no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
Adoption and implementation of advanced manufacturing technology in Singapore
|
Zhao, Hongxin |
|
1997 |
48 |
1 |
p. 7-19 13 p. |
article |
2 |
An empirical analysis of productivity and complexity for flexible manufacturing systems
|
Sarkis, Joseph |
|
1997 |
48 |
1 |
p. 39-48 10 p. |
article |
3 |
Batching to minimize total production time for two part types
|
Ching, Chung Yaw |
|
1997 |
48 |
1 |
p. 63-72 10 p. |
article |
4 |
Cluster goodness: A new measure of performance for cluster formation in the design of cellular manufacturing systems
|
Nair, G.Jayakrishnan |
|
1997 |
48 |
1 |
p. 49-61 13 p. |
article |
5 |
Comparison of echelon stock and installation stock policies with policy adjusted order quantities
|
Axsäter, Sven |
|
1997 |
48 |
1 |
p. 1-6 6 p. |
article |
6 |
Diary of events
|
|
|
1997 |
48 |
1 |
p. 107-108 2 p. |
article |
7 |
Distribution free procedures for make-to-order (MTO), make-in-advance (MIA), and composite policies
|
Moon, Ilkyeong |
|
1997 |
48 |
1 |
p. 21-28 8 p. |
article |
8 |
Editorial Board
|
|
|
1997 |
48 |
1 |
p. iii-vi nvt p. |
article |
9 |
Efficient dispatching rules for scheduling in a job shop
|
Holthaus, Oliver |
|
1997 |
48 |
1 |
p. 87-105 19 p. |
article |
10 |
Stochastic network project scheduling with non-consumable limited resources
|
Golenko-Ginzburg, Dimitri |
|
1997 |
48 |
1 |
p. 29-37 9 p. |
article |
11 |
The scheduling of economic lot sizes on volume flexible production systems
|
Khouja, Moutaz |
|
1997 |
48 |
1 |
p. 73-86 14 p. |
article |