Digital Library
Close Browse articles from a journal
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
                                       All articles of the corresponding issues
 
                             8 results found
no title author magazine year volume issue page(s) type
1 Diary of Events 2001
70 2 p. 199-200
2 p.
article
2 Equipment flexibility vs. inventory: A simulation study of manufacturing systems Garg, Suresh
2001
70 2 p. 125-143
19 p.
article
3 Forecasting practices of Canadian firms: Survey results and comparisons Klassen, Robert D.
2001
70 2 p. 163-174
12 p.
article
4 Makespan estimation in batch process industries using aggregate resource and job set characteristics H.M. Raaymakers, Wenny
2001
70 2 p. 145-161
17 p.
article
5 Minimizing makespan in a blocking flowshop using genetic algorithms Caraffa, Vince
2001
70 2 p. 101-115
15 p.
article
6 Minimizing WIP inventory in reliable production lines Papadopoulos, H.T.
2001
70 2 p. 185-197
13 p.
article
7 Scheduling in the two-machine flowshop with due date constraints Lin, Bertrand M.T.
2001
70 2 p. 117-123
7 p.
article
8 The maximal profit flow model in designing multiple-production-line system with obtainable resource capacity Chen, Miao-Sheng
2001
70 2 p. 175-184
10 p.
article
                             8 results found
 
 Koninklijke Bibliotheek - National Library of the Netherlands