nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Contents
|
|
|
2003 |
85 |
1 |
p. viii- 1 p. |
artikel |
2 |
Continuous review inventory model with delay in payments
|
Salameh, M.K. |
|
2003 |
85 |
1 |
p. 91-95 5 p. |
artikel |
3 |
Controlling multi-level production in a rolling-schedule environment
|
Dellaert, Nico |
|
2003 |
85 |
1 |
p. 113-121 9 p. |
artikel |
4 |
Countering forgetting through training and deployment
|
Jaber, Mohamad Y. |
|
2003 |
85 |
1 |
p. 33-46 14 p. |
artikel |
5 |
Diary of Events
|
|
|
2003 |
85 |
1 |
p. 123- 1 p. |
artikel |
6 |
IFC (Editorial Board)
|
|
|
2003 |
85 |
1 |
p. IFC- 1 p. |
artikel |
7 |
Integration of simulation and optimization for solving complex decision making problems
|
Iassinovski, S. |
|
2003 |
85 |
1 |
p. 3-10 8 p. |
artikel |
8 |
M A MA - S : An introduction to a methodological approach for the simulation of distributed industrial systems
|
Galland, S |
|
2003 |
85 |
1 |
p. 11-31 21 p. |
artikel |
9 |
MIP-based heuristics for capacitated lotsizing problems
|
Mercé, C. |
|
2003 |
85 |
1 |
p. 97-111 15 p. |
artikel |
10 |
Operating theatre planning
|
Guinet, Alain |
|
2003 |
85 |
1 |
p. 69-81 13 p. |
artikel |
11 |
Overflow analysis and cross-trained servers
|
Chevalier, Philippe |
|
2003 |
85 |
1 |
p. 47-60 14 p. |
artikel |
12 |
Performance evaluation, planning and control, of productive systems
|
Artiba, Abdelhakim |
|
2003 |
85 |
1 |
p. 1-2 2 p. |
artikel |
13 |
The effects of a simple arrival rate control policy on throughput and work-in-process in production systems with workload dependent processing rates
|
van Ooijen, H.P.G. |
|
2003 |
85 |
1 |
p. 61-68 8 p. |
artikel |
14 |
The operating theatre planning by the follow-up of the risk of no realization
|
Marcon, Eric |
|
2003 |
85 |
1 |
p. 83-90 8 p. |
artikel |