nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A comment on Martin's: Note on an EOQ model with a temporary sale price
|
Goyal, S.K. |
|
1996 |
56-57 |
2-3 |
p. 283-284 2 p. |
artikel |
2 |
A conceptual and analytical framework for business process reengineering
|
Chan, Stephen L. |
|
1997 |
56-57 |
2-3 |
p. 211-223 13 p. |
artikel |
3 |
Addendum to: ”Determining economic replenishment interval for linear trend in demand [Int. J. Production Economics 34 (1994) 115–117]
|
Goyal, S.K. |
|
1995 |
56-57 |
2-3 |
p. 293- 1 p. |
artikel |
4 |
A fuzzy pooling of investment cost knowledge
|
Dohnal, M. |
|
1996 |
56-57 |
2-3 |
p. 91-106 16 p. |
artikel |
5 |
A hybrid econometric—neural network modeling approach for sales forecasting
|
Luxhøj, James T. |
|
1996 |
56-57 |
2-3 |
p. 175-192 18 p. |
artikel |
6 |
A mathematical programming approach towards optimized master production scheduling
|
Chu, Sydney C.K. |
|
1995 |
56-57 |
2-3 |
p. 269-279 11 p. |
artikel |
7 |
Ambiguity in multicriteria quality decisions
|
Gutiérrez, Isabel |
|
1995 |
56-57 |
2-3 |
p. 215-224 10 p. |
artikel |
8 |
A multipass optimization strategy for CNC lathe operations
|
Yeo, S.H. |
|
1995 |
56-57 |
2-3 |
p. 209-218 10 p. |
artikel |
9 |
An economic approach to job shop performance analysis
|
(Van) Enns, S.T. |
|
1995 |
56-57 |
2-3 |
p. 117-131 15 p. |
artikel |
10 |
An efficient heuristic procedure for the single-item, discrete lot sizing problem
|
Canel, Cem |
|
1996 |
56-57 |
2-3 |
p. 139-148 10 p. |
artikel |
11 |
An empirical study of capital budgeting practices for strategic investments in CIM technologies
|
Slagmulder, Regine |
|
1995 |
56-57 |
2-3 |
p. 121-152 32 p. |
artikel |
12 |
An example of the application of production system design tools for the implementation of business process reengineering
|
Jones, Thomas M. |
|
1997 |
56-57 |
2-3 |
p. 69-78 10 p. |
artikel |
13 |
An instrument for quality performance measurement
|
De Toni, A. |
|
1995 |
56-57 |
2-3 |
p. 199-207 9 p. |
artikel |
14 |
Announcement
|
|
|
1995 |
56-57 |
2-3 |
p. 239-240 2 p. |
artikel |
15 |
An options view of investments in expansion-flexible manufacturing systems
|
Kumar, Ram L. |
|
1995 |
56-57 |
2-3 |
p. 281-291 11 p. |
artikel |
16 |
Approximation approach for the performance analysis of production lines under a kanban discipline
|
Albino, Vito |
|
1995 |
56-57 |
2-3 |
p. 197-207 11 p. |
artikel |
17 |
Approximations for the mean and variance of the throughput of flexible manufacturing cells
|
Wang, P.Patrick |
|
1994 |
56-57 |
2-3 |
p. 275-284 10 p. |
artikel |
18 |
A project activity scheduling problem with net present value measure
|
Sung, C.S. |
|
1994 |
56-57 |
2-3 |
p. 177-187 11 p. |
artikel |
19 |
A strategic alignment approach for effective business process reengineering: linking strategy, processes and customers for competitive advantage
|
Lockamy III, Archie |
|
1997 |
56-57 |
2-3 |
p. 141-153 13 p. |
artikel |
20 |
A tabu search heuristic for the multiprocessor scheduling problem with sequence dependent setup times
|
França, Paulo M. |
|
1996 |
56-57 |
2-3 |
p. 79-89 11 p. |
artikel |
21 |
Author index to volume 40
|
|
|
1995 |
56-57 |
2-3 |
p. 241-242 2 p. |
artikel |
22 |
Author index to volume 38
|
|
|
1995 |
56-57 |
2-3 |
p. 299-300 2 p. |
artikel |
23 |
Author index to volume 50
|
|
|
1997 |
56-57 |
2-3 |
p. 277-278 2 p. |
artikel |
24 |
Author index to volume 43
|
|
|
1996 |
56-57 |
2-3 |
p. 303-304 2 p. |
artikel |
25 |
Author index to volume 37
|
|
|
1994 |
56-57 |
2-3 |
p. 295-296 2 p. |
artikel |
26 |
Batching in production planning for flexible manufacturing systems
|
Srivastava, Bharatendu |
|
1996 |
56-57 |
2-3 |
p. 127-137 11 p. |
artikel |
27 |
Batching policies for linearly increasing demand with a finite input rate
|
Hill, Roger M. |
|
1996 |
56-57 |
2-3 |
p. 149-154 6 p. |
artikel |
28 |
Bevölkerungsentwicklung, rentenfinanzierung und einkommenverteilung
|
Petersen, Jørn Henrik |
|
1996 |
56-57 |
2-3 |
p. 285-297 13 p. |
artikel |
29 |
Business process reengineering: Modelling and analysis
|
Gunasekaran, A. |
|
1997 |
56-57 |
2-3 |
p. 65-68 4 p. |
artikel |
30 |
Call for papers
|
|
|
1994 |
56-57 |
2-3 |
p. 293- 1 p. |
artikel |
31 |
Combined heuristics for bi-level group scheduling problems
|
Logendran, Rasaratnam |
|
1995 |
56-57 |
2-3 |
p. 133-145 13 p. |
artikel |
32 |
Competitive factors and performance measurement: Applying the theory of constraints to meet customer needs
|
Wahlers, James L. |
|
1994 |
56-57 |
2-3 |
p. 229-240 12 p. |
artikel |
33 |
Component kitting in semi-automated printed circuit board assembly
|
Günther, H.O. |
|
1996 |
56-57 |
2-3 |
p. 213-226 14 p. |
artikel |
34 |
Contents volume 50
|
|
|
1997 |
56-57 |
2-3 |
p. 279-280 2 p. |
artikel |
35 |
Contents volume 43
|
|
|
1996 |
56-57 |
2-3 |
p. 305-306 2 p. |
artikel |
36 |
Contents volume 37
|
|
|
1994 |
56-57 |
2-3 |
p. 297-298 2 p. |
artikel |
37 |
Contents volume 40
|
|
|
1995 |
56-57 |
2-3 |
p. 243-244 2 p. |
artikel |
38 |
Contents volume 38lume 38
|
|
|
1995 |
56-57 |
2-3 |
p. 301-302 2 p. |
artikel |
39 |
Corporate control of investments and management styles
|
Segelod, Esbjörn |
|
1996 |
56-57 |
2-3 |
p. 227-237 11 p. |
artikel |
40 |
Determination of the optimal target values for a filling process when inspection is based on a correlated variable
|
Lee, Min Koo |
|
1994 |
56-57 |
2-3 |
p. 205-213 9 p. |
artikel |
41 |
Development of computer-aided machining optimisation for multi-pass rough turning operations
|
Kee, P.K. |
|
1994 |
56-57 |
2-3 |
p. 215-227 13 p. |
artikel |
42 |
Diary of events
|
|
|
1995 |
56-57 |
2-3 |
p. 295-298 4 p. |
artikel |
43 |
Diary of events
|
|
|
1995 |
56-57 |
2-3 |
p. 235-238 4 p. |
artikel |
44 |
Diary of events
|
|
|
1996 |
56-57 |
2-3 |
p. 299-301 3 p. |
artikel |
45 |
Diary of events
|
|
|
1997 |
56-57 |
2-3 |
p. 275-276 2 p. |
artikel |
46 |
Diary of events
|
|
|
1994 |
56-57 |
2-3 |
p. 289-292 4 p. |
artikel |
47 |
Distribution planning for a divergent N-echelon network without intermediate stocks under service restrictions
|
Verrijdt, J.H.C.M. |
|
1995 |
56-57 |
2-3 |
p. 225-243 19 p. |
artikel |
48 |
Due-date assignment and single machine scheduling with compressible processing times
|
Cheng, T.C.E. |
|
1996 |
56-57 |
2-3 |
p. 107-113 7 p. |
artikel |
49 |
Empirically testing ES success factors in business process reengineering
|
Guimaraes, Tor |
|
1997 |
56-57 |
2-3 |
p. 245-259 15 p. |
artikel |
50 |
Empirically testing the antecedents of BPR success
|
Guimaraes, Tor |
|
1997 |
56-57 |
2-3 |
p. 199-210 12 p. |
artikel |
51 |
Erratum to: “An analytic eclectic heuristic for replenishment with linear increasing demand” [Int. J. Production Economics 32 (1993) 261]
|
Yang, J. |
|
1994 |
56-57 |
2-3 |
p. 285- 1 p. |
artikel |
52 |
Erratum to: “Safety stocks in multistage divergent inventory systems: A survey” [Int. J. production economics 35(1994) 321]
|
Inderfurth, Karl |
|
1994 |
56-57 |
2-3 |
p. 287-288 2 p. |
artikel |
53 |
Estimation of investment costs in fish processing plants
|
Montaner, María Inés |
|
1995 |
56-57 |
2-3 |
p. 153-161 9 p. |
artikel |
54 |
Evaluating product and process design changes with warranty data
|
Majeske, Karl D. |
|
1997 |
56-57 |
2-3 |
p. 79-89 11 p. |
artikel |
55 |
Evaluation of corporate environmental management approaches: A framework and application
|
Vastag, Gyula |
|
1996 |
56-57 |
2-3 |
p. 193-211 19 p. |
artikel |
56 |
Evolving requirements for a reengineering model for ferrous foundries in India — An experience
|
Shivappa, D.N. |
|
1997 |
56-57 |
2-3 |
p. 225-243 19 p. |
artikel |
57 |
Formal business process engineering based on graph grammars
|
Klauck, Christoph |
|
1997 |
56-57 |
2-3 |
p. 129-140 12 p. |
artikel |
58 |
From TQM to BPR: Two case studies in personnel administration
|
De Bruyn, Barbara |
|
1997 |
56-57 |
2-3 |
p. 169-181 13 p. |
artikel |
59 |
Human-resource-based models of production systems
|
Hempel, Paul S. |
|
1996 |
56-57 |
2-3 |
p. 239-249 11 p. |
artikel |
60 |
Implementing flexible automation: A multiple criteria decision making approach
|
Lotfi, Vahid |
|
1995 |
56-57 |
2-3 |
p. 255-268 14 p. |
artikel |
61 |
Industrial job-shop scheduling with random operations and different priorities
|
Golenko-Ginzburg, Dimitri |
|
1995 |
56-57 |
2-3 |
p. 185-195 11 p. |
artikel |
62 |
In memoriam: Professor John Leonard Burbidge OBE, 1915–1995
|
Grubbström, Robert W. |
|
1996 |
56-57 |
2-3 |
p. 259- 1 p. |
artikel |
63 |
Joint pricing and replenishment policy for deteriorating inventory with declining market
|
Wee, Hui-Ming |
|
1995 |
56-57 |
2-3 |
p. 163-171 9 p. |
artikel |
64 |
Layout design in group technology manufacturing
|
Hassan, Mohsen M.D. |
|
1995 |
56-57 |
2-3 |
p. 173-188 16 p. |
artikel |
65 |
Layout problem for an aircraft maintenance company tool room
|
Miu-ling Rosa, Lee |
|
1995 |
56-57 |
2-3 |
p. 219-230 12 p. |
artikel |
66 |
Learning-induced control model to allocate managerial resources for production technology development
|
Kim, Bowon |
|
1996 |
56-57 |
2-3 |
p. 267-282 16 p. |
artikel |
67 |
Lynn Underwood: Intelligent manufacturing
|
Wimmer, Ágnes |
|
1995 |
56-57 |
2-3 |
p. 231- 1 p. |
artikel |
68 |
Managing demand uncertainty through order overplanning
|
Bartezzaghi, Emilio |
|
1995 |
56-57 |
2-3 |
p. 107-120 14 p. |
artikel |
69 |
Manufacturing cost estimation for PCB assembly: An activity-based approach
|
Ong, N.S. |
|
1995 |
56-57 |
2-3 |
p. 159-172 14 p. |
artikel |
70 |
Market share and warranty costs for renewable warranty programs
|
Mitra, Amitava |
|
1997 |
56-57 |
2-3 |
p. 155-168 14 p. |
artikel |
71 |
New wave manufacturing strategies: Organization and human resource management dimensions
|
Demeter, Krisztina |
|
1995 |
56-57 |
2-3 |
p. 232- 1 p. |
artikel |
72 |
Note on an EOQ model with a temporary sale price
|
Martin, G.E. |
|
1994 |
56-57 |
2-3 |
p. 241-243 3 p. |
artikel |
73 |
On the utilization of a split production system with inter-stage inspection
|
Gopalan, M.N. |
|
1995 |
56-57 |
2-3 |
p. 107-116 10 p. |
artikel |
74 |
Optimal pricing and product-planning for new multiattribute products based on conjoint analysis
|
Yoo, Dong-il |
|
1995 |
56-57 |
2-3 |
p. 245-253 9 p. |
artikel |
75 |
Pension incentives and job mobility
|
Petersen, Jørn Henrik |
|
1996 |
56-57 |
2-3 |
p. 285-297 13 p. |
artikel |
76 |
Performance modeling of an FMS with finite input and output buffers
|
Sung, C.S. |
|
1994 |
56-57 |
2-3 |
p. 161-175 15 p. |
artikel |
77 |
Performance modeling of multistage production systems operating under hybrid push/pull control
|
Pandey, P.C. |
|
1996 |
56-57 |
2-3 |
p. 115-126 12 p. |
artikel |
78 |
Private pension policies in industrialized countries
|
Petersen, Jørn Henrik |
|
1996 |
56-57 |
2-3 |
p. 285-297 13 p. |
artikel |
79 |
Process reengineering: A review of enablers
|
Love, P.E.D. |
|
1997 |
56-57 |
2-3 |
p. 183-197 15 p. |
artikel |
80 |
Public pension economics
|
Petersen, Jørn Henrik |
|
1996 |
56-57 |
2-3 |
p. 285-297 13 p. |
artikel |
81 |
Publisher's note
|
|
|
1994 |
56-57 |
2-3 |
p. 159- 1 p. |
artikel |
82 |
Reengineering the production planning process in the food industry
|
Houghton, Erne |
|
1997 |
56-57 |
2-3 |
p. 105-116 12 p. |
artikel |
83 |
Regulating employment and welfare
|
Petersen, Jørn Henrik |
|
1996 |
56-57 |
2-3 |
p. 285-297 13 p. |
artikel |
84 |
Reply on “Note on an EOQ model with a temporary sale price”
|
Tersine, Richard J. |
|
1994 |
56-57 |
2-3 |
p. 245- 1 p. |
artikel |
85 |
Strategic planning in manufacturing systems — AHP application to an equipment replacement decision
|
Oeltjenbruns, Henning |
|
1995 |
56-57 |
2-3 |
p. 189-197 9 p. |
artikel |
86 |
Telecommunications in Greece: A study of production structure and natural monopoly issue
|
Christodoulopoulos, Th. |
|
1995 |
56-57 |
2-3 |
p. 147-157 11 p. |
artikel |
87 |
The application of an open queueing network to the analysis of cycle time, variability, throughput, inventory and cost in the batch production system of a microelectronics manufacturer
|
Lynes, Krysia |
|
1994 |
56-57 |
2-3 |
p. 189-203 15 p. |
artikel |
88 |
The economics of pensions and variable retirement schemes
|
Petersen, Jørn Henrik |
|
1996 |
56-57 |
2-3 |
p. 285-297 13 p. |
artikel |
89 |
The effects of task and information asymmetry on business process redesign
|
Seidmann, Abraham |
|
1997 |
56-57 |
2-3 |
p. 117-128 12 p. |
artikel |
90 |
The first step in planning group technology
|
Burbidge, John L. |
|
1996 |
56-57 |
2-3 |
p. 261-266 6 p. |
artikel |
91 |
The impact of multiple stocking points on system profitability
|
Meller, Russell D. |
|
1995 |
56-57 |
2-3 |
p. 209-214 6 p. |
artikel |
92 |
The management of manufacturing models and analysis
|
Dolgos, Olga |
|
1995 |
56-57 |
2-3 |
p. 233- 1 p. |
artikel |
93 |
The obstacles to successful CIM
|
McGaughey, Ronald E. |
|
1994 |
56-57 |
2-3 |
p. 247-258 12 p. |
artikel |
94 |
The practice of production control techniques in the manufacturing sectors in the Eastern Province of Saudi Arabia
|
Andijani, A. |
|
1996 |
56-57 |
2-3 |
p. 251-258 8 p. |
artikel |
95 |
The role of information technology in business process reengineering
|
Gunasekaran, A. |
|
1997 |
56-57 |
2-3 |
p. 91-104 14 p. |
artikel |
96 |
The strategic evaluation of candidate business process reengineering projects
|
Sarkis, Joseph |
|
1997 |
56-57 |
2-3 |
p. 261-274 14 p. |
artikel |
97 |
The utilization of artificial intelligence to achieve availability improvement in automated manufacture
|
Davies, A. |
|
1994 |
56-57 |
2-3 |
p. 259-274 16 p. |
artikel |
98 |
Travel time models in automated storage/retrieval systems: A critical review
|
Sarker, Bhaba R. |
|
1995 |
56-57 |
2-3 |
p. 173-184 12 p. |
artikel |
99 |
What difference does your industry make?
|
Hamblin, David |
|
1996 |
56-57 |
2-3 |
p. 155-174 20 p. |
artikel |