Digital Library
Close Browse articles from a journal
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
                                       All articles of the corresponding issues
 
                             10 results found
no title author magazine year volume issue page(s) type
1 A case study on the multistage IC final testing scheduling problem with reentry Pearn, W.L.
2004
88 3 p. 257-267
11 p.
article
2 A heuristic to minimize makespan of cell scheduling problem Solimanpur, M.
2004
88 3 p. 231-241
11 p.
article
3 AHP approach in the credit evaluation of the manufacturing firms in Turkey Yurdakul, Mustafa
2004
88 3 p. 269-289
21 p.
article
4 An empirical study of ISO certification in the maquiladora industry Dowlatshahi, Shad
2004
88 3 p. 291-306
16 p.
article
5 An EOQ model with deteriorating items under inflation when supplier credits linked to order quantity Chang, Chun-Tao
2004
88 3 p. 307-316
10 p.
article
6 Author index to this Volume 2004
88 3 p. 319-320
2 p.
article
7 Contents of this Volume 2004
88 3 p. 321-322
2 p.
article
8 Diary of Events 2004
88 3 p. 317-318
2 p.
article
9 IFC (Editorial Board) 2004
88 3 p. IFC-
1 p.
article
10 Optimizing assembly planning through a three-stage integrated approach Chen, Ruey-Shun
2004
88 3 p. 243-256
14 p.
article
                             10 results found
 
 Koninklijke Bibliotheek - National Library of the Netherlands