nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A genetic algorithm-based planning system for PCB component placement
|
Khoo, L.P. |
|
1998 |
54 |
3 |
p. 321-332 12 p. |
artikel |
2 |
An approximate method for calculating the mean sojourn time of K-station production lines with no intermediate buffers
|
Papadopoulos, H.T. |
|
1998 |
54 |
3 |
p. 297-305 9 p. |
artikel |
3 |
Computer-aided economic optimization of end-milling operations
|
Wang, J. |
|
1998 |
54 |
3 |
p. 307-320 14 p. |
artikel |
4 |
High performance heuristic algorithm for controlling stochastic network projects
|
Golenko-Ginzburg, Dimitri |
|
1998 |
54 |
3 |
p. 235-245 11 p. |
artikel |
5 |
Inventory investment, product cycles, and the imperfectly competitive firm
|
Jones, Philip C. |
|
1998 |
54 |
3 |
p. 267-276 10 p. |
artikel |
6 |
Minimizing total weighted completion time at a pre-assembly stage composed of two feeding machines
|
Chang Sup Sung, |
|
1998 |
54 |
3 |
p. 247-255 9 p. |
artikel |
7 |
On the applicability of activity based costing as a planning instrument
|
Schneeweiss, Ch. |
|
1998 |
54 |
3 |
p. 277-284 8 p. |
artikel |
8 |
Predictive maintenance: The one-unit replacement model
|
Chu, Chengbin |
|
1998 |
54 |
3 |
p. 285-295 11 p. |
artikel |
9 |
Simulation study of CONWIP for a cold rolling plant
|
Huang, Min |
|
1998 |
54 |
3 |
p. 257-266 10 p. |
artikel |