |
p. 101-107 7 p. |
article |
3 |
Call for Papers: Yeung-Corbett
|
|
|
2004 |
91 |
2 |
p. I-II nvt p. |
article |
4 |
Cost-optimization heuristic algorithm in safety engineering
|
Avner, Ben-Yair |
|
2004 |
91 |
2 |
p. 149-164 16 p. |
article |
5 |
Diary of Events
|
|
|
2004 |
91 |
2 |
p. 199-200 2 p. |
article |
6 |
Exact, approximate, and generic iterative models for the multi-product Newsboy problem with budget constraint
|
Abdel-Malek, Layek |
|
2004 |
91 |
2 |
p. 189-198 10 p. |
article |
7 |
IFC (Editorial Board)
|
|
|
2004 |
91 |
2 |
p. IFC- 1 p. |
article |
8 |
Modelling the slab stack shuffling problem in developing steel rolling schedules and its solution using improved Parallel Genetic Algorithms
|
Singh, Kumar Ashutosh |
|
2004 |
91 |
2 |
p. 135-147 13 p. |
article |
9 |
Order arrival control of an M/M/1 failure prone service station
|
Kuo, Yarlin |
|
2004 |
91 |
2 |
p. 179-188 10 p. |
article |
10 |
Parallel-machine batch scheduling to minimize the maximum lateness and the number of tardy jobs
|
Lin, B.M.T |
|
2004 |
91 |
2 |
p. 121-134 14 p. |
article |
11 |
Parametric vs. neural network models for the estimation of production costs: A case study in the automotive industry
|
Cavalieri, Sergio |
|
2004 |
91 |
2 |
p. 165-177 13 p. |
article |