no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations
|
McMullen, Patrick R. |
|
1997 |
51 |
3 |
p. 177-190 14 p. |
article |
2 |
An algorithm to determine the EOQ for deteriorating items with shortage and a linear trend in demand
|
Chung, Kun-Jen |
|
1997 |
51 |
3 |
p. 215-221 7 p. |
article |
3 |
Author index to volume 51
|
|
|
1997 |
51 |
3 |
p. 265-266 2 p. |
article |
4 |
Contents volume 51
|
|
|
1997 |
51 |
3 |
p. 267-268 2 p. |
article |
5 |
Delivery capability and firm performance in international operations
|
Fawcett, Stanley E. |
|
1997 |
51 |
3 |
p. 191-204 14 p. |
article |
6 |
Diary of events
|
|
|
1997 |
51 |
3 |
p. 264- 1 p. |
article |
7 |
Evolution of a decision support system for human resource planning in a petroleum company
|
Mohanty, R.P. |
|
1997 |
51 |
3 |
p. 251-261 11 p. |
article |
8 |
Manufacturing blocking discipline: A multi-criterion approach for buffer allocations
|
Andijani, A.A. |
|
1997 |
51 |
3 |
p. 155-163 9 p. |
article |
9 |
Planning of fuel coal imports using a mixed integer programming method
|
Shih, Li-Hsing |
|
1997 |
51 |
3 |
p. 243-249 7 p. |
article |
10 |
Schedule based production
|
Yeh, Chung-Hsing |
|
1997 |
51 |
3 |
p. 235-242 8 p. |
article |
11 |
Scheduling families of jobs with setup times
|
Liaee, Mohammad Mehdi |
|
1997 |
51 |
3 |
p. 165-176 12 p. |
article |
12 |
Setting preventive maintenance schedules when data are sparse
|
Percy, David F. |
|
1997 |
51 |
3 |
p. 223-234 12 p. |
article |
13 |
Simulation analysis of a pull-push system for an electronic assembly line
|
Savsar, Mehmet |
|
1997 |
51 |
3 |
p. 205-214 10 p. |
article |
14 |
“Stochastic properties of a production-inventory process with planned production using transform methodology” [Int. J. Production Economics 45 (1996) 407–419]
|
Grubbström, Robert W. |
|
1997 |
51 |
3 |
p. 263- 1 p. |
article |