no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
Analytical approach of determining job division in manual assembly systems
|
Zülch, Gert |
|
1997 |
51 |
1-2 |
p. 123-134 12 p. |
article |
2 |
A parallel genetic-neuro scheduler for job-shop scheduling problems
|
Lee, H.C. |
|
1997 |
51 |
1-2 |
p. 115-122 8 p. |
article |
3 |
Design and testing of piezoelectric actuator-controlled boring bar for active compensation of cutting force induced errors
|
Chiu, W.M. |
|
1997 |
51 |
1-2 |
p. 135-148 14 p. |
article |
4 |
Design of a simulation library for CIM
|
Pollatschek, M.A. |
|
1997 |
51 |
1-2 |
p. 99-107 9 p. |
article |
5 |
Editorial Board
|
|
|
1997 |
51 |
1-2 |
p. iii-v nvt p. |
article |
6 |
Innovation paths in product development: An empirical research
|
Calderini, Mario |
|
1997 |
51 |
1-2 |
p. 1-17 17 p. |
article |
7 |
Integrating corporate learning with project management
|
Ayas, Karen |
|
1997 |
51 |
1-2 |
p. 59-67 9 p. |
article |
8 |
Introduction
|
Dar-El, E.M. |
|
1997 |
51 |
1-2 |
p. ix-x nvt p. |
article |
9 |
Investigation of chip formation during milling
|
Kovac, Pavel |
|
1997 |
51 |
1-2 |
p. 149-153 5 p. |
article |
10 |
Operations management of multiple machine automatic warehousing systems
|
Eben-Chaime, Moshe |
|
1997 |
51 |
1-2 |
p. 83-98 16 p. |
article |
11 |
Optimal flow control of flexible manufacturing systems: Setup localization by an iterative procedure
|
Kogan, Konstantin |
|
1997 |
51 |
1-2 |
p. 37-46 10 p. |
article |
12 |
Planning of multi-site production — an object-oriented model
|
Bullinger, H.-J. |
|
1997 |
51 |
1-2 |
p. 19-35 17 p. |
article |
13 |
Real-time operational control of an FMS with full routing flexibility
|
Byrne, M.D. |
|
1997 |
51 |
1-2 |
p. 109-113 5 p. |
article |
14 |
Team-oriented assembly system design: A new approach
|
Bukchin, Joseph |
|
1997 |
51 |
1-2 |
p. 47-57 11 p. |
article |
15 |
The Metered Inventory Routing Problem, an integrative heuristic algorithm
|
Herer, Yale T. |
|
1997 |
51 |
1-2 |
p. 69-81 13 p. |
article |