no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
A fuzzy upgrading of integrated vague managerial and engineering knowledge
|
Dohnal, M. |
|
1993 |
32 |
2 |
p. 209-228 20 p. |
article |
2 |
An analytic eclectic heuristic for replenishment with linear increasing demand
|
Yang, J. |
|
1993 |
32 |
2 |
p. 261-266 6 p. |
article |
3 |
A neural-network-based approach for estimating the cost of assembly systems
|
Shtub, Avraham |
|
1993 |
32 |
2 |
p. 189-207 19 p. |
article |
4 |
An optimal batch size for a production system operating under a just-in-time delivery system
|
Jamal, A.M.M. |
|
1993 |
32 |
2 |
p. 255-260 6 p. |
article |
5 |
A note on “minimizing a quadratic function of job lateness on a single machine”
|
Tadei, Roberto |
|
1993 |
32 |
2 |
p. 185-187 3 p. |
article |
6 |
Classification and coding of components for implementing a computerized inventory control system for a television assembling industry
|
Rajamani, Divakar |
|
1993 |
32 |
2 |
p. 133-154 22 p. |
article |
7 |
Comparing performance measures in dynamic job shops: economics vs. time
|
Rohleder, Thomas R. |
|
1993 |
32 |
2 |
p. 169-183 15 p. |
article |
8 |
Diary of events
|
|
|
1993 |
32 |
2 |
p. 267- 1 p. |
article |
9 |
Linear programming optimization of a network for an aluminum plant: A case study
|
Farkas, Andras |
|
1993 |
32 |
2 |
p. 155-168 14 p. |
article |
10 |
Multiobjective facility layout using simulated annealing
|
Suresh, G. |
|
1993 |
32 |
2 |
p. 239-254 16 p. |
article |
11 |
Outage costs caused by various outage depths
|
Hsu, George J.Y. |
|
1993 |
32 |
2 |
p. 229-237 9 p. |
article |