no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
A heuristic for network project scheduling with random activity durations depending on the resource allocation
|
Golenko-Ginzburg, Dimitri |
|
1998 |
55 |
2 |
p. 149-162 14 p. |
article |
2 |
A heuristic to minimize a quadratic function of job lateness on a single machine
|
Su, Ling-Huey |
|
1998 |
55 |
2 |
p. 169-175 7 p. |
article |
3 |
A note on the convexity of the objective function for a simple common component inventory problem
|
Fu, Haizhen |
|
1998 |
55 |
2 |
p. 143-148 6 p. |
article |
4 |
A quantitative approach to estimate the size of the time buffer in the theory of constraints
|
Radovilsky, Zinovy D. |
|
1998 |
55 |
2 |
p. 113-119 7 p. |
article |
5 |
Diary of events
|
|
|
1998 |
55 |
2 |
p. 221-222 2 p. |
article |
6 |
Imperfect maintenance policies for deteriorating production systems
|
Sheng-Tsaing Tseng, |
|
1998 |
55 |
2 |
p. 191-201 11 p. |
article |
7 |
One machine scheduling to minimize the maximum earliness with minimum number of tardy jobs
|
Güner, Ertan |
|
1998 |
55 |
2 |
p. 213-219 7 p. |
article |
8 |
Optimal design of a generalized conveyor-serviced production station: Fixed and removal item cases
|
Feyzbakhsh, S.A. |
|
1998 |
55 |
2 |
p. 177-189 13 p. |
article |
9 |
Simulation modelling and analysis of a JIT production system
|
Baykoç, Ömer Faruk |
|
1998 |
55 |
2 |
p. 203-212 10 p. |
article |
10 |
Tardiness minimization on parallel machines
|
Azizoglu, Meral |
|
1998 |
55 |
2 |
p. 163-168 6 p. |
article |
11 |
The impact of parameters setting in load oriented manufacturing control
|
Perona, Marco |
|
1998 |
55 |
2 |
p. 133-142 10 p. |
article |
12 |
The management and organisational context of new product development: Diagnosis and self-assessment
|
McQuater, R.E. |
|
1998 |
55 |
2 |
p. 121-131 11 p. |
article |