nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A branch and bound algorithm to minimize the total flow time for m-machine permutation flowshop problems
|
Chung, Chia-Shin |
|
2002 |
56-57 |
3 |
p. 185-196 12 p. |
artikel |
2 |
A case study on the multistage IC final testing scheduling problem with reentry
|
Pearn, W.L. |
|
2004 |
56-57 |
3 |
p. 257-267 11 p. |
artikel |
3 |
Achieving integration through managing concurrent engineering
|
Pawar, Kulwant S. |
|
1994 |
56-57 |
3 |
p. 329-345 17 p. |
artikel |
4 |
A comment on Standish et al.: The problem with CALS: Barriers to the development of product data exchange and the US continuous acquisition and life-cycle support programme
|
Spinardi, Graham |
|
1996 |
56-57 |
3 |
p. 201-206 6 p. |
artikel |
5 |
A comparative study of linear and nonlinear models for aggregate retail sales forecasting
|
Chu, Ching-Wu |
|
2003 |
56-57 |
3 |
p. 217-231 15 p. |
artikel |
6 |
A comparison of allocation policies in a two-echelon repairable-item inventory model
|
Büyükkurt, M.Demirbaǧ |
|
1993 |
56-57 |
3 |
p. 291-302 12 p. |
artikel |
7 |
A comparison of different methods for estimating the average inventory level in a (Q,R) system with backorders
|
Lau, Amy Hing-Ling |
|
2002 |
56-57 |
3 |
p. 303-316 14 p. |
artikel |
8 |
A comparison of managers’ perceptions of short-termism in Sweden and the U.S.
|
Segelod, Esbjörn |
|
2000 |
56-57 |
3 |
p. 243-254 12 p. |
artikel |
9 |
A comparison of manufacturing management in JIT and non-JIT firms
|
Ebrahimpour, Maling |
|
1993 |
56-57 |
3 |
p. 355-364 10 p. |
artikel |
10 |
A comprehensive bibliography on justification of advanced manufacturing systems
|
Raafat, Feraidoon |
|
2002 |
56-57 |
3 |
p. 197-208 12 p. |
artikel |
11 |
Activity-based costing for production learning
|
Andrade, M.C. |
|
1999 |
56-57 |
3 |
p. 175-180 6 p. |
artikel |
12 |
Activity-based cost tables to support wire harness design
|
Ong, N.S. |
|
1993 |
56-57 |
3 |
p. 271-289 19 p. |
artikel |
13 |
Adapting the newsvendor model for infinite-horizon inventory systems
|
Geunes, Joseph P. |
|
2001 |
56-57 |
3 |
p. 237-250 14 p. |
artikel |
14 |
A decision analysis model for comparing well completion techniques
|
Stewart, Brian R. |
|
1997 |
56-57 |
3 |
p. 189-204 16 p. |
artikel |
15 |
A decision network algorithm for multi-stage dynamic lot sizing problems
|
Gencer, Cevriye |
|
1999 |
56-57 |
3 |
p. 281-285 5 p. |
artikel |
16 |
A deterministic inventory model for deteriorating items with stock-dependent demand rate
|
Pal, S. |
|
1993 |
56-57 |
3 |
p. 291-299 9 p. |
artikel |
17 |
Advanced manufacturing technology selection:A strategic model for learning and evaluation
|
Mohanty, R.P |
|
1998 |
56-57 |
3 |
p. 295-307 13 p. |
artikel |
18 |
A dynamic approach to operations management: An alternative to static optimization
|
Jaikumar, Ramachandran |
|
1992 |
56-57 |
3 |
p. 265-282 18 p. |
artikel |
19 |
A dynamic efficiency model using data envelopment analysis
|
Sengupta, Jati K. |
|
1999 |
56-57 |
3 |
p. 209-218 10 p. |
artikel |
20 |
A framework for comparing outsourcing strategies in multi-layered supply chains
|
Abdel-Malek, Layek |
|
2005 |
56-57 |
3 |
p. 318-328 11 p. |
artikel |
21 |
A framework for maintenance and replacement of a network structured system
|
Scarf, Philip A |
|
2001 |
56-57 |
3 |
p. 287-296 10 p. |
artikel |
22 |
A framework for maintenance concept development
|
Waeyenbergh, Geert |
|
2002 |
56-57 |
3 |
p. 299-313 15 p. |
artikel |
23 |
A framework for supply chain performance measurement
|
Gunasekaran, A |
|
2004 |
56-57 |
3 |
p. 333-347 15 p. |
artikel |
24 |
A fuzzy decomposition method for multistation production systems subject to blocking
|
Tan, Bariş |
|
1996 |
56-57 |
3 |
p. 245-262 18 p. |
artikel |
25 |
A GDSS based approach for the assessment of customer needs in industrial markets
|
Elfvengren, Kalle |
|
2004 |
56-57 |
3 |
p. 275-292 18 p. |
artikel |
26 |
A generalised cost-estimation model for job shops
|
Aderoba, Adeyemi |
|
1997 |
56-57 |
3 |
p. 257-263 7 p. |
artikel |
27 |
A general model for extended strategic supply chain management with emphasis on product life cycles including development and recycling
|
Fandel, G. |
|
2004 |
56-57 |
3 |
p. 293-308 16 p. |
artikel |
28 |
A genetic algorithm-based planning system for PCB component placement
|
Khoo, L.P. |
|
1998 |
56-57 |
3 |
p. 321-332 12 p. |
artikel |
29 |
A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs
|
Dellaert, N. |
|
2000 |
56-57 |
3 |
p. 241-257 17 p. |
artikel |
30 |
Agile manufacturing systems in the automotive industry
|
Elkins, Debra A. |
|
2004 |
56-57 |
3 |
p. 201-214 14 p. |
artikel |
31 |
A heuristic for bi-objective vehicle routing with time window constraints
|
Hong, Sung-Chul |
|
1999 |
56-57 |
3 |
p. 249-258 10 p. |
artikel |
32 |
A heuristic for replenishment of deteriorating items with a linear trend in demand
|
Kim, Dae H. |
|
1995 |
56-57 |
3 |
p. 265-270 6 p. |
artikel |
33 |
A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations
|
McMullen, Patrick R. |
|
1997 |
56-57 |
3 |
p. 177-190 14 p. |
artikel |
34 |
A heuristic to minimize makespan of cell scheduling problem
|
Solimanpur, M. |
|
2004 |
56-57 |
3 |
p. 231-241 11 p. |
artikel |
35 |
AHP approach in the credit evaluation of the manufacturing firms in Turkey
|
Yurdakul, Mustafa |
|
2004 |
56-57 |
3 |
p. 269-289 21 p. |
artikel |
36 |
Aligning ERP implementation with competitive priorities of manufacturing firms: An exploratory study
|
Yen, HsiuJu Rebecca |
|
2004 |
56-57 |
3 |
p. 207-220 14 p. |
artikel |
37 |
Allocating work to a two-stage production system with interstage buffer
|
Lau, Hon-Shiang |
|
1994 |
56-57 |
3 |
p. 281-289 9 p. |
artikel |
38 |
A local search algorithm for the optimization of the stochastic economic lot scheduling problem
|
Wagner, Michael |
|
2004 |
56-57 |
3 |
p. 391-402 12 p. |
artikel |
39 |
A management design approach to a simple flexible assembly system
|
Nakase, Nobuaki |
|
2002 |
56-57 |
3 |
p. 281-292 12 p. |
artikel |
40 |
A mathematical programming approach to evaluating alternative machine clusters in cellular manufacturing
|
Berardi, Victor L. |
|
1999 |
56-57 |
3 |
p. 253-264 12 p. |
artikel |
41 |
A methodology for selection problems with multiple, conflicting objectives and both qualitative and quantitative criteria
|
Erol, Ismail |
|
2003 |
56-57 |
3 |
p. 187-199 13 p. |
artikel |
42 |
A microeconomic analysis of investment in just-in-time manufacturing
|
Jewkes, E. |
|
1993 |
56-57 |
3 |
p. 313-321 9 p. |
artikel |
43 |
A mixed integer programming model for a two line CONWIP-based production and assembly system
|
Cao, Dong |
|
2005 |
56-57 |
3 |
p. 317-326 10 p. |
artikel |
44 |
A multi-agent approach for the capacity allocation problem
|
Brandolese, Armando |
|
2000 |
56-57 |
3 |
p. 269-285 17 p. |
artikel |
45 |
A multi-grid size dynamic programming approach for the production control of a random-speed machine
|
So, Wai Ping |
|
2000 |
56-57 |
3 |
p. 267-275 9 p. |
artikel |
46 |
A multi-objective model for purchasing of bulk raw materials of a large-scale integrated steel plant
|
Gao, Zhen |
|
2003 |
56-57 |
3 |
p. 325-334 10 p. |
artikel |
47 |
A multiple arc network model of production planning in a steel mill
|
Sasidhar, B. |
|
1991 |
56-57 |
3 |
p. 195-202 8 p. |
artikel |
48 |
An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system
|
Das, Sidhartha R. |
|
2005 |
56-57 |
3 |
p. 247-262 16 p. |
artikel |
49 |
An algorithm to determine the EOQ for deteriorating items with shortage and a linear trend in demand
|
Chung, Kun-Jen |
|
1997 |
56-57 |
3 |
p. 215-221 7 p. |
artikel |
50 |
Analysing divergent logistic networks with local (R, S) inventory control
|
van der Heijden, M.C. |
|
1992 |
56-57 |
3 |
p. 187-219 33 p. |
artikel |
51 |
Analysing interaction effects on MRP implementation using ACE
|
Sum, Chee-Chuong |
|
1999 |
56-57 |
3 |
p. 303-318 16 p. |
artikel |
52 |
Analysis of cellular and functional manufacturing systems in the presence of machine breakdown
|
Logendran, Rasaratnam |
|
1997 |
56-57 |
3 |
p. 239-256 18 p. |
artikel |
53 |
Analysis of correlated risky cash flow
|
Hui, Y.V. |
|
1993 |
56-57 |
3 |
p. 269-276 8 p. |
artikel |
54 |
Analysis of order review/release problems in production systems
|
Sabuncuoglu, I. |
|
1999 |
56-57 |
3 |
p. 259-279 21 p. |
artikel |
55 |
An analysis of the diffusion of flexible manufacturing systems
|
Handfield, Robert B. |
|
1995 |
56-57 |
3 |
p. 243-253 11 p. |
artikel |
56 |
An analysis of the multi-product newsboy problem with a budget constraint
|
Abdel-Malek, Layek L. |
|
2005 |
56-57 |
3 |
p. 296-307 12 p. |
artikel |
57 |
An approach to the design of a manufacturing cell under economic considerations
|
Cabrera-Rios, Mauricio |
|
2002 |
56-57 |
3 |
p. 223-237 15 p. |
artikel |
58 |
An approximate method for calculating the mean sojourn time of K-station production lines with no intermediate buffers
|
Papadopoulos, H.T. |
|
1998 |
56-57 |
3 |
p. 297-305 9 p. |
artikel |
59 |
An assessment of supply chain and innovation management practices in the manufacturing industries in Turkey
|
Ulusoy, Gündüz |
|
2003 |
56-57 |
3 |
p. 251-270 20 p. |
artikel |
60 |
An efficient dynamic dispatching rule for scheduling in a job shop
|
Raghu, T.S. |
|
1993 |
56-57 |
3 |
p. 301-313 13 p. |
artikel |
61 |
An empirical study of ISO certification in the maquiladora industry
|
Dowlatshahi, Shad |
|
2004 |
56-57 |
3 |
p. 291-306 16 p. |
artikel |
62 |
An empirical study of supply chain performance in transport logistics
|
Lai, Kee-Hung |
|
2004 |
56-57 |
3 |
p. 321-331 11 p. |
artikel |
63 |
An EOQ model for deteriorating items with a linear trend in demand and shortages in all cycles
|
Chakrabarti, T. |
|
1997 |
56-57 |
3 |
p. 205-213 9 p. |
artikel |
64 |
An EOQ model with deteriorating items under inflation when supplier credits linked to order quantity
|
Chang, Chun-Tao |
|
2004 |
56-57 |
3 |
p. 307-316 10 p. |
artikel |
65 |
A new pragmatic approach to capital investment appraisal: The financial appraisal profile (FAP) model
|
Lefley, Frank |
|
1998 |
56-57 |
3 |
p. 321-341 21 p. |
artikel |
66 |
An experimental evaluation of heuristics for scheduling in a real-life flowshop with sequence-dependent setup times of jobs
|
Parthasarathy, Srinivasaraghavan |
|
1997 |
56-57 |
3 |
p. 255-263 9 p. |
artikel |
67 |
An extended EMQ model for a failure prone machine with general lifetime distribution
|
Kim, Chang Hyun |
|
1997 |
56-57 |
3 |
p. 215-223 9 p. |
artikel |
68 |
An extended newsboy problem with shortage-level constraints
|
Chen, M.S. |
|
2000 |
56-57 |
3 |
p. 269-277 9 p. |
artikel |
69 |
An extended production/recycling model with stationary demand and return rates
|
Dobos, Imre |
|
2004 |
56-57 |
3 |
p. 311-323 13 p. |
artikel |
70 |
An extension of Rahim and Banerjee's model for a process with upper and lower specification limits
|
Al-Sultan, K.S. |
|
1997 |
56-57 |
3 |
p. 265-280 16 p. |
artikel |
71 |
An heuristic approach for finite time maintenance policy
|
Jayabalan, V. |
|
1992 |
56-57 |
3 |
p. 251-256 6 p. |
artikel |
72 |
An integrated approach to enhance the optical performance of couplers based on neural networks, desirability functions and tabu search
|
Hsu, Chih-Ming |
|
2004 |
56-57 |
3 |
p. 241-254 14 p. |
artikel |
73 |
An integrated dynamic performance measurement system for improving manufacturing competitiveness
|
Ghalayini, Alaa M. |
|
1997 |
56-57 |
3 |
p. 207-225 19 p. |
artikel |
74 |
An integrated inventory model for a single vendor and multiple buyers with ordering cost reduction
|
Woo, York Y. |
|
2001 |
56-57 |
3 |
p. 203-215 13 p. |
artikel |
75 |
An integrated Lagrangean relaxation-simulated annealing approach to the multi-level multi-item capacitated lot sizing problem
|
Özdamar, Linet |
|
2000 |
56-57 |
3 |
p. 319-331 13 p. |
artikel |
76 |
An integrated location, production, distribution and investment model for a multinational corporation
|
Bhutta, Khurrum S |
|
2003 |
56-57 |
3 |
p. 201-216 16 p. |
artikel |
77 |
An integrated model for part-operation allocation and investments in CNC technology
|
Bokhorst, Jos A.C |
|
2002 |
56-57 |
3 |
p. 267-285 19 p. |
artikel |
78 |
An integrated multi-depot hub-location vehicle routing model for network planning of parcel service
|
Wasner, Michael |
|
2004 |
56-57 |
3 |
p. 403-419 17 p. |
artikel |
79 |
An integrated operations–marketing model for innovative products and services
|
Ray, Saibal |
|
2005 |
56-57 |
3 |
p. 327-345 19 p. |
artikel |
80 |
An inter-organizational information system for supply chain management
|
Humphreys, P.K |
|
2001 |
56-57 |
3 |
p. 245-255 11 p. |
artikel |
81 |
An inventory control model using fuzzy logic
|
Samanta, B. |
|
2001 |
56-57 |
3 |
p. 217-226 10 p. |
artikel |
82 |
An inventory model for items with demands satisfied from stock or by special deliveries
|
Hollier, R.H. |
|
1996 |
56-57 |
3 |
p. 229-236 8 p. |
artikel |
83 |
An inventory model with deteriorating items, quantity discount, pricing and time-dependent partial backlogging
|
Papachristos, S. |
|
2003 |
56-57 |
3 |
p. 247-256 10 p. |
artikel |
84 |
An investigation of a simple logistic model
|
Mehrez, A. |
|
1993 |
56-57 |
3 |
p. 259-269 11 p. |
artikel |
85 |
Announcement
|
|
|
1995 |
56-57 |
3 |
p. 303- 1 p. |
artikel |
86 |
An optimal investment and inventory policy
|
van de Water, H. |
|
1991 |
56-57 |
3 |
p. 211-216 6 p. |
artikel |
87 |
An optimal policy for a single-vendor single-buyer integrated production–inventory system with capacity constraint of the transport equipment
|
Hoque, M.A. |
|
2000 |
56-57 |
3 |
p. 305-315 11 p. |
artikel |
88 |
An optimization model for refinery production scheduling
|
Göthe-Lundgren, Maud |
|
2002 |
56-57 |
3 |
p. 255-270 16 p. |
artikel |
89 |
An optimization-oriented method for simulation-based job shop scheduling incorporating capacity adjustment function
|
Arakawa, Masahiro |
|
2003 |
56-57 |
3 |
p. 359-369 11 p. |
artikel |
90 |
An order-level lot size inventory model with inventory-level dependent demand and deterioration
|
Sarker, Bhaba R. |
|
1997 |
56-57 |
3 |
p. 227-236 10 p. |
artikel |
91 |
A note on ‘An efficient algorithm for the single-machine tardiness problem’
|
Biskup, Dirk |
|
2000 |
56-57 |
3 |
p. 287-292 6 p. |
artikel |
92 |
A note on “An exact method for cost-oriented assembly line balancing”
|
Scholl, Armin |
|
2005 |
56-57 |
3 |
p. 343-352 10 p. |
artikel |
93 |
A note on JIT purchasing vs. EOQ with a price discount: An expansion of inventory costs
|
Schniederjans, Marc J |
|
2000 |
56-57 |
3 |
p. 289-294 6 p. |
artikel |
94 |
A numerical comparison of three potential learning and forgetting models
|
Jaber, Mohamad Y. |
|
2004 |
56-57 |
3 |
p. 281-294 14 p. |
artikel |
95 |
A periodic-review model with serially-correlated, inventory-level-dependent demand
|
Urban, Timothy L. |
|
2005 |
56-57 |
3 |
p. 287-295 9 p. |
artikel |
96 |
Application of discrete event simulation to the activity based costing of manufacturing systems
|
Spedding, T.A. |
|
1999 |
56-57 |
3 |
p. 289-301 13 p. |
artikel |
97 |
Applications of O.R. techniques in cost allocation of major operational materials in an alloy and special steel manufacturing unit
|
Sasidhar, B. |
|
1991 |
56-57 |
3 |
p. 189-193 5 p. |
artikel |
98 |
Applying possibilistic linear programming to aggregate production planning
|
Wang, Reay-Chen |
|
2005 |
56-57 |
3 |
p. 328-341 14 p. |
artikel |
99 |
Applying the lessons learned from 27 lean manufacturers.
|
Panizzolo, Roberto |
|
1998 |
56-57 |
3 |
p. 223-240 18 p. |
artikel |
100 |
A pragmatic view on process capability studies
|
Deleryd, Mats |
|
1999 |
56-57 |
3 |
p. 319-330 12 p. |
artikel |
101 |
1992, April 26–29 TIMS/ORSA joint national meeting: “A view from above”, Orlando, Florida, USA
|
|
|
1991 |
56-57 |
3 |
p. 264- 1 p. |
artikel |
102 |
A review of the stochastic lot scheduling problem 1 This paper is based upon work supported in part by the National Science Foundation under Grant Number DMI-9409344. 1
|
Sox, Charles R. |
|
1999 |
56-57 |
3 |
p. 181-200 20 p. |
artikel |
103 |
A robustness study of a multi-echelon inventory model via simulation
|
Tee, Yeu-San |
|
2002 |
56-57 |
3 |
p. 265-277 13 p. |
artikel |
104 |
A simple case of preventive maintenance decision-making with limited historical data
|
Silver, Edward A. |
|
1992 |
56-57 |
3 |
p. 241-250 10 p. |
artikel |
105 |
Assessing success factors for implementing CE a case study in Hong Kong electronics industry by AHP
|
Tummala, V.M.Rao |
|
1997 |
56-57 |
3 |
p. 265-283 19 p. |
artikel |
106 |
A stock rationing policy in a (s,S)-controlled stochastic production system with 2-phase Coxian processing times and lost sales
|
Lee, Jeong Eun |
|
2003 |
56-57 |
3 |
p. 299-307 9 p. |
artikel |
107 |
A strategic planning model for oilfield service and supply companies
|
Bowker, Robert M. |
|
1992 |
56-57 |
3 |
p. 221-231 11 p. |
artikel |
108 |
A structural equation model of supply chain quality management and organizational performance
|
Lin, Chinho |
|
2005 |
56-57 |
3 |
p. 355-365 11 p. |
artikel |
109 |
A study of quantity discount pricing models with different ordering structures: Order coordination, order consolidation, and multi-tier ordering hierarchy
|
Gurnani, Haresh |
|
2001 |
56-57 |
3 |
p. 203-225 23 p. |
artikel |
110 |
A study on the effect of the extent and location of protective capacity in flow systems
|
Kadipasaoglu, Sukran N |
|
2000 |
56-57 |
3 |
p. 217-228 12 p. |
artikel |
111 |
A survey of the adoption and use of target costing in Dutch firms
|
Dekker, Henri |
|
2003 |
56-57 |
3 |
p. 293-305 13 p. |
artikel |
112 |
A systematic procedure for the selection of bulk material handling equipment
|
Velury, Jayadev |
|
1992 |
56-57 |
3 |
p. 233-240 8 p. |
artikel |
113 |
A techno-economic analysis of the results of product diversification in household appliance durables—evaluating concreteness
|
Barbiroli, Giancarlo |
|
2003 |
56-57 |
3 |
p. 257-278 22 p. |
artikel |
114 |
A two-echelon inventory model with lost sales
|
Andersson, Jonas |
|
2001 |
56-57 |
3 |
p. 307-315 9 p. |
artikel |
115 |
A two-item newsboy problem with substitutability
|
Khouja, Moutaz |
|
1996 |
56-57 |
3 |
p. 267-275 9 p. |
artikel |
116 |
A two-stage model for the design of supply chain networks
|
Cakravastia, Andi |
|
2002 |
56-57 |
3 |
p. 231-248 18 p. |
artikel |
117 |
1992, August 31–September 2 4th international workshop on generalized convexity, Pécs, Hungary
|
|
|
1991 |
56-57 |
3 |
p. 264- 1 p. |
artikel |
118 |
1992, August 17–19 8th international conference on CAD/CAM, robotics and factories of the future, Metz, France
|
|
|
1991 |
56-57 |
3 |
p. 264- 1 p. |
artikel |
119 |
1992, August 24–28 7th international symposium on inventories, Budapest, Hungary
|
|
|
1991 |
56-57 |
3 |
p. 264- 1 p. |
artikel |
120 |
Author index
|
|
|
2002 |
56-57 |
3 |
p. 325-326 2 p. |
artikel |
121 |
Author index
|
|
|
2001 |
56-57 |
3 |
p. 303-304 2 p. |
artikel |
122 |
Author index
|
|
|
1992 |
56-57 |
3 |
p. 301- 1 p. |
artikel |
123 |
Author index
|
|
|
1991 |
56-57 |
3 |
p. 265- 1 p. |
artikel |
124 |
Author index to this Volume
|
|
|
2003 |
56-57 |
3 |
p. 337-338 2 p. |
artikel |
125 |
Author index to this Volume
|
|
|
2003 |
56-57 |
3 |
p. 405-407 3 p. |
artikel |
126 |
Author index to this Volume
|
|
|
2003 |
56-57 |
3 |
p. 337-338 2 p. |
artikel |
127 |
Author index to this Volume
|
|
|
2003 |
56-57 |
3 |
p. 273-274 2 p. |
artikel |
128 |
Author index to this Volume
|
|
|
2002 |
56-57 |
3 |
p. 319-320 2 p. |
artikel |
129 |
Author index to this Volume
|
|
|
2002 |
56-57 |
3 |
p. 347-348 2 p. |
artikel |
130 |
Author index to this Volume
|
|
|
2002 |
56-57 |
3 |
p. 315-316 2 p. |
artikel |
131 |
Author index to this Volume
|
|
|
2002 |
56-57 |
3 |
p. 297-298 2 p. |
artikel |
132 |
Author index to this Volume
|
|
|
2002 |
56-57 |
3 |
p. 317-318 2 p. |
artikel |
133 |
Author index to this Volume
|
|
|
2004 |
56-57 |
3 |
p. 295-296 2 p. |
artikel |
134 |
Author index to this Volume
|
|
|
2005 |
56-57 |
3 |
p. 413-415 3 p. |
artikel |
135 |
Author index to this Volume
|
|
|
2005 |
56-57 |
3 |
p. 427-429 3 p. |
artikel |
136 |
Author index to this Volume
|
|
|
2004 |
56-57 |
3 |
p. 319-320 2 p. |
artikel |
137 |
Author index to this Volume
|
|
|
2004 |
56-57 |
3 |
p. 409-411 3 p. |
artikel |
138 |
Author index to this Volume
|
|
|
2004 |
56-57 |
3 |
p. 437-439 3 p. |
artikel |
139 |
Author index to this Volume
|
|
|
2004 |
56-57 |
3 |
p. 301-302 2 p. |
artikel |
140 |
Author index to this Volume
|
|
|
2004 |
56-57 |
3 |
p. 351-353 3 p. |
artikel |
141 |
Author Index to this Volume
|
|
|
2005 |
56-57 |
3 |
p. 344-346 3 p. |
artikel |
142 |
Author Index to this Volume
|
|
|
2005 |
56-57 |
3 |
p. 355-357 3 p. |
artikel |
143 |
Author index to volume 29
|
|
|
1993 |
56-57 |
3 |
p. 327-328 2 p. |
artikel |
144 |
Author index to volume 36
|
|
|
1994 |
56-57 |
3 |
p. 333-334 2 p. |
artikel |
145 |
Author index to volume 39
|
|
|
1995 |
56-57 |
3 |
p. 305-306 2 p. |
artikel |
146 |
Author Index to Volume 70
|
|
|
2001 |
56-57 |
3 |
p. 299-300 2 p. |
artikel |
147 |
Author index to volume 53
|
|
|
1997 |
56-57 |
3 |
p. 333-334 2 p. |
artikel |
148 |
Author index to volume 51
|
|
|
1997 |
56-57 |
3 |
p. 265-266 2 p. |
artikel |
149 |
Author index to volume 48
|
|
|
1997 |
56-57 |
3 |
p. 271-272 2 p. |
artikel |
150 |
Author index to volume 42
|
|
|
1996 |
56-57 |
3 |
p. 293-294 2 p. |
artikel |
151 |
Author index to volume 44
|
|
|
1996 |
56-57 |
3 |
p. 279-280 2 p. |
artikel |
152 |
Author index to volume 49
|
|
|
1997 |
56-57 |
3 |
p. 287-288 2 p. |
artikel |
153 |
Author index to volume 52
|
|
|
1997 |
56-57 |
3 |
p. 327-328 2 p. |
artikel |
154 |
Author Index to Volume 69
|
|
|
2001 |
56-57 |
3 |
p. 349-350 2 p. |
artikel |
155 |
Author Index to Volume 73
|
|
|
2001 |
56-57 |
3 |
p. 295-296 2 p. |
artikel |
156 |
Author index to volume 27
|
|
|
1992 |
56-57 |
3 |
p. 295-296 2 p. |
artikel |
157 |
Author index to volume 28
|
|
|
1992 |
56-57 |
3 |
p. 357-358 2 p. |
artikel |
158 |
Author index to volume 32
|
|
|
1993 |
56-57 |
3 |
p. 387-388 2 p. |
artikel |
159 |
Automation and organizational performance: The case of electronics manufacturing firms in Singapore
|
Wong, Poh-Kam |
|
1997 |
56-57 |
3 |
p. 257-268 12 p. |
artikel |
160 |
Bridging the gap between probabilistic and fuzzy-parameter EOQ models
|
Hojati, Mehran |
|
2004 |
56-57 |
3 |
p. 215-221 7 p. |
artikel |
161 |
Call for Papers: Organizational Structure, Culture and Operations Management
|
|
|
2005 |
56-57 |
3 |
p. III-IV nvt p. |
artikel |
162 |
Call for Papers: Sustainable Supply Chain Management
|
|
|
2005 |
56-57 |
3 |
p. I-II nvt p. |
artikel |
163 |
Capacity allocation and outsourcing in a process industry
|
de Kok, Ton G. |
|
2000 |
56-57 |
3 |
p. 229-239 11 p. |
artikel |
164 |
Capacity utilisation and profitability: A decomposition of short-run profit efficiency
|
Coelli, Tim |
|
2002 |
56-57 |
3 |
p. 261-278 18 p. |
artikel |
165 |
Capital budgeting under uncertainty: An extended goal programming approach
|
Kalu, Timothy Ch.U. |
|
1999 |
56-57 |
3 |
p. 235-251 17 p. |
artikel |
166 |
Cellular Green-Teams in global network organisations
|
Wright, D.T. |
|
1997 |
56-57 |
3 |
p. 291-303 13 p. |
artikel |
167 |
Cement transportation planning via fuzzy linear programming
|
Shih, Li-Hsing |
|
1999 |
56-57 |
3 |
p. 277-287 11 p. |
artikel |
168 |
CIM and the process of innovation: Integrating the organization of production
|
Rowlinson, Michael |
|
1994 |
56-57 |
3 |
p. 359-369 11 p. |
artikel |
169 |
Combining lean and agile characteristics: Creation of virtual groups by enhanced production flow analysis
|
Prince, J |
|
2003 |
56-57 |
3 |
p. 305-318 14 p. |
artikel |
170 |
Combining the analytic hierarchy process and goal programming for global facility location-allocation problem
|
Badri, Masood A |
|
1999 |
56-57 |
3 |
p. 237-248 12 p. |
artikel |
171 |
Common due date assignment for scheduling on a single machine with jointly reducible processing times
|
Biskup, Dirk |
|
2001 |
56-57 |
3 |
p. 317-322 6 p. |
artikel |
172 |
Comparing scheduling rules for flexible flow lines
|
Kurz, Mary E. |
|
2003 |
56-57 |
3 |
p. 371-388 18 p. |
artikel |
173 |
Comparison of depreciation and corporate tax policies between the countries of the North American free trade area (NAFTA) and the European Community (EC)
|
Remer, Donald S. |
|
1993 |
56-57 |
3 |
p. 335-354 20 p. |
artikel |
174 |
Complementarities between JIT purchasing practices: An economic analysis based on transaction costs
|
González-Benito, Javier |
|
2000 |
56-57 |
3 |
p. 279-293 15 p. |
artikel |
175 |
Computer-aided economic optimization of end-milling operations
|
Wang, J. |
|
1998 |
56-57 |
3 |
p. 307-320 14 p. |
artikel |
176 |
Computer-integrated manufacturing, supervisory management, and human intervention in the production process
|
Clark, Jon |
|
1994 |
56-57 |
3 |
p. 305-312 8 p. |
artikel |
177 |
Configuring products to address the customization-responsiveness squeeze: A survey of management issues and opportunities
|
Salvador, F. |
|
2004 |
56-57 |
3 |
p. 273-291 19 p. |
artikel |
178 |
Constraint-based schedule repair for product development projects with time-limited constraints
|
Wang, Juite |
|
2005 |
56-57 |
3 |
p. 399-414 16 p. |
artikel |
179 |
Contents
|
|
|
2003 |
56-57 |
3 |
p. iv- 1 p. |
artikel |
180 |
Contents
|
|
|
2002 |
56-57 |
3 |
p. iv- 1 p. |
artikel |
181 |
Contents
|
|
|
2002 |
56-57 |
3 |
p. vi- 1 p. |
artikel |
182 |
Contents
|
|
|
2004 |
56-57 |
3 |
p. iv- 1 p. |
artikel |
183 |
Contents
|
|
|
2004 |
56-57 |
3 |
p. iv- 1 p. |
artikel |
184 |
Contents
|
|
|
2004 |
56-57 |
3 |
p. iv- 1 p. |
artikel |
185 |
Contents
|
|
|
2005 |
56-57 |
3 |
p. iv- 1 p. |
artikel |
186 |
Contents of this Volume
|
|
|
2003 |
56-57 |
3 |
p. 409-411 3 p. |
artikel |
187 |
Contents of this Volume
|
|
|
2003 |
56-57 |
3 |
p. 339-340 2 p. |
artikel |
188 |
Contents of this Volume
|
|
|
2003 |
56-57 |
3 |
p. 339-340 2 p. |
artikel |
189 |
Contents of this Volume
|
|
|
2003 |
56-57 |
3 |
p. 275-276 2 p. |
artikel |
190 |
Contents of this Volume
|
|
|
2002 |
56-57 |
3 |
p. 327-328 2 p. |
artikel |
191 |
Contents of this Volume
|
|
|
2002 |
56-57 |
3 |
p. 299-300 2 p. |
artikel |
192 |
Contents of this Volume
|
|
|
2002 |
56-57 |
3 |
p. 317-318 2 p. |
artikel |
193 |
Contents of this Volume
|
|
|
2002 |
56-57 |
3 |
p. 349-350 2 p. |
artikel |
194 |
Contents of this Volume
|
|
|
2002 |
56-57 |
3 |
p. 321-322 2 p. |
artikel |
195 |
Contents of this Volume
|
|
|
2002 |
56-57 |
3 |
p. 319-320 2 p. |
artikel |
196 |
Contents of this Volume
|
|
|
2001 |
56-57 |
3 |
p. 305-306 2 p. |
artikel |
197 |
Contents of this Volume
|
|
|
2004 |
56-57 |
3 |
p. 355-356 2 p. |
artikel |
198 |
Contents of this Volume
|
|
|
2004 |
56-57 |
3 |
p. 303-304 2 p. |
artikel |
199 |
Contents of this Volume
|
|
|
2004 |
56-57 |
3 |
p. 297-298 2 p. |
artikel |
200 |
Contents of this Volume
|
|
|
2004 |
56-57 |
3 |
p. 321-322 2 p. |
artikel |
201 |
Contents of this Volume
|
|
|
2004 |
56-57 |
3 |
p. 413-415 3 p. |
artikel |
202 |
Contents of this Volume
|
|
|
2004 |
56-57 |
3 |
p. 441-443 3 p. |
artikel |
203 |
Contents of this Volume
|
|
|
2005 |
56-57 |
3 |
p. 358-359 2 p. |
artikel |
204 |
Contents of this Volume
|
|
|
2005 |
56-57 |
3 |
p. 431-433 3 p. |
artikel |
205 |
Contents of this Volume
|
|
|
2005 |
56-57 |
3 |
p. 417-419 3 p. |
artikel |
206 |
Contents of this Volume
|
|
|
2005 |
56-57 |
3 |
p. 347-348 2 p. |
artikel |
207 |
Contents volume 24
|
|
|
1992 |
56-57 |
3 |
p. 303-304 2 p. |
artikel |
208 |
Contents volume 39
|
|
|
1995 |
56-57 |
3 |
p. 307-308 2 p. |
artikel |
209 |
Contents Volume 69
|
|
|
2001 |
56-57 |
3 |
p. 351-352 2 p. |
artikel |
210 |
Contents Volume 70
|
|
|
2001 |
56-57 |
3 |
p. 301-302 2 p. |
artikel |
211 |
Contents volume 53
|
|
|
1997 |
56-57 |
3 |
p. 335-336 2 p. |
artikel |
212 |
Contents volume 51
|
|
|
1997 |
56-57 |
3 |
p. 267-268 2 p. |
artikel |
213 |
Contents Volume 52
|
|
|
1997 |
56-57 |
3 |
p. 329-330 2 p. |
artikel |
214 |
Contents volume 42
|
|
|
1996 |
56-57 |
3 |
p. 295-296 2 p. |
artikel |
215 |
Contents volume 44
|
|
|
1996 |
56-57 |
3 |
p. 281-282 2 p. |
artikel |
216 |
Contents volume 48
|
|
|
1997 |
56-57 |
3 |
p. 273-274 2 p. |
artikel |
217 |
Contents volume 49
|
|
|
1997 |
56-57 |
3 |
p. 289-290 2 p. |
artikel |
218 |
Contents Volume 73
|
|
|
2001 |
56-57 |
3 |
p. 297-298 2 p. |
artikel |
219 |
Contents volume 32
|
|
|
1993 |
56-57 |
3 |
p. 389-390 2 p. |
artikel |
220 |
Contents volume 36
|
|
|
1994 |
56-57 |
3 |
p. 335-336 2 p. |
artikel |
221 |
Contents volume 27
|
|
|
1992 |
56-57 |
3 |
p. 297-298 2 p. |
artikel |
222 |
Contents volume 29
|
|
|
1993 |
56-57 |
3 |
p. 329-330 2 p. |
artikel |
223 |
Contents volume 28
|
|
|
1992 |
56-57 |
3 |
p. 359-360 2 p. |
artikel |
224 |
Continuous review inventory models where random lead time depends on lot size and reserved capacity
|
Çakanyildirim, Metin |
|
2000 |
56-57 |
3 |
p. 217-228 12 p. |
artikel |
225 |
Coordinated replenishments with alternative supply sources in two-level supply chains
|
Ng, C.T. |
|
2001 |
56-57 |
3 |
p. 227-240 14 p. |
artikel |
226 |
Coordination of internal supply chains in vertically integrated high-tech manufacturing organizations (HTMOs)
|
Ugarte, Armando |
|
2000 |
56-57 |
3 |
p. 235-252 18 p. |
artikel |
227 |
Cost and benefit of Internet-based support of business processes
|
Manecke, Nicola |
|
2004 |
56-57 |
3 |
p. 213-229 17 p. |
artikel |
228 |
Customer-oriented improvement and evaluation of supply chain processes supported by simulation models
|
Reiner, Gerald |
|
2005 |
56-57 |
3 |
p. 381-395 15 p. |
artikel |
229 |
Cyclic and constant-proportion input-control strategies for dedicated flexible manufacturing system operations
|
Co, Henry |
|
1995 |
56-57 |
3 |
p. 193-200 8 p. |
artikel |
230 |
Cyclic deadlock prediction and avoidance for zone-controlled AGV system
|
Lochana Moorthy, Rajeeva |
|
2003 |
56-57 |
3 |
p. 309-324 16 p. |
artikel |
231 |
Data transmission code towards international EDI for seafood supply chain
|
Kobayashi, Iwao |
|
2004 |
56-57 |
3 |
p. 281-293 13 p. |
artikel |
232 |
1991, December 27–29 First international conference on manufacturing technology, Hong Kong, Hong Kong
|
|
|
1991 |
56-57 |
3 |
p. 263- 1 p. |
artikel |
233 |
1991, December 16–19 The world congress on expert systems, Orlando, Florida, USA
|
|
|
1991 |
56-57 |
3 |
p. 263- 1 p. |
artikel |
234 |
Deconstructing car assembler productivity
|
Williams, Karel |
|
1994 |
56-57 |
3 |
p. 253-265 13 p. |
artikel |
235 |
Defining the concept of supply chain quality management and its relevance to academic and industrial practice
|
Robinson, Carol J. |
|
2005 |
56-57 |
3 |
p. 315-337 23 p. |
artikel |
236 |
Delivery and trade-offs
|
Szwejczewski, Marek |
|
1997 |
56-57 |
3 |
p. 323-330 8 p. |
artikel |
237 |
Delivery capability and firm performance in international operations
|
Fawcett, Stanley E. |
|
1997 |
56-57 |
3 |
p. 191-204 14 p. |
artikel |
238 |
Demand forecasting for a jewelry packaging company: pattern identification and assessment
|
Chen, Shaw K. |
|
1991 |
56-57 |
3 |
p. 203-209 7 p. |
artikel |
239 |
Deregulation and restructuring of the global electricity supply industry and its impact upon power plant suppliers
|
McGovern, T. |
|
2004 |
56-57 |
3 |
p. 321-337 17 p. |
artikel |
240 |
Design and implementation of a maintenance planning and control system
|
Ulusoy, Gündüz |
|
1992 |
56-57 |
3 |
p. 263-272 10 p. |
artikel |
241 |
Designing a reverse logistics operation for short cycle time repair services
|
Amini, M. Mehdi |
|
2005 |
56-57 |
3 |
p. 367-380 14 p. |
artikel |
242 |
Design of maintenance concepts
|
Gits, C.W. |
|
1992 |
56-57 |
3 |
p. 217-226 10 p. |
artikel |
243 |
Deskilling and reskilling within the labour process: The case of computer integrated manufacturing
|
Agnew, Andrew |
|
1997 |
56-57 |
3 |
p. 317-324 8 p. |
artikel |
244 |
Determination of an order-up-to policy in the stochastic economic lot scheduling model
|
Smits, Sanne R |
|
2004 |
56-57 |
3 |
p. 377-389 13 p. |
artikel |
245 |
Determining optimum Genetic Algorithm parameters for scheduling the manufacturing and assembly of complex products
|
Pongcharoen, P. |
|
2002 |
56-57 |
3 |
p. 311-322 12 p. |
artikel |
246 |
Determining the optimal number of sublots in a single-product, deterministic flow shop with overlapping operations
|
Van Nieuwenhuyse, Inneke |
|
2004 |
56-57 |
3 |
p. 221-239 19 p. |
artikel |
247 |
Determining the optimal target for a process with multiple markets and variable holding costs
|
Shao, Yuehjen E |
|
2000 |
56-57 |
3 |
p. 229-242 14 p. |
artikel |
248 |
Developing a new world class model for small and medium sized make-to-order companies
|
Muda, Shaladdin |
|
2002 |
56-57 |
3 |
p. 295-310 16 p. |
artikel |
249 |
Development of a dynamic data interchange scheme to support product design in agile manufacturing
|
Lee, Carman K.M |
|
2004 |
56-57 |
3 |
p. 295-308 14 p. |
artikel |
250 |
Development of a knowledge-based manufacturing modelling system based on IDEFO for the metal-cutting industry
|
Ang, C.L. |
|
1994 |
56-57 |
3 |
p. 267-281 15 p. |
artikel |
251 |
Development of a practical goal programming system for solving semi-large size multi-criterion planning problems
|
Sun, Guoqiang |
|
1995 |
56-57 |
3 |
p. 227-242 16 p. |
artikel |
252 |
Diary of Events
|
|
|
2003 |
56-57 |
3 |
p. 335-336 2 p. |
artikel |
253 |
Diary of Events
|
|
|
2003 |
56-57 |
3 |
p. 403- 1 p. |
artikel |
254 |
Diary of Events
|
|
|
2003 |
56-57 |
3 |
p. 271-272 2 p. |
artikel |
255 |
Diary of Events
|
|
|
2003 |
56-57 |
3 |
p. 335- 1 p. |
artikel |
256 |
Diary of Events
|
|
|
2002 |
56-57 |
3 |
p. 315-316 2 p. |
artikel |
257 |
Diary of Events
|
|
|
2002 |
56-57 |
3 |
p. 323-324 2 p. |
artikel |
258 |
Diary of events
|
|
|
1995 |
56-57 |
3 |
p. 299-302 4 p. |
artikel |
259 |
Diary of Events
|
|
|
2002 |
56-57 |
3 |
p. 345- 1 p. |
artikel |
260 |
Diary of Events
|
|
|
2002 |
56-57 |
3 |
p. 317-318 2 p. |
artikel |
261 |
Diary of Events
|
|
|
2002 |
56-57 |
3 |
p. 295- 1 p. |
artikel |
262 |
Diary of Events
|
|
|
2002 |
56-57 |
3 |
p. 313-314 2 p. |
artikel |
263 |
Diary of Events
|
|
|
2001 |
56-57 |
3 |
p. 293-294 2 p. |
artikel |
264 |
Diary of events
|
|
|
1997 |
56-57 |
3 |
p. 285-286 2 p. |
artikel |
265 |
Diary of events
|
|
|
1996 |
56-57 |
3 |
p. 277-278 2 p. |
artikel |
266 |
Diary of events
|
|
|
1996 |
56-57 |
3 |
p. 289-292 4 p. |
artikel |
267 |
Diary of events
|
|
|
1997 |
56-57 |
3 |
p. 269-270 2 p. |
artikel |
268 |
Diary of events
|
|
|
1997 |
56-57 |
3 |
p. 331-332 2 p. |
artikel |
269 |
Diary of events
|
|
|
1997 |
56-57 |
3 |
p. 325-326 2 p. |
artikel |
270 |
Diary of events
|
|
|
1997 |
56-57 |
3 |
p. 264- 1 p. |
artikel |
271 |
Diary of Events
|
|
|
2001 |
56-57 |
3 |
p. 347-348 2 p. |
artikel |
272 |
Diary of Events
|
|
|
2001 |
56-57 |
3 |
p. 295-297 3 p. |
artikel |
273 |
Diary of events
|
|
|
1993 |
56-57 |
3 |
p. 323-325 3 p. |
artikel |
274 |
Diary of events
|
|
|
1994 |
56-57 |
3 |
p. 329-332 4 p. |
artikel |
275 |
Diary of events
|
|
|
1992 |
56-57 |
3 |
p. 355-356 2 p. |
artikel |
276 |
Diary of Events
|
|
|
2005 |
56-57 |
3 |
p. 411-412 2 p. |
artikel |
277 |
Diary of Events
|
|
|
2004 |
56-57 |
3 |
p. 317-318 2 p. |
artikel |
278 |
Diary of Events
|
|
|
2004 |
56-57 |
3 |
p. 349-350 2 p. |
artikel |
279 |
Diary of Events
|
|
|
2004 |
56-57 |
3 |
p. 299-300 2 p. |
artikel |
280 |
Diary of Events
|
|
|
2004 |
56-57 |
3 |
p. 435-436 2 p. |
artikel |
281 |
Diary of Events
|
|
|
2004 |
56-57 |
3 |
p. 293-294 2 p. |
artikel |
282 |
Diary of Events
|
|
|
2004 |
56-57 |
3 |
p. 407-408 2 p. |
artikel |
283 |
Diary of Events
|
|
|
2005 |
56-57 |
3 |
p. 353-354 2 p. |
artikel |
284 |
Diary of Events
|
|
|
2005 |
56-57 |
3 |
p. 342-343 2 p. |
artikel |
285 |
Diary of Events
|
|
|
2005 |
56-57 |
3 |
p. 425-426 2 p. |
artikel |
286 |
Diary of events
|
|
|
1994 |
56-57 |
3 |
p. 385-387 3 p. |
artikel |
287 |
Diary of events
|
|
|
1993 |
56-57 |
3 |
p. 383-386 4 p. |
artikel |
288 |
Diary of events
|
|
|
1992 |
56-57 |
3 |
p. 293-294 2 p. |
artikel |
289 |
Direct database-simulation of a job-shop
|
Koh, Kwang-Hang |
|
1995 |
56-57 |
3 |
p. 281-287 7 p. |
artikel |
290 |
Discounted costs, obsolescence and planned stockouts with the EOQ formula
|
van Delft, Ch. |
|
1996 |
56-57 |
3 |
p. 255-265 11 p. |
artikel |
291 |
Dynamic knowledge-related learning processes in internationalizing high-tech SMEs
|
Saarenketo, Sami |
|
2004 |
56-57 |
3 |
p. 363-378 16 p. |
artikel |
292 |
Economic analysis of dynamic inventory models with non-stationary costs and demand
|
Hariga, Moncer A. |
|
1994 |
56-57 |
3 |
p. 255-266 12 p. |
artikel |
293 |
Economics of pipeline maintenance and replacement
|
Sheikh, Anwar Khalil |
|
1992 |
56-57 |
3 |
p. 273-284 12 p. |
artikel |
294 |
Economy of scope, added value chain and cost dynamics: A tentative optimization model
|
Durand, Thomas |
|
1993 |
56-57 |
3 |
p. 237-247 11 p. |
artikel |
295 |
Editorial
|
Agnew, A. |
|
1997 |
56-57 |
3 |
p. 255- 1 p. |
artikel |
296 |
Editorial Board
|
|
|
2005 |
56-57 |
3 |
p. CO2- 1 p. |
artikel |
297 |
Editorial Board
|
|
|
2005 |
56-57 |
3 |
p. CO2- 1 p. |
artikel |
298 |
Editorial statement by Robert W. Grubbström
|
|
|
1992 |
56-57 |
3 |
p. i- 1 p. |
artikel |
299 |
Editorial statement by Uday S. Karmarkar
|
|
|
1992 |
56-57 |
3 |
p. iii- 1 p. |
artikel |
300 |
Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems
|
Sleptchenko, A. |
|
2002 |
56-57 |
3 |
p. 209-230 22 p. |
artikel |
301 |
Effects of rejects on in-process inventories in serial production lines
|
Sculli, D. |
|
1995 |
56-57 |
3 |
p. 271-279 9 p. |
artikel |
302 |
Efficacy of end-user neural network and data mining software for predicting complex system performance
|
Schikora, Paul F. |
|
2003 |
56-57 |
3 |
p. 231-253 23 p. |
artikel |
303 |
Efficiency of size sorting of fish
|
Booman, A.C. |
|
1997 |
56-57 |
3 |
p. 259-265 7 p. |
artikel |
304 |
Efficient heuristic and optimal approaches for n/2/F/σC i scheduling problems
|
Wang, Chengen |
|
1996 |
56-57 |
3 |
p. 225-237 13 p. |
artikel |
305 |
Engineering and economic laws of production
|
Wibe, Sören |
|
2004 |
56-57 |
3 |
p. 203-206 4 p. |
artikel |
306 |
Engineering changes and time delays: A field investigation
|
Hegde, G.G. |
|
1992 |
56-57 |
3 |
p. 341-352 12 p. |
artikel |
307 |
Enterprise information systems project implementation:
|
Yusuf, Yahaya |
|
2004 |
56-57 |
3 |
p. 251-266 16 p. |
artikel |
308 |
Erfolgsstrategien für Zulieferer (successful strategies of suppliers)
|
Gelei, Andrea |
|
1992 |
56-57 |
3 |
p. 292- 1 p. |
artikel |
309 |
ERP implementation failures in China: Case studies with implications for ERP vendors
|
Xue, Yajiong |
|
2005 |
56-57 |
3 |
p. 279-295 17 p. |
artikel |
310 |
Erratum
|
Segerstedt, Anders |
|
1997 |
56-57 |
3 |
p. 267- 1 p. |
artikel |
311 |
Erratum to 'A comparison of different methods for estimating the average inventory level in a (Q,R) system with backorders [Int. J. Production Economics 77. no. 2. pp. 173-185]
|
|
|
2002 |
56-57 |
3 |
p. 301- 1 p. |
artikel |
312 |
Erratum to “Supply chain coordination by revenue sharing contract”
|
Giannoccaro, Ilaria |
|
2004 |
56-57 |
3 |
p. 297- 1 p. |
artikel |
313 |
Estimating the cost of steel pipe bending, a comparison between neural networks and regression analysis
|
Shtub, Avraham |
|
1999 |
56-57 |
3 |
p. 201-207 7 p. |
artikel |
314 |
Estimation of the installed cost of heat exchanger networks
|
Suaysompol, K. |
|
1993 |
56-57 |
3 |
p. 303-312 10 p. |
artikel |
315 |
Evaluating design implementation strategies using enterprise simulation
|
Barton, J.A |
|
2001 |
56-57 |
3 |
p. 285-299 15 p. |
artikel |
316 |
Evaluating orders allocation within networks of firms
|
Hammami, A. |
|
2003 |
56-57 |
3 |
p. 233-249 17 p. |
artikel |
317 |
Evaluating shop floor input control using rapid modeling
|
Enns, S.T |
|
2000 |
56-57 |
3 |
p. 229-241 13 p. |
artikel |
318 |
Evaluation methods of standard software with respect to their effectiveness
|
Martin, H.H. |
|
1992 |
56-57 |
3 |
p. 249-261 13 p. |
artikel |
319 |
Evidence of manufacturing strategies in Indian industry: a survey
|
Dangayach, G.S |
|
2003 |
56-57 |
3 |
p. 279-298 20 p. |
artikel |
320 |
Evolution of a decision support system for human resource planning in a petroleum company
|
Mohanty, R.P. |
|
1997 |
56-57 |
3 |
p. 251-261 11 p. |
artikel |
321 |
Expectation-variance analyss of job sequences under processing time uncertainty
|
De, Prabuddha |
|
1992 |
56-57 |
3 |
p. 289-297 9 p. |
artikel |
322 |
Expert systems and production/operations management
|
Cheng, T.C.E. |
|
1991 |
56-57 |
3 |
p. 249-257 9 p. |
artikel |
323 |
Explaining beer demand: A residual modeling regression approach using statistical process control
|
Koksalan, Murat |
|
1999 |
56-57 |
3 |
p. 265-276 12 p. |
artikel |
324 |
Extending the concept of supply chain:
|
Al-Mudimigh, Abdullah S. |
|
2004 |
56-57 |
3 |
p. 309-320 12 p. |
artikel |
325 |
Factors underlying operational JIT purchasing practices: Results of an empirical research
|
Nassimbeni, Guido |
|
1996 |
56-57 |
3 |
p. 275-288 14 p. |
artikel |
326 |
1992, February 17–21 Seventh international working seminar on production economics, Igls/Inssbruck, Austria
|
|
|
1991 |
56-57 |
3 |
p. 263- 1 p. |
artikel |
327 |
1992, February 27–28 Seventh workshop on strategic human resource management: “Issues and challenges for international strategic HRM”, Strasbourg, France
|
|
|
1991 |
56-57 |
3 |
p. 263- 1 p. |
artikel |
328 |
Flexibility of manufacturing systems, strategic change and performance
|
Lloréns, F. Javier |
|
2005 |
56-57 |
3 |
p. 273-289 17 p. |
artikel |
329 |
Focussing on managerial boundaries as the design criteria for integrated systems
|
Nicholson, T.A.J. |
|
1994 |
56-57 |
3 |
p. 315-328 14 p. |
artikel |
330 |
Fundamental modes of operation for mass customization
|
MacCarthy, Bart |
|
2003 |
56-57 |
3 |
p. 289-304 16 p. |
artikel |
331 |
Fuzzy production planning model for fresh tomato packing
|
Miller, W.A. |
|
1997 |
56-57 |
3 |
p. 227-238 12 p. |
artikel |
332 |
Gaining the benefits of integrated manufacturing technology — just who benefits and how?
|
Thomas, Pete |
|
1994 |
56-57 |
3 |
p. 371-381 11 p. |
artikel |
333 |
Genetic algorithm optimisation of a class of inventory control systems
|
Disney, S.M. |
|
2000 |
56-57 |
3 |
p. 259-278 20 p. |
artikel |
334 |
Grouping of parts and machines in presence of alternative process routes by genetic algorithm
|
Uddin, Muhammad Kutub |
|
2002 |
56-57 |
3 |
p. 219-228 10 p. |
artikel |
335 |
Heuristic algorithms for scheduling in the no-wait flowshop
|
Gangadharan, Rajesh |
|
1993 |
56-57 |
3 |
p. 285-290 6 p. |
artikel |
336 |
Heuristic methods for cost-oriented assembly line balancing: A comparison on solution quality and computing time
|
Amen, Matthias |
|
2001 |
56-57 |
3 |
p. 255-264 10 p. |
artikel |
337 |
Heuristic PAC model for hybrid MTO and MTS production environment
|
Chang, Sheng-Hung |
|
2003 |
56-57 |
3 |
p. 347-358 12 p. |
artikel |
338 |
Heuristics for replenishment with linear decreasing demand
|
Zhao, G.Q. |
|
2001 |
56-57 |
3 |
p. 339-345 7 p. |
artikel |
339 |
Higher supply chain security with lower cost: Lessons from total quality management
|
Lee, Hau L. |
|
2005 |
56-57 |
3 |
p. 289-300 12 p. |
artikel |
340 |
High performance heuristic algorithm for controlling stochastic network projects
|
Golenko-Ginzburg, Dimitri |
|
1998 |
56-57 |
3 |
p. 235-245 11 p. |
artikel |
341 |
How to release orders in order to minimise system inventory and system nervousness?
|
van Donselaar, K.H. |
|
2002 |
56-57 |
3 |
p. 335-343 9 p. |
artikel |
342 |
IFC (Editorial Board)
|
|
|
2003 |
56-57 |
3 |
p. IFC- 1 p. |
artikel |
343 |
IFC (Editorial Board)
|
|
|
2003 |
56-57 |
3 |
p. IFC- 1 p. |
artikel |
344 |
IFC (Editorial Board)
|
|
|
2003 |
56-57 |
3 |
p. IFC- 1 p. |
artikel |
345 |
IFC (Editorial Board)
|
|
|
2003 |
56-57 |
3 |
p. IFC- 1 p. |
artikel |
346 |
IFC (Editorial Board)
|
|
|
2002 |
56-57 |
3 |
p. IFC- 1 p. |
artikel |
347 |
IFC (Editorial Board)
|
|
|
2002 |
56-57 |
3 |
p. IFC- 1 p. |
artikel |
348 |
IFC (Editorial Board)
|
|
|
2005 |
56-57 |
3 |
p. IFC- 1 p. |
artikel |
349 |
IFC (Editorial Board)
|
|
|
2005 |
56-57 |
3 |
p. CO2- 1 p. |
artikel |
350 |
IFC (Editorial Board)
|
|
|
2004 |
56-57 |
3 |
p. IFC- 1 p. |
artikel |
351 |
IFC (Editorial Board)
|
|
|
2004 |
56-57 |
3 |
p. IFC- 1 p. |
artikel |
352 |
IFC (Editorial Board)
|
|
|
2004 |
56-57 |
3 |
p. IFC- 1 p. |
artikel |
353 |
IFC (Editorial Board)
|
|
|
2004 |
56-57 |
3 |
p. IFC- 1 p. |
artikel |
354 |
IFC (Editorial Board)
|
|
|
2004 |
56-57 |
3 |
p. IFC- 1 p. |
artikel |
355 |
IFC (Editorial Board)
|
|
|
2004 |
56-57 |
3 |
p. IFC- 1 p. |
artikel |
356 |
Igls 2000
|
Grubbström, Robert W. |
|
2002 |
56-57 |
3 |
p. 189-190 2 p. |
artikel |
357 |
Impact of electronic data interchange technology on quality improvement and inventory reduction programs: A field study
|
Kekre, Sunder |
|
1992 |
56-57 |
3 |
p. 265-282 18 p. |
artikel |
358 |
Impact of external factors on organizational performance
|
Kolay, M.K. |
|
1992 |
56-57 |
3 |
p. 321-339 19 p. |
artikel |
359 |
Implementation of e-procurement and e-fulfillment processes: A comparison of cases in the motorcycle industry
|
Muffatto, Moreno |
|
2004 |
56-57 |
3 |
p. 339-351 13 p. |
artikel |
360 |
Improved lot sizing heuristics for multi-stage inventory models with backlogging
|
Vörös, József |
|
1992 |
56-57 |
3 |
p. 283-288 6 p. |
artikel |
361 |
Improving the performance of job shop manufacturing with demand-pull production control by reducing set-up/processing time variability
|
Li, Jing-Wen |
|
2003 |
56-57 |
3 |
p. 255-270 16 p. |
artikel |
362 |
Incentives for overhead cost reduction: Setup time and lot size considerations
|
Hegde, G.G. |
|
1992 |
56-57 |
3 |
p. 255-263 9 p. |
artikel |
363 |
Incorporating transport cost in the lot size and pricing decisions with downward sloping demand
|
Abad, P.L. |
|
2005 |
56-57 |
3 |
p. 297-305 9 p. |
artikel |
364 |
Index
|
|
|
1999 |
56-57 |
3 |
p. 333-334 2 p. |
artikel |
365 |
Index
|
|
|
2000 |
56-57 |
3 |
p. 295-296 2 p. |
artikel |
366 |
Index
|
|
|
2000 |
56-57 |
3 |
p. 321-322 2 p. |
artikel |
367 |
Index
|
|
|
2000 |
56-57 |
3 |
p. 323-324 2 p. |
artikel |
368 |
Index
|
|
|
1998 |
56-57 |
3 |
p. 345-346 2 p. |
artikel |
369 |
Industrial service profiling: Matching service offerings and processes
|
Johansson, Pontus |
|
2004 |
56-57 |
3 |
p. 309-320 12 p. |
artikel |
370 |
In Memoriam: Professor Brian G. Kingsman 1939–2003
|
Mercer, Alan |
|
2003 |
56-57 |
3 |
p. 183-185 3 p. |
artikel |
371 |
Integrated batch size and setup reduction decisions in multi-product, dynamic manufacturing environments
|
Diaby, Moustapha |
|
2000 |
56-57 |
3 |
p. 219-233 15 p. |
artikel |
372 |
Integrated design and production of multi-storey timber frame houses – production effects caused by customer-oriented design
|
Stehn, Lars |
|
2002 |
56-57 |
3 |
p. 259-269 11 p. |
artikel |
373 |
Integrated vendor–buyer cooperative models with stochastic demand in controllable lead time
|
Ouyang, Liang-Yuh |
|
2004 |
56-57 |
3 |
p. 255-266 12 p. |
artikel |
374 |
Integrating resource and production decisions in a simple multi-stage assembly system
|
Dellaert, Nico |
|
2004 |
56-57 |
3 |
p. 281-294 14 p. |
artikel |
375 |
Integration of assembly and fabrication for make-to-order production
|
Kolisch, R. |
|
2000 |
56-57 |
3 |
p. 287-306 20 p. |
artikel |
376 |
Interdependencies between network and activity-analytical descriptions of production relationships in the implementation of large-scale projects – illustrated by textbook production
|
Fandel, Günter |
|
2001 |
56-57 |
3 |
p. 227-235 9 p. |
artikel |
377 |
Inventory control with a modified Croston procedure and Erlang distribution
|
Levén, Erik |
|
2004 |
56-57 |
3 |
p. 361-367 7 p. |
artikel |
378 |
Inventory inaccuracy and supply chain performance: a simulation study of a retail supply chain
|
Fleisch, Elgar |
|
2005 |
56-57 |
3 |
p. 373-385 13 p. |
artikel |
379 |
Inventory investment and asymmetric adjustment: Some evidence for the UK
|
Holly, Sean |
|
2001 |
56-57 |
3 |
p. 251-260 10 p. |
artikel |
380 |
Inventory investment, product cycles, and the imperfectly competitive firm
|
Jones, Philip C. |
|
1998 |
56-57 |
3 |
p. 267-276 10 p. |
artikel |
381 |
Inventory models for fast moving spare parts subject to “sudden death” obsolescence
|
Cobbaert, Koen |
|
1996 |
56-57 |
3 |
p. 239-248 10 p. |
artikel |
382 |
Inventory models with random yield in a random environment
|
Erdem, Asli Sencer |
|
2002 |
56-57 |
3 |
p. 239-253 15 p. |
artikel |
383 |
1992, January 29–30 ADPM'92: Automation of mixed continuous and sequential processes, Paris, France
|
|
|
1991 |
56-57 |
3 |
p. 263- 1 p. |
artikel |
384 |
Job sequencing using an expert
|
Mandelbaum, Marvin |
|
2003 |
56-57 |
3 |
p. 389-401 13 p. |
artikel |
385 |
Joint determination of process mean, production run size and material order quantity for a container-filling process
|
Roan, Jinshyang |
|
2000 |
56-57 |
3 |
p. 303-317 15 p. |
artikel |
386 |
1992, June 3–5 ICOTA'92: International conference on optimization: Techniques and applications, Singapore, Singapore
|
|
|
1991 |
56-57 |
3 |
p. 264- 1 p. |
artikel |
387 |
1992, June 29–July 1 EURO XII/TIMS XXXI joint international conference on operational research & management science, Helsinki, Finland
|
|
|
1991 |
56-57 |
3 |
p. 264- 1 p. |
artikel |
388 |
Just-in-time: A cross-sectional plant analysis
|
Callen, Jeffrey L. |
|
2000 |
56-57 |
3 |
p. 277-301 25 p. |
artikel |
389 |
Layout design for a paper reel warehouse: A two-stage heuristic approach
|
Lai, K.K |
|
2002 |
56-57 |
3 |
p. 231-243 13 p. |
artikel |
390 |
Lean production and the Internet
|
Bruun, Peter |
|
2004 |
56-57 |
3 |
p. 247-260 14 p. |
artikel |
391 |
Linking maintenance strategies to performance
|
Swanson, Laura |
|
2001 |
56-57 |
3 |
p. 237-244 8 p. |
artikel |
392 |
Linking strategy to production management structures and systems
|
Carrie, A.S. |
|
1994 |
56-57 |
3 |
p. 293-304 12 p. |
artikel |
393 |
List of referees 1992
|
|
|
1992 |
56-57 |
3 |
p. 353-354 2 p. |
artikel |
394 |
Lot-sizing rules and freezing the master production schedule in material requirements planning systems
|
Zhao, Xiande |
|
1997 |
56-57 |
3 |
p. 281-305 25 p. |
artikel |
395 |
Lot streaming in multistage production systems
|
Ramasesh, Ranga V. |
|
2000 |
56-57 |
3 |
p. 199-211 13 p. |
artikel |
396 |
Machine repairing models for production systems
|
Ki Ching, Wai |
|
2001 |
56-57 |
3 |
p. 257-266 10 p. |
artikel |
397 |
Maintenance concept development: A case study
|
Waeyenbergh, Geert |
|
2004 |
56-57 |
3 |
p. 395-405 11 p. |
artikel |
398 |
Make to stock or make to order: The decoupling point in the food processing industries
|
van Donk, Dirk Pieter |
|
2001 |
56-57 |
3 |
p. 297-306 10 p. |
artikel |
399 |
Make vs. buy decisions: A process incorporating multi-attribute decision-making
|
Platts, K.W. |
|
2002 |
56-57 |
3 |
p. 247-257 11 p. |
artikel |
400 |
Manufacturing blocking discipline: A multi-criterion approach for buffer allocations
|
Andijani, A.A. |
|
1997 |
56-57 |
3 |
p. 155-163 9 p. |
artikel |
401 |
Manufacturing planning and control decision model: A design methodology
|
Banerjee, S.K. |
|
1994 |
56-57 |
3 |
p. 283-292 10 p. |
artikel |
402 |
Manufacturing practices and performance: Comparisons between Australia and New Zealand
|
Samson, Danny |
|
2000 |
56-57 |
3 |
p. 243-255 13 p. |
artikel |
403 |
Manufacturing setup cost reduction under variable lead times and finite opportunities for investment
|
Sarker, Bhaba R. |
|
1997 |
56-57 |
3 |
p. 237-247 11 p. |
artikel |
404 |
Mathematical models for developing a flexible workforce
|
Stewart, B.D. |
|
1994 |
56-57 |
3 |
p. 243-254 12 p. |
artikel |
405 |
1992, May 18–19 International product development management conference on new approaches to development and engineering, Brussels, Belgium
|
|
|
1991 |
56-57 |
3 |
p. 264- 1 p. |
artikel |
406 |
Measuring quality from the consumer's perspective: A methodology and its application
|
Karnes, Carol L. |
|
1995 |
56-57 |
3 |
p. 215-225 11 p. |
artikel |
407 |
Minimizing a weighted quadratic function of job lateness in the single machine system
|
Sen, Tapan |
|
1996 |
56-57 |
3 |
p. 237-243 7 p. |
artikel |
408 |
Minimizing mean flow times criteria on a single batch processing machine with non-identical jobs sizes
|
Jolai Ghazvini, Fariborz |
|
1998 |
56-57 |
3 |
p. 273-280 8 p. |
artikel |
409 |
Minimizing the makespan of a group scheduling problem: a new heuristic
|
Logendran, Rasaratnam |
|
1991 |
56-57 |
3 |
p. 217-230 14 p. |
artikel |
410 |
Minimizing total flow time in a two-machine flowshop problem with minimum makespan
|
Gupta, Jatinder N.D |
|
2001 |
56-57 |
3 |
p. 323-338 16 p. |
artikel |
411 |
Minimizing total weighted completion time at a pre-assembly stage composed of two feeding machines
|
Chang Sup Sung, |
|
1998 |
56-57 |
3 |
p. 247-255 9 p. |
artikel |
412 |
Minimum cost safety stocks for frequent delivery manufacturing
|
Otávio Aleotti Maia, Luis |
|
1999 |
56-57 |
3 |
p. 233-236 4 p. |
artikel |
413 |
Minimum cost single and double screening procedures with dichotomous performance variable
|
Bai, Do Sun |
|
1995 |
56-57 |
3 |
p. 255-264 10 p. |
artikel |
414 |
Modeling in-house vs. contract maintenance, with fixed costs and learning effects
|
Kennedy, W.J. |
|
1993 |
56-57 |
3 |
p. 277-283 7 p. |
artikel |
415 |
Modeling manufacturing and marketing options in international operations
|
Hadjinicola, George C. |
|
2002 |
56-57 |
3 |
p. 287-304 18 p. |
artikel |
416 |
Modelling flow and jobbing shops as a queueing network for workload control
|
Haskose, A. |
|
2002 |
56-57 |
3 |
p. 271-285 15 p. |
artikel |
417 |
Modelling resource supply and demand: Expanding the utility of ABC
|
Salafatinos, Chris |
|
1996 |
56-57 |
3 |
p. 177-187 11 p. |
artikel |
418 |
Multi-attribute comparison of advanced manufacturing systems using fuzzy vs. crisp axiomatic design approach
|
Kulak, Osman |
|
2005 |
56-57 |
3 |
p. 415-424 10 p. |
artikel |
419 |
Multilocation plant sizing and timing problem: Analysis of spatial decomposition procedure
|
Kulkarni, R.V. |
|
1993 |
56-57 |
3 |
p. 249-257 9 p. |
artikel |
420 |
Multiproduct CVP analysis based on contribution rules
|
González, Luis |
|
2001 |
56-57 |
3 |
p. 273-284 12 p. |
artikel |
421 |
Networked enterprise: A new business model for global sourcing
|
Chung, Walter W.C. |
|
2004 |
56-57 |
3 |
p. 267-280 14 p. |
artikel |
422 |
New product warranty: A literature review
|
Murthy, D.N.P |
|
2002 |
56-57 |
3 |
p. 231-260 30 p. |
artikel |
423 |
Non-parametric production analysis in non-competitive environments
|
Cherchye, Laurens |
|
2002 |
56-57 |
3 |
p. 279-294 16 p. |
artikel |
424 |
Note on an economic lot scheduling problem under budgetary and capacity constraints
|
Giri, B.C. |
|
2004 |
56-57 |
3 |
p. 229-234 6 p. |
artikel |
425 |
[No title]
|
Chakrabarti, T. |
|
2001 |
56-57 |
3 |
p. 293- 1 p. |
artikel |
426 |
1991, November 12–14 International working conference on new approaches towards “One-of-a-kind” production, Bremen, Germany
|
|
|
1991 |
56-57 |
3 |
p. 263- 1 p. |
artikel |
427 |
1991, November 10–13 POM-91: The second annual meeting of the production and operations management society, New York, USA
|
|
|
1991 |
56-57 |
3 |
p. 263- 1 p. |
artikel |
428 |
1991, November 27–28 Workshop in strategic management issues in technology strategy, Brussels, Belgium
|
|
|
1991 |
56-57 |
3 |
p. 263- 1 p. |
artikel |
429 |
Observation on: “Modeling in-house vs. contract maintenance, with fixed costs and learning effects” [Int. J. Production Economics 32 (1993) 277–283]
|
Ferrell Jr, William G. |
|
2004 |
56-57 |
3 |
p. 295- 1 p. |
artikel |
430 |
1991, October 21–25 APICS 34th international conference and exhibition: The integrated management revolution — A global competitive challenge, Seattle, Washington, USA
|
|
|
1991 |
56-57 |
3 |
p. 263- 1 p. |
artikel |
431 |
1991, October 27–31 PICMET '91: Portland international conference on management of engineering and technology, Portland, Oregon, USA
|
|
|
1991 |
56-57 |
3 |
p. 263- 1 p. |
artikel |
432 |
On the applicability of activity based costing as a planning instrument
|
Schneeweiss, Ch. |
|
1998 |
56-57 |
3 |
p. 277-284 8 p. |
artikel |
433 |
On the best number of different standard lengths to stock for one-dimensional assortment problems
|
Holthaus, Oliver |
|
2003 |
56-57 |
3 |
p. 233-246 14 p. |
artikel |
434 |
“On-the-fly” line balancing with very little WIP
|
McClain, John O. |
|
1992 |
56-57 |
3 |
p. 283-289 7 p. |
artikel |
435 |
On the necessity of a disposal option for returned items that can be remanufactured
|
Teunter, Ruud H |
|
2002 |
56-57 |
3 |
p. 257-266 10 p. |
artikel |
436 |
On the present worth of multivariate quality loss
|
Chou, Chao-Yu |
|
2001 |
56-57 |
3 |
p. 279-288 10 p. |
artikel |
437 |
On the sensitivity of project variability to activity mean duration
|
Elmaghraby, S.E. |
|
1999 |
56-57 |
3 |
p. 219-232 14 p. |
artikel |
438 |
Operationalising strategy: Mapping manufacturing variables
|
Tan, Kim Hua |
|
2004 |
56-57 |
3 |
p. 379-393 15 p. |
artikel |
439 |
Optimal budget and cash flows during retrofitting periods in batch chemical process industries
|
Badell, M. |
|
2005 |
56-57 |
3 |
p. 359-372 14 p. |
artikel |
440 |
Optimal constant due-date determination and sequencing of n jobs on a single machine
|
Cheng, T.C.E. |
|
1991 |
56-57 |
3 |
p. 259-261 3 p. |
artikel |
441 |
Optimal continuous review policies for spare part provisioning with random lead times
|
Shibuya, Takeshi |
|
1998 |
56-57 |
3 |
p. 257-271 15 p. |
artikel |
442 |
Optimal inventory policy with noninstantaneous receipt under trade credit
|
Ouyang, Liang-Yuh |
|
2005 |
56-57 |
3 |
p. 290-300 11 p. |
artikel |
443 |
Optimal multiple delivery schedule for demand in logistic model
|
Chou, Shuo-Yan |
|
2001 |
56-57 |
3 |
p. 241-249 9 p. |
artikel |
444 |
Optimal policies in hybrid manufacturing/remanufacturing systems with product substitution
|
Inderfurth, Karl |
|
2004 |
56-57 |
3 |
p. 325-343 19 p. |
artikel |
445 |
Optimal spare allocation problem based on the interval estimate of availability
|
Yanagi, Shigeru |
|
1992 |
56-57 |
3 |
p. 285-290 6 p. |
artikel |
446 |
Optimal target values for a filling process when inspection is based on a correlated variable
|
Bai, Do Sun |
|
1993 |
56-57 |
3 |
p. 327-334 8 p. |
artikel |
447 |
Optimal two-stage lot sizing and inventory batching policies
|
Kim, DaeSoo |
|
1999 |
56-57 |
3 |
p. 221-234 14 p. |
artikel |
448 |
Optimization of the machining economics problem under the failure replacement strategy
|
Shabtay, Dvir |
|
2002 |
56-57 |
3 |
p. 213-230 18 p. |
artikel |
449 |
Optimizing assembly planning through a three-stage integrated approach
|
Chen, Ruey-Shun |
|
2004 |
56-57 |
3 |
p. 243-256 14 p. |
artikel |
450 |
Optimizing loading policies at a bottleneck facility in an assembly line with random rejects
|
Awate, Prakash G. |
|
2003 |
56-57 |
3 |
p. 319-334 16 p. |
artikel |
451 |
Optimum number of kanbans between two adjacent workstations in a JIT system
|
Wang, Hunglin |
|
1991 |
56-57 |
3 |
p. 179-188 10 p. |
artikel |
452 |
Options in advanced energy-related production processes
|
Lint, L.J.O. |
|
1992 |
56-57 |
3 |
p. 257-264 8 p. |
artikel |
453 |
Parallel machine scheduling to minimize total tardiness
|
Yalaoui, Farouk |
|
2002 |
56-57 |
3 |
p. 265-279 15 p. |
artikel |
454 |
Performance-based strategic resource allocation in supply networks
|
Ross, Anthony D |
|
2000 |
56-57 |
3 |
p. 255-266 12 p. |
artikel |
455 |
Performance improvement theory
|
Vits, Jeroen |
|
2002 |
56-57 |
3 |
p. 285-298 14 p. |
artikel |
456 |
Performance simulation of supply chain designs
|
Persson, Fredrik |
|
2002 |
56-57 |
3 |
p. 231-245 15 p. |
artikel |
457 |
Physical or virtual team collocation: Does it matter?
|
Pawar, Kulwant S. |
|
1997 |
56-57 |
3 |
p. 283-290 8 p. |
artikel |
458 |
Planning and managing manufacturing capacity when demand is subject to diffusion effects
|
Cantamessa, Marco |
|
2000 |
56-57 |
3 |
p. 227-240 14 p. |
artikel |
459 |
Planning and replanning the master production schedule under demand uncertainty
|
Tang, Ou |
|
2002 |
56-57 |
3 |
p. 323-334 12 p. |
artikel |
460 |
Planning of fuel coal imports using a mixed integer programming method
|
Shih, Li-Hsing |
|
1997 |
56-57 |
3 |
p. 243-249 7 p. |
artikel |
461 |
Positioning of automated guided vehicles in a loop layout to minimize the mean vehicle response time
|
Kim, Kap Hwan |
|
1995 |
56-57 |
3 |
p. 201-214 14 p. |
artikel |
462 |
Practical framework for strategic alliance in Pearl River Delta manufacturing supply chain: A total quality approach
|
Lo, Victor H.Y. |
|
2004 |
56-57 |
3 |
p. 231-240 10 p. |
artikel |
463 |
Predicting the output of a tube-bending process: A case study
|
Chen, Shaw K. |
|
2005 |
56-57 |
3 |
p. 307-316 10 p. |
artikel |
464 |
Predictive maintenance: The one-unit replacement model
|
Chu, Chengbin |
|
1998 |
56-57 |
3 |
p. 285-295 11 p. |
artikel |
465 |
Prioritizing engineering characteristics in quality function deployment with incomplete information: A linear partial ordering approach
|
Han, Chang Hee |
|
2004 |
56-57 |
3 |
p. 235-249 15 p. |
artikel |
466 |
Probabilistic multi-item inventory model with varying order cost under two restrictions: A geometric programming approach
|
Abuo-El-Ata, M.O. |
|
2003 |
56-57 |
3 |
p. 223-231 9 p. |
artikel |
467 |
Product costing for complex manufacturing systems
|
Boons, Arnick N.A.M. |
|
1998 |
56-57 |
3 |
p. 241-255 15 p. |
artikel |
468 |
Product due date assignment for complex assemblies
|
Song, D.P. |
|
2002 |
56-57 |
3 |
p. 243-256 14 p. |
artikel |
469 |
Production and preventive maintenance rates control for a manufacturing system: An experimental design approach
|
Gharbi, A. |
|
2000 |
56-57 |
3 |
p. 275-287 13 p. |
artikel |
470 |
Productivity, returns to scale and the elasticity of factor substitution in the USA apparel industry
|
Ramcharran, Harri |
|
2001 |
56-57 |
3 |
p. 285-291 7 p. |
artikel |
471 |
Project management system design: A social and organisational analysis
|
Metcalfe, Beverly |
|
1997 |
56-57 |
3 |
p. 305-316 12 p. |
artikel |
472 |
Quality management and high performance work practices: Do they coexist?
|
Bayo-Moriones, Alberto |
|
2001 |
56-57 |
3 |
p. 251-259 9 p. |
artikel |
473 |
Quality tools and techniques: Are they necessary for quality management?
|
Tarı́, Juan José |
|
2004 |
56-57 |
3 |
p. 267-280 14 p. |
artikel |
474 |
Quantifying the benefits of breaking bulk in retail operations
|
Ketzenberg, Michael |
|
2002 |
56-57 |
3 |
p. 249-263 15 p. |
artikel |
475 |
Queueing networks and the topological design of supply chain systems
|
Kerbache, Laoucine |
|
2004 |
56-57 |
3 |
p. 251-272 22 p. |
artikel |
476 |
Reengineering of materials management system: A case study
|
Mohanty, R.P |
|
2001 |
56-57 |
3 |
p. 267-278 12 p. |
artikel |
477 |
Relationship stability and supplier commitment to quality
|
Lai, Kee-hung |
|
2005 |
56-57 |
3 |
p. 397-410 14 p. |
artikel |
478 |
Revising models of maintenance and inspection
|
Christer, A.H. |
|
1992 |
56-57 |
3 |
p. 227-234 8 p. |
artikel |
479 |
Robust multi-item newsboy models with a budget constraint
|
Vairaktarakis, George L |
|
2000 |
56-57 |
3 |
p. 213-226 14 p. |
artikel |
480 |
Safeguarding supply chain relationships
|
Christy, David P. |
|
1994 |
56-57 |
3 |
p. 233-242 10 p. |
artikel |
481 |
Schedule based production
|
Yeh, Chung-Hsing |
|
1997 |
56-57 |
3 |
p. 235-242 8 p. |
artikel |
482 |
Scheduling a multi-stage fabrication shop for efficient subsequent assembly operations
|
Lagodimos, A.G |
|
2004 |
56-57 |
3 |
p. 345-359 15 p. |
artikel |
483 |
Scheduling families of jobs with setup times
|
Liaee, Mohammad Mehdi |
|
1997 |
56-57 |
3 |
p. 165-176 12 p. |
artikel |
484 |
Scheduling in an automated flow shop to minimize cost: Backward-meta scheduling method
|
Kawtummachai, Ruengsak |
|
1997 |
56-57 |
3 |
p. 225-235 11 p. |
artikel |
485 |
Scheduling jobs with values exponentially deteriorating over time
|
Voutsinas, Theodore G. |
|
2002 |
56-57 |
3 |
p. 163-169 7 p. |
artikel |
486 |
Scheduling to minimize the coefficient of variation
|
De, Prabuddha |
|
1996 |
56-57 |
3 |
p. 249-253 5 p. |
artikel |
487 |
Scheduling with two job classes and setup times to minimize the number of tardy jobs
|
Gupta, Jatinder N.D. |
|
1996 |
56-57 |
3 |
p. 205-216 12 p. |
artikel |
488 |
Science Direct
|
|
|
2002 |
56-57 |
3 |
p. i- 1 p. |
artikel |
489 |
Selection of an automated inspection system using multiattribute decision analysis
|
Pandey, P.C. |
|
1995 |
56-57 |
3 |
p. 289-298 10 p. |
artikel |
490 |
Selection of routes in a flexible manufacturing facility
|
Das, Sanchoy K. |
|
1997 |
56-57 |
3 |
p. 237-247 11 p. |
artikel |
491 |
Self-assessment using the business excellence model: A study of practice and process
|
Ritchie, L |
|
2000 |
56-57 |
3 |
p. 241-254 14 p. |
artikel |
492 |
Sensitivity analysis of rent replacement models
|
Kobbacy, K.A.H. |
|
1994 |
56-57 |
3 |
p. 267-279 13 p. |
artikel |
493 |
1992, September 21–26 World congress on intelligent manufacturing technology & systems, Beograd/Dubrovnik, Yugoslavia
|
|
|
1991 |
56-57 |
3 |
p. 264- 1 p. |
artikel |
494 |
Sequencing delivery and receiving operations for yard cranes in port container terminals
|
Kim, Kap Hwan |
|
2003 |
56-57 |
3 |
p. 283-292 10 p. |
artikel |
495 |
Service engineering—methodical development of new service products
|
Bullinger, Hans-Jörg |
|
2003 |
56-57 |
3 |
p. 275-287 13 p. |
artikel |
496 |
Setting preventive maintenance schedules when data are sparse
|
Percy, David F. |
|
1997 |
56-57 |
3 |
p. 223-234 12 p. |
artikel |
497 |
Shortening the new product introduction cycle through electronic data transfer
|
Standish, Richard |
|
1994 |
56-57 |
3 |
p. 347-357 11 p. |
artikel |
498 |
Simulating business and operations management–a learning environment for the electronics industry
|
Haapasalo, Harri |
|
2001 |
56-57 |
3 |
p. 261-272 12 p. |
artikel |
499 |
Simulation analysis of a pull-push system for an electronic assembly line
|
Savsar, Mehmet |
|
1997 |
56-57 |
3 |
p. 205-214 10 p. |
artikel |
500 |
Simulation study of CONWIP for a cold rolling plant
|
Huang, Min |
|
1998 |
56-57 |
3 |
p. 257-266 10 p. |
artikel |
501 |
Single-machine earliness-tardiness scheduling about a common due date with tolerances
|
Weng, Michael X. |
|
1996 |
56-57 |
3 |
p. 217-227 11 p. |
artikel |
502 |
Smoothing supply chain dynamics
|
Wikner, J |
|
1991 |
56-57 |
3 |
p. 231-248 18 p. |
artikel |
503 |
SPARTA II: Further development in an expert system for advising on stocks of spare parts
|
Petrović, D. |
|
1992 |
56-57 |
3 |
p. 291-300 10 p. |
artikel |
504 |
Special issue on quality in supply chain management and logistics
|
Cheng, T.C. Edwin |
|
2005 |
56-57 |
3 |
p. 287-288 2 p. |
artikel |
505 |
Special issue on supply chain management for the 21st century organizational competitiveness
|
Gunasekaran, A. |
|
2004 |
56-57 |
3 |
p. 209-212 4 p. |
artikel |
506 |
Specialization, teamwork, and production efficiency
|
Powell, Stephen G |
|
2000 |
56-57 |
3 |
p. 205-218 14 p. |
artikel |
507 |
Speed and efficiency — a statistical enquiry of manufacturing industries
|
Holmström, Jan |
|
1995 |
56-57 |
3 |
p. 185-191 7 p. |
artikel |
508 |
Stationary optimal lengths for the plant renewal problem
|
Luciano, E. |
|
2002 |
56-57 |
3 |
p. 287-293 7 p. |
artikel |
509 |
“Stochastic properties of a production-inventory process with planned production using transform methodology” [Int. J. Production Economics 45 (1996) 407–419]
|
Grubbström, Robert W. |
|
1997 |
56-57 |
3 |
p. 263- 1 p. |
artikel |
510 |
Strategic choice of flexible manufacturing technologies
|
Tseng, Mei-Chiun |
|
2004 |
56-57 |
3 |
p. 223-227 5 p. |
artikel |
511 |
Strategic diversification and capacity utilization
|
Pennings, Enrico |
|
2001 |
56-57 |
3 |
p. 261-272 12 p. |
artikel |
512 |
Strategic positioning of the order penetration point
|
Olhager, Jan |
|
2003 |
56-57 |
3 |
p. 319-329 11 p. |
artikel |
513 |
Strategy not tactics drives aggregate planning
|
Buxey, Geoff |
|
2003 |
56-57 |
3 |
p. 331-346 16 p. |
artikel |
514 |
Structuring and planning operations
|
O’Brien, Christopher |
|
2003 |
56-57 |
3 |
p. 273- 1 p. |
artikel |
515 |
Success factors for cooperative ventures in innovation and production systems
|
Marxt, Christian |
|
2002 |
56-57 |
3 |
p. 219-229 11 p. |
artikel |
516 |
Suppliers capability and price analysis chart
|
Chen, K.L. |
|
2005 |
56-57 |
3 |
p. 315-327 13 p. |
artikel |
517 |
Supply chain design and analysis:
|
Beamon, Benita M |
|
1998 |
56-57 |
3 |
p. 281-294 14 p. |
artikel |
518 |
Supply chain management survey of Swedish manufacturing firms
|
Olhager, Jan |
|
2004 |
56-57 |
3 |
p. 353-361 9 p. |
artikel |
519 |
Team roles in business process re-engineering
|
Launonen, Martti |
|
2002 |
56-57 |
3 |
p. 205-218 14 p. |
artikel |
520 |
Technical efficiency and productivity change of China's iron and steel industry
|
Ma, Jinlong |
|
2002 |
56-57 |
3 |
p. 293-312 20 p. |
artikel |
521 |
Techno-economic evaluation of waste lube oil rerefining
|
Ali, Mohammad Farhat |
|
1996 |
56-57 |
3 |
p. 263-273 11 p. |
artikel |
522 |
Technological innovation and employment: Data from a decade in Spain
|
Sacristán Dı́az, Macarena |
|
2002 |
56-57 |
3 |
p. 245-256 12 p. |
artikel |
523 |
Technological progress and optimal supply price
|
Dompere, Kofi Kissi |
|
1993 |
56-57 |
3 |
p. 365-381 17 p. |
artikel |
524 |
1992, 2–5 4th annual meeting of the international academy of business disciplines: Globalization of business-implications for the future, Washington, DC, USA
|
|
|
1991 |
56-57 |
3 |
p. 263-264 2 p. |
artikel |
525 |
The antecedent role of quality, information sharing and supply chain proximity on strategic alliance formation and performance
|
Narasimhan, Ram |
|
2005 |
56-57 |
3 |
p. 301-313 13 p. |
artikel |
526 |
The calculation of shadow prices for industrial wastes using distance functions: An analysis for Spanish ceramic pavements firms
|
Reig-Martı́nez, Ernest |
|
2001 |
56-57 |
3 |
p. 277-285 9 p. |
artikel |
527 |
The contribution of technology selection to core competencies
|
Torkkeli, Marko |
|
2002 |
56-57 |
3 |
p. 271-284 14 p. |
artikel |
528 |
The cutting stock problem — a survey
|
Cheng, C.H |
|
1994 |
56-57 |
3 |
p. 291-305 15 p. |
artikel |
529 |
The design of computer-integrated manufacturing systems
|
Gunasekaran, A. |
|
1994 |
56-57 |
3 |
p. 313-327 15 p. |
artikel |
530 |
The design of quality systems: A contingency approach
|
van der Bij, J.D |
|
1998 |
56-57 |
3 |
p. 309-319 11 p. |
artikel |
531 |
The development of gradual-priority weighting approach for the multi-objective flowshop scheduling problem
|
Chang, Pei-Chann |
|
2002 |
56-57 |
3 |
p. 171-183 13 p. |
artikel |
532 |
The difference between the managerial and mathematical interpretation of sensitivity analysis results in linear programming
|
Koltai, Tamás |
|
2000 |
56-57 |
3 |
p. 257-274 18 p. |
artikel |
533 |
The distribution-free newsboy problem with resalable returns
|
Mostard, Julien |
|
2005 |
56-57 |
3 |
p. 329-342 14 p. |
artikel |
534 |
The dual-phase learning–forgetting model
|
Jaber, M.Y. |
|
2002 |
56-57 |
3 |
p. 229-242 14 p. |
artikel |
535 |
The economic production lot-sizing problem with imperfect production processes and imperfect maintenance
|
Ben-Daya, Mohamed |
|
2002 |
56-57 |
3 |
p. 257-264 8 p. |
artikel |
536 |
The economic production quantity (EPQ) with shortage derived algebraically
|
Cárdenas-Barrón, Leopoldo Eduardo |
|
2001 |
56-57 |
3 |
p. 289-292 4 p. |
artikel |
537 |
The effect of large order quantities on expected profit in the single-period model
|
Khouja, Moutaz |
|
2001 |
56-57 |
3 |
p. 227-235 9 p. |
artikel |
538 |
The EUT maintenance model
|
Geraerds, W.M.J. |
|
1992 |
56-57 |
3 |
p. 209-216 8 p. |
artikel |
539 |
The evolution of a cellular manufacturing system – a longitudinal case study
|
Molleman, Eric |
|
2002 |
56-57 |
3 |
p. 305-322 18 p. |
artikel |
540 |
The impact of EDI on interorganizational integration
|
Prosser, Alexander |
|
1997 |
56-57 |
3 |
p. 269-281 13 p. |
artikel |
541 |
The impact of free goods on the performance of drum-buffer-rope scheduling systems
|
Chakravorty, Satya S. |
|
2005 |
56-57 |
3 |
p. 347-357 11 p. |
artikel |
542 |
The impact of lot-sizing on net profits and cycle times in the n-job, m-machine job shop with both discrete and batch processing
|
Kenyon, George |
|
2005 |
56-57 |
3 |
p. 263-278 16 p. |
artikel |
543 |
The impact of management accounting, product structure, product mix algorithm, and planning horizon on manufacturing performance
|
Lea, Bih-Ru |
|
2002 |
56-57 |
3 |
p. 279-299 21 p. |
artikel |
544 |
The impact of process control technology on Turkish chemical industry
|
Karaomerlioglu, Dilek Cetindamar |
|
1997 |
56-57 |
3 |
p. 307-321 15 p. |
artikel |
545 |
The impact of supply chain relationship quality on quality performance
|
Fynes, Brian |
|
2005 |
56-57 |
3 |
p. 339-354 16 p. |
artikel |
546 |
The manufacturing of heavy weight cardboard
|
Sierksma, Gerard |
|
2000 |
56-57 |
3 |
p. 295-303 9 p. |
artikel |
547 |
The MPS parameterization under lead time uncertainty
|
Ould-Louly, Mohamed-Aly |
|
2004 |
56-57 |
3 |
p. 369-376 8 p. |
artikel |
548 |
The optimal cycle time for EPQ inventory model under permissible delay in payments
|
Chung, Kun-Jen |
|
2003 |
56-57 |
3 |
p. 307-318 12 p. |
artikel |
549 |
The optimal mix of flexible and dedicated manufacturing capacities: Hedging against demand uncertainty
|
Gupta, Diwakar |
|
1992 |
56-57 |
3 |
p. 309-319 11 p. |
artikel |
550 |
The payback method of investment appraisal: A review and synthesis
|
Lefley, Frank |
|
1996 |
56-57 |
3 |
p. 207-224 18 p. |
artikel |
551 |
The reliability of equipment: Yesterday's research and tomorrow's requirements
|
Collcutt, R.H. |
|
1992 |
56-57 |
3 |
p. 235-242 8 p. |
artikel |
552 |
The restricted profit function and the application of the generalised Leontief and the translog functional forms
|
Bergman, Mats A. |
|
1997 |
56-57 |
3 |
p. 249-254 6 p. |
artikel |
553 |
The role of elasticity in supply chain performance
|
Hull, Bradley |
|
2005 |
56-57 |
3 |
p. 301-314 14 p. |
artikel |
554 |
The role of logistics in concurrent engineering
|
Dowlatshahi, S. |
|
1996 |
56-57 |
3 |
p. 189-199 11 p. |
artikel |
555 |
The (r,Q) control of a periodic-review inventory system with continuous demand and lost sales
|
Johansen, Søren Glud |
|
2000 |
56-57 |
3 |
p. 279-286 8 p. |
artikel |
556 |
The (R, Q) inventory policy subject to a compound Poisson demand pattern
|
Matheus, Peter |
|
2000 |
56-57 |
3 |
p. 307-317 11 p. |
artikel |
557 |
The scientific approach to problem solving and decision support systems
|
Ho, J.K.K. |
|
1997 |
56-57 |
3 |
p. 249-257 9 p. |
artikel |
558 |
The software engineers reference book
|
Urbán, Gábor |
|
1992 |
56-57 |
3 |
p. 291- 1 p. |
artikel |
559 |
The technology dimension of strategic leadership
|
Hinterhuber, Hans H |
|
2002 |
56-57 |
3 |
p. 191-203 13 p. |
artikel |
560 |
The use of knowledge-based systems in evaluation and enhancement of maintenance routines
|
Kobbacy, Khairy A.H. |
|
1992 |
56-57 |
3 |
p. 243-248 6 p. |
artikel |
561 |
The use of parametric and non-parametric frontier methods to measure the productive efficiency in the industrial sector: A comparative study
|
Murillo-Zamorano, Luis R. |
|
2001 |
56-57 |
3 |
p. 265-275 11 p. |
artikel |
562 |
The voting analytic hierarchy process method for selecting supplier
|
Liu, Fuh-Hwa Franklin |
|
2005 |
56-57 |
3 |
p. 308-317 10 p. |
artikel |
563 |
Timing the control point under the exponential stationary process
|
Friedman, Lea |
|
1992 |
56-57 |
3 |
p. 299-307 9 p. |
artikel |
564 |
Title index
|
|
|
1992 |
56-57 |
3 |
p. 302- 1 p. |
artikel |
565 |
Title index
|
|
|
1991 |
56-57 |
3 |
p. 266- 1 p. |
artikel |
566 |
Total product quality
|
Murthy, D.N.P. |
|
2000 |
56-57 |
3 |
p. 253-267 15 p. |
artikel |
567 |
Towards a more economic production and just-in-time delivery system
|
Zhuang, Li |
|
1994 |
56-57 |
3 |
p. 307-313 7 p. |
artikel |
568 |
Towards total integrated manufacturing
|
Bessant, John |
|
1994 |
56-57 |
3 |
p. 237-251 15 p. |
artikel |
569 |
Traditional and innovative paths towards time-based competition
|
De Toni, Alberto |
|
2000 |
56-57 |
3 |
p. 255-268 14 p. |
artikel |
570 |
Transshipments: An emerging inventory recourse to achieve supply chain leagility
|
Herer, Yale T. |
|
2002 |
56-57 |
3 |
p. 201-212 12 p. |
artikel |
571 |
Two-stage flowshop earliness and tardiness machine scheduling involving a common due window
|
Yeung, W.K. |
|
2004 |
56-57 |
3 |
p. 421-434 14 p. |
artikel |
572 |
Unquality-costing sampling plans by variables and their implications on supply relationships
|
D'Amours, Sophie |
|
1993 |
56-57 |
3 |
p. 315-326 12 p. |
artikel |
573 |
Unrelated parallel machine scheduling with setup consideration and a total weighted completion time objective
|
Weng, Michael X. |
|
2001 |
56-57 |
3 |
p. 215-226 12 p. |
artikel |
574 |
U-shaped production lines: A review of theory and practice
|
Miltenburg, John |
|
2001 |
56-57 |
3 |
p. 201-214 14 p. |
artikel |
575 |
Using business process re-engineering for the development of production efficiency in companies making engineered to order products
|
Cameron, N.S. |
|
2004 |
56-57 |
3 |
p. 261-273 13 p. |
artikel |
576 |
Using genetic algorithms to resolve layout problems in facilities where there are aisles
|
Gómez, A. |
|
2003 |
56-57 |
3 |
p. 271-282 12 p. |
artikel |
577 |
Using relative profits as an alternative to activity-based costing
|
Homburg, Carsten |
|
2005 |
56-57 |
3 |
p. 387-397 11 p. |
artikel |
578 |
Variance amplification and the golden ratio in production and inventory control
|
Disney, S.M. |
|
2004 |
56-57 |
3 |
p. 295-309 15 p. |
artikel |
579 |
Virtual e-Chain (VeC) model for supply chain collaboration
|
Manthou, Vicky |
|
2004 |
56-57 |
3 |
p. 241-250 10 p. |
artikel |
580 |
Volatility of sales, expectation errors, and inventory investment: Firm level evidence
|
Bo, Hong |
|
2001 |
56-57 |
3 |
p. 273-283 11 p. |
artikel |