Digital Library
Close Browse articles from a journal
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
                                       All articles of the corresponding issues
 
                             10 results found
no title author magazine year volume issue page(s) type
1 Aggregate planning with continuous time Dobos, Imre
1996
43 1 p. 1-9
9 p.
article
2 A technical note on using work sampling to estimate the effort on activities under activity-based costing Tsai, Wen-Hsien
1996
43 1 p. 11-16
6 p.
article
3 Diary of events 1996
43 1 p. 75-77
3 p.
article
4 Due-date assignment and single machine scheduling with compressible processing times Cheng, T.C.E.
1996
43 1 p. 29-35
7 p.
article
5 Editorial Board 1996
43 1 p. iii-vi
nvt p.
article
6 Improving buyer-seller system cooperation through inventory control Li, Susan X.
1996
43 1 p. 37-46
10 p.
article
7 Linking profits to Greek bank production management Vasiliou, Dimitrios
1996
43 1 p. 67-73
7 p.
article
8 Modelling resource supply and demand: Expanding the utility of ABC Salafatinos, Chris
1996
43 1 p. 47-57
11 p.
article
9 Multicriterial production planning by De Novo programming approach Babic, Z.
1996
43 1 p. 59-66
8 p.
article
10 Performance modeling of multistage production systems operating under hybrid push/pull control Pandey, P.C.
1996
43 1 p. 17-28
12 p.
article
                             10 results found
 
 Koninklijke Bibliotheek - National Library of the Netherlands