nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Determining load patterns for the delivery of assembly components under JIT systems
|
Kim, Kap Hwan |
|
2002 |
77 |
1 |
p. 25-38 14 p. |
artikel |
2 |
Diary of Events
|
|
|
2002 |
77 |
1 |
p. 93-94 2 p. |
artikel |
3 |
Economic design of x̄-control charts with Weibull in-control times when there are multiple assignable causes
|
Chen, Yun-Shiow |
|
2002 |
77 |
1 |
p. 17-23 7 p. |
artikel |
4 |
Hierarchical simulation of complex production systems by coupling of models
|
Zülch, Gert |
|
2002 |
77 |
1 |
p. 39-51 13 p. |
artikel |
5 |
New heuristics to minimize total completion time in m-machine flowshops
|
Allahverdi, Ali |
|
2002 |
77 |
1 |
p. 71-83 13 p. |
artikel |
6 |
Note on: An optimal batch size for a production system operating under periodic delivery policy
|
Sarker, Ruhul A. |
|
2002 |
77 |
1 |
p. 89-90 2 p. |
artikel |
7 |
Note on: Economic production quantity model for items with imperfect quality–a practical approach
|
Goyal, Suresh Kumar |
|
2002 |
77 |
1 |
p. 85-87 3 p. |
artikel |
8 |
Note: Reply to R.A. Sarker
|
Goyal, S.K. |
|
2002 |
77 |
1 |
p. 91- 1 p. |
artikel |
9 |
On the relaxation of multi-level dynamic lot-sizing models
|
Vörös, József |
|
2002 |
77 |
1 |
p. 53-61 9 p. |
artikel |
10 |
Resource allocation in a few industries: Determinants and trends
|
Segelod, Esbjörn |
|
2002 |
77 |
1 |
p. 63-70 8 p. |
artikel |
11 |
Supply chain coordination with uncertain just-in-time delivery
|
Zimmer, Kirstin |
|
2002 |
77 |
1 |
p. 1-15 15 p. |
artikel |