Digital Library
Close Browse articles from a journal
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
                                       All articles of the corresponding issues
 
                             11 results found
no title author magazine year volume issue page(s) type
1 A fuzzy upgrading of integrated vague managerial and engineering knowledge Dohnal, M.
1993
32 2 p. 209-228
20 p.
article
2 An analytic eclectic heuristic for replenishment with linear increasing demand Yang, J.
1993
32 2 p. 261-266
6 p.
article
3 A neural-network-based approach for estimating the cost of assembly systems Shtub, Avraham
1993
32 2 p. 189-207
19 p.
article
4 An optimal batch size for a production system operating under a just-in-time delivery system Jamal, A.M.M.
1993
32 2 p. 255-260
6 p.
article
5 A note on “minimizing a quadratic function of job lateness on a single machine” Tadei, Roberto
1993
32 2 p. 185-187
3 p.
article
6 Classification and coding of components for implementing a computerized inventory control system for a television assembling industry Rajamani, Divakar
1993
32 2 p. 133-154
22 p.
article
7 Comparing performance measures in dynamic job shops: economics vs. time Rohleder, Thomas R.
1993
32 2 p. 169-183
15 p.
article
8 Diary of events 1993
32 2 p. 267-
1 p.
article
9 Linear programming optimization of a network for an aluminum plant: A case study Farkas, Andras
1993
32 2 p. 155-168
14 p.
article
10 Multiobjective facility layout using simulated annealing Suresh, G.
1993
32 2 p. 239-254
16 p.
article
11 Outage costs caused by various outage depths Hsu, George J.Y.
1993
32 2 p. 229-237
9 p.
article
                             11 results found
 
 Koninklijke Bibliotheek - National Library of the Netherlands