nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A branch-and-bound algorithm for the hybrid flowshop
|
Moursli, O. |
|
2000 |
64 |
1-3 |
p. 113-125 13 p. |
artikel |
2 |
A concurrent engineering approach to chemical process design
|
Herder, Paulien M |
|
2000 |
64 |
1-3 |
p. 311-318 8 p. |
artikel |
3 |
A cooperative production planning method in the field of continuous process plants
|
Resteanu, Cornel |
|
2000 |
64 |
1-3 |
p. 65-78 14 p. |
artikel |
4 |
A new heuristic based on a hypergraph representation for the tool switching problem
|
Djellab, Housni |
|
2000 |
64 |
1-3 |
p. 165-176 12 p. |
artikel |
5 |
An exact method for cost-oriented assembly line balancing
|
Amen, Matthias |
|
2000 |
64 |
1-3 |
p. 187-195 9 p. |
artikel |
6 |
An information system for building production management
|
Ameziane, Farid |
|
2000 |
64 |
1-3 |
p. 345-358 14 p. |
artikel |
7 |
An integrated modelling approach for complex applications and distributed information systems
|
Gargouri, Faı̈ez |
|
2000 |
64 |
1-3 |
p. 331-344 14 p. |
artikel |
8 |
An LP-based approach for loading and routing in a flexible assembly line
|
Sawik, Tadeusz |
|
2000 |
64 |
1-3 |
p. 49-58 10 p. |
artikel |
9 |
A robust optimization model for stochastic logistic problems
|
Yu, Chian-Son |
|
2000 |
64 |
1-3 |
p. 385-397 13 p. |
artikel |
10 |
A two-phase heuristic approach to the permutation flow-shop scheduling problem
|
Suliman, S.M.A. |
|
2000 |
64 |
1-3 |
p. 143-152 10 p. |
artikel |
11 |
Cell formation using evolutionary algorithms with certain constraints
|
Plaquin, Marie-France |
|
2000 |
64 |
1-3 |
p. 267-278 12 p. |
artikel |
12 |
Cell formation with alternative process plans and machine capacity constraints: A new combined approach
|
Caux, C. |
|
2000 |
64 |
1-3 |
p. 279-284 6 p. |
artikel |
13 |
Co-operative production planning for small- and medium-sized enterprises
|
Mezgár, István |
|
2000 |
64 |
1-3 |
p. 37-48 12 p. |
artikel |
14 |
Customer order lead times for production based on lead time and tardiness costs
|
Bertrand, J.W.M. |
|
2000 |
64 |
1-3 |
p. 257-265 9 p. |
artikel |
15 |
Developing manufacturing management strategies: Influence of technology and other issues
|
Banerjee, S.K |
|
2000 |
64 |
1-3 |
p. 79-90 12 p. |
artikel |
16 |
Economic production quantity model for items with imperfect quality
|
Salameh, M.K. |
|
2000 |
64 |
1-3 |
p. 59-64 6 p. |
artikel |
17 |
Editorial
|
|
|
2000 |
64 |
1-3 |
p. xi-xiii nvt p. |
artikel |
18 |
Experiences with a concurrent engineering self-assessment tool
|
Landeghem, Rik Van |
|
2000 |
64 |
1-3 |
p. 295-309 15 p. |
artikel |
19 |
Flow simulation and genetic algorithm as optimization tools
|
Fontanili, F. |
|
2000 |
64 |
1-3 |
p. 91-100 10 p. |
artikel |
20 |
Future production systems: Influence of self-organization on approaches to quality engineering
|
Massotte, Pierre |
|
2000 |
64 |
1-3 |
p. 359-377 19 p. |
artikel |
21 |
Generalized inspection strategy for randomly failing systems subjected to random shocks
|
Chelbi, Anis |
|
2000 |
64 |
1-3 |
p. 379-384 6 p. |
artikel |
22 |
Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness
|
Botta-Genoulaz, Valérie |
|
2000 |
64 |
1-3 |
p. 101-111 11 p. |
artikel |
23 |
Index
|
|
|
2000 |
64 |
1-3 |
p. 419-421 3 p. |
artikel |
24 |
Indicators for measuring performances of morphology and material handling systems in flexible manufacturing systems
|
Devise, Olivier |
|
2000 |
64 |
1-3 |
p. 209-218 10 p. |
artikel |
25 |
Integrated scheduling, assembly area- and part-assignment for large-scale, make-to-order assemblies
|
Kolisch, R. |
|
2000 |
64 |
1-3 |
p. 127-141 15 p. |
artikel |
26 |
Lot-sizing problem with setup times in labor-based capacity production systems
|
Aghezzaf, El-Houssaine |
|
2000 |
64 |
1-3 |
p. 1-9 9 p. |
artikel |
27 |
Maximizing benefits in short-term planning in bottle-glass industry
|
Richard, Pascal |
|
2000 |
64 |
1-3 |
p. 11-19 9 p. |
artikel |
28 |
Measuring the performance of lot-sizing techniques in uncertain environments
|
Jeunet, Jully |
|
2000 |
64 |
1-3 |
p. 197-208 12 p. |
artikel |
29 |
Modeling and simulation of the control framework on a flexible manufacturing system
|
Gertosio, C |
|
2000 |
64 |
1-3 |
p. 285-293 9 p. |
artikel |
30 |
Optimal start times under stochastic activity durations
|
Elmaghraby, S.E. |
|
2000 |
64 |
1-3 |
p. 153-164 12 p. |
artikel |
31 |
Performance evaluation and design of a CONWIP system with inspections
|
Duri, Christelle |
|
2000 |
64 |
1-3 |
p. 219-229 11 p. |
artikel |
32 |
Quantitative models for performance measurement system
|
Suwignjo, P |
|
2000 |
64 |
1-3 |
p. 231-241 11 p. |
artikel |
33 |
Spatial decomposition for a multi-facility production and distribution problem
|
Dhaenens-Flipo, Clarisse |
|
2000 |
64 |
1-3 |
p. 177-186 10 p. |
artikel |
34 |
The feeder rack assignment problem in PCB assembly: A case study
|
Klomp, Cornelis |
|
2000 |
64 |
1-3 |
p. 399-407 9 p. |
artikel |
35 |
The overlapping production planning: A new approach of bounded capacity management
|
Bahroun, Z |
|
2000 |
64 |
1-3 |
p. 21-36 16 p. |
artikel |
36 |
The selection of information systems for production management: An evolving problem
|
Beach, R. |
|
2000 |
64 |
1-3 |
p. 319-329 11 p. |
artikel |
37 |
The two level master production schedule and planning bills in a just in time MRP context
|
Lamouri, Samir |
|
2000 |
64 |
1-3 |
p. 409-415 7 p. |
artikel |
38 |
Work-force management in automated assembly systems
|
Croci, F |
|
2000 |
64 |
1-3 |
p. 243-255 13 p. |
artikel |