no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
A branch and bound algorithm for scheduling just-in-time mixed-model assembly lines
|
Ng, W.C. |
|
1994 |
33 |
1-3 |
p. 169-183 15 p. |
article |
2 |
Adaptive diagnostic procedure for failures in a series system
|
Jinsheng, Gao |
|
1994 |
33 |
1-3 |
p. 75-79 5 p. |
article |
3 |
A method of flexible scheduling for flexible manufacturing systems
|
Choi, Junghee |
|
1994 |
33 |
1-3 |
p. 247-255 9 p. |
article |
4 |
A multiple-criteria approach to machine selection for flexible manufacturing systems
|
Myint, San |
|
1994 |
33 |
1-3 |
p. 121-131 11 p. |
article |
5 |
An economic manufacturing quantity model with learning effects
|
Cheng, T.C.E. |
|
1994 |
33 |
1-3 |
p. 257-264 8 p. |
article |
6 |
An expert system for choosing demand forecasting techniques
|
Lo, Tammy |
|
1994 |
33 |
1-3 |
p. 5-15 11 p. |
article |
7 |
An integration approach to process design and parts-layout planning
|
Ohashi, Kazumasa |
|
1994 |
33 |
1-3 |
p. 237-245 9 p. |
article |
8 |
An optimal operation planning for the fixed quantity withdrawal Kanban system with variable leadtimes
|
Yanagawa, Yoshinari |
|
1994 |
33 |
1-3 |
p. 163-168 6 p. |
article |
9 |
A simulation study of unit exchange spares management of diesel locomotives in the Indian railways
|
Kumar, Narendra |
|
1994 |
33 |
1-3 |
p. 225-236 12 p. |
article |
10 |
A study of heuristics for bidirectional multi-hoist production scheduling systems
|
Sun, T.C. |
|
1994 |
33 |
1-3 |
p. 207-214 8 p. |
article |
11 |
Author index to volume 33
|
|
|
1994 |
33 |
1-3 |
p. 275-276 2 p. |
article |
12 |
Batch-scheduling problems to minimize inventory cost in the shop with both receiving and delivery just-in-times
|
Hakim Halim, Abdul |
|
1994 |
33 |
1-3 |
p. 185-194 10 p. |
article |
13 |
Designing of a components-oriented ordering system
|
Hiraki, Shusaku |
|
1994 |
33 |
1-3 |
p. 143-153 11 p. |
article |
14 |
Diary of events
|
|
|
1994 |
33 |
1-3 |
p. 271-274 4 p. |
article |
15 |
Editorial Board
|
|
|
1994 |
33 |
1-3 |
p. iii-vii nvt p. |
article |
16 |
Expert system for AGV managing in bidirectional networks: KADS methodology based approach
|
Dhouib, Karem |
|
1994 |
33 |
1-3 |
p. 31-43 13 p. |
article |
17 |
Facilities layout: A knowledge-based approach for converting a dual graph into a block layout
|
Welgama, P.S. |
|
1994 |
33 |
1-3 |
p. 17-30 14 p. |
article |
18 |
Group technology concepts as applied to flexible manufacturing systems
|
Radharamanan, R. |
|
1994 |
33 |
1-3 |
p. 133-142 10 p. |
article |
19 |
Just-in-time shipments in a truck-traffic-coordination system
|
Pleschberger, Thomas E. |
|
1994 |
33 |
1-3 |
p. 195-205 11 p. |
article |
20 |
Local search algorithms for flow shop scheduling with fuzzy due-dates
|
Ishibuchi, Hisao |
|
1994 |
33 |
1-3 |
p. 53-66 14 p. |
article |
21 |
Neural network approach for minimizing the makespan of the general job-shop
|
Satake, Tsuyoshi |
|
1994 |
33 |
1-3 |
p. 67-74 8 p. |
article |
22 |
Optimal input control for job-shop type production systems using inverse queueing network analysis
|
Kuroda, M. |
|
1994 |
33 |
1-3 |
p. 215-223 9 p. |
article |
23 |
Optimal sequence of partial inspections subject to errors
|
Liou, Ming-Jong |
|
1994 |
33 |
1-3 |
p. 109-119 11 p. |
article |
24 |
Pacific manufacturing
|
Tabucanon, Mario T. |
|
1994 |
33 |
1-3 |
p. 1-3 3 p. |
article |
25 |
Production scheduling to satisfy worker's preferences for days off and overtime under due-date constraints
|
Yura, Kenji |
|
1994 |
33 |
1-3 |
p. 265-270 6 p. |
article |
26 |
Pull-Push integration in production ordering systems
|
Takahashi, Katsuhiko |
|
1994 |
33 |
1-3 |
p. 155-161 7 p. |
article |
27 |
Quality control through lot sizing for items sold with warranty
|
Djamaludin, I. |
|
1994 |
33 |
1-3 |
p. 97-107 11 p. |
article |
28 |
Sensitivity analysis on the CUSUM method
|
Radharamanan, R. |
|
1994 |
33 |
1-3 |
p. 89-95 7 p. |
article |
29 |
Some practical issues in the assessment of nonconforming rates in a manufacturing process
|
Goh, T.N. |
|
1994 |
33 |
1-3 |
p. 81-88 8 p. |
article |
30 |
The usefulness of possibilistic programming in production planning problems
|
Inuiguchi, Masahiro |
|
1994 |
33 |
1-3 |
p. 45-52 8 p. |
article |