nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A bicriterion approach to deal with a constrained single-objective problem
|
Dhaenens-Flipo, Clarisse |
|
2001 |
30-31 |
1-3 |
p. 93-101 9 p. |
artikel |
2 |
A branch and bound algorithm for scheduling just-in-time mixed-model assembly lines
|
Ng, W.C. |
|
1994 |
30-31 |
1-3 |
p. 169-183 15 p. |
artikel |
3 |
A branch-and-bound algorithm for the hybrid flowshop
|
Moursli, O. |
|
2000 |
30-31 |
1-3 |
p. 113-125 13 p. |
artikel |
4 |
A capacity-constrained multi-level inventory and production control problem
|
Segerstedt, Anders |
|
1996 |
30-31 |
1-3 |
p. 449-461 13 p. |
artikel |
5 |
A comparison of fixed and adaptive type controls for multi-product processing
|
Kelle, Peter |
|
1996 |
30-31 |
1-3 |
p. 139-146 8 p. |
artikel |
6 |
A comparison of the behavior of Japanese and US inventories
|
West, Kenneth D. |
|
1992 |
30-31 |
1-3 |
p. 115-122 8 p. |
artikel |
7 |
A computer-aided inventory control system in China
|
Hong, Yang |
|
1994 |
30-31 |
1-3 |
p. 153-159 7 p. |
artikel |
8 |
A conceptual framework for managing congestion in manufacturing
|
Gunasekaran, A |
|
1996 |
30-31 |
1-3 |
p. 111-119 9 p. |
artikel |
9 |
A concurrent engineering approach to chemical process design
|
Herder, Paulien M |
|
2000 |
30-31 |
1-3 |
p. 311-318 8 p. |
artikel |
10 |
A cooperative production planning method in the field of continuous process plants
|
Resteanu, Cornel |
|
2000 |
30-31 |
1-3 |
p. 65-78 14 p. |
artikel |
11 |
A coordinated order-up-to inventory control policy for a single supplier and multiple buyers using electronic data interchange
|
Banerjee, Avijit |
|
1994 |
30-31 |
1-3 |
p. 85-91 7 p. |
artikel |
12 |
Actions taken to prevent the propagation of disturbances in manufacturing systems
|
Lindau, Roger A. |
|
1995 |
30-31 |
1-3 |
p. 241-248 8 p. |
artikel |
13 |
Activity-based costing and distribution logistics management
|
Pirttilä, Timo |
|
1995 |
30-31 |
1-3 |
p. 327-333 7 p. |
artikel |
14 |
A customer oriented approach to warehouse network evaluation and design
|
Korpela, Jukka |
|
1999 |
30-31 |
1-3 |
p. 135-146 12 p. |
artikel |
15 |
Adaptive diagnostic procedure for failures in a series system
|
Jinsheng, Gao |
|
1994 |
30-31 |
1-3 |
p. 75-79 5 p. |
artikel |
16 |
Adaptive input control for job-shop type production systems with varying demands using inverse queueing network analysis
|
Kuroda, M. |
|
1995 |
30-31 |
1-3 |
p. 217-225 9 p. |
artikel |
17 |
A decision aid in warehouse site selection
|
Korpela, Jukka |
|
1996 |
30-31 |
1-3 |
p. 169-180 12 p. |
artikel |
18 |
A decision-making policy for capital investment concerning the size of a production unit
|
Kalfakakou, Ria |
|
1994 |
30-31 |
1-3 |
p. 331-335 5 p. |
artikel |
19 |
A decision support system for materials management
|
Speranza, M.G. |
|
1992 |
30-31 |
1-3 |
p. 229-236 8 p. |
artikel |
20 |
A design and application methodology for hierarchical production planning decision support systems in an enterprise integration context
|
Vicens, E |
|
2001 |
30-31 |
1-3 |
p. 5-20 16 p. |
artikel |
21 |
A DSS for capacity planning of aircraft maintenance personnel
|
Dijkstra, Matthijs C. |
|
1991 |
30-31 |
1-3 |
p. 69-78 10 p. |
artikel |
22 |
A dynamic game model for distribution problems with non-stochastic uncertainty
|
Blanchini, Franco |
|
1996 |
30-31 |
1-3 |
p. 479-487 9 p. |
artikel |
23 |
A dynamic model for the single-vendor, multi-buyer problem
|
Bylka, Stanisław |
|
1999 |
30-31 |
1-3 |
p. 297-304 8 p. |
artikel |
24 |
A financial portfolio approach to inventory behaviour: Japan and the UK
|
Corbett, Jenny |
|
1999 |
30-31 |
1-3 |
p. 43-52 10 p. |
artikel |
25 |
A framework for cost-service analysis in differentiation of logistics services
|
Pirttilä, Timo |
|
1996 |
30-31 |
1-3 |
p. 131-137 7 p. |
artikel |
26 |
A genetic approach to the scheduling of preventive maintenance tasks on a single product manufacturing production line
|
Cavory, G. |
|
2001 |
30-31 |
1-3 |
p. 135-146 12 p. |
artikel |
27 |
Aggregate dynamics of (S, s) inventory management
|
Allen, Donald S |
|
1999 |
30-31 |
1-3 |
p. 231-242 12 p. |
artikel |
28 |
A hierarchically structured decision-support-system for demand-oriented shift planning
|
Faiβt, J. |
|
1991 |
30-31 |
1-3 |
p. 89-98 10 p. |
artikel |
29 |
A joint replenishment policy for multi-echelon inventory control
|
Axsäter, Sven |
|
1999 |
30-31 |
1-3 |
p. 243-250 8 p. |
artikel |
30 |
A managerial perspective on aggregate planning
|
Buxey, Geoff |
|
1995 |
30-31 |
1-3 |
p. 127-133 7 p. |
artikel |
31 |
A market game with the characteristic function according to the MRP and input–output analysis model
|
Horvat, Liljana |
|
1999 |
30-31 |
1-3 |
p. 281-288 8 p. |
artikel |
32 |
A method for the design of flexible assembly systems
|
Bellgran, Monica |
|
1995 |
30-31 |
1-3 |
p. 93-102 10 p. |
artikel |
33 |
A method of flexible scheduling for flexible manufacturing systems
|
Choi, Junghee |
|
1994 |
30-31 |
1-3 |
p. 247-255 9 p. |
artikel |
34 |
A methodology for the vulnerability analysis of just-in-time production systems
|
Albino, V. |
|
1995 |
30-31 |
1-3 |
p. 71-80 10 p. |
artikel |
35 |
A multi-country analysis of aggregate inventory behavior
|
Chikán, Attila |
|
1999 |
30-31 |
1-3 |
p. 1-11 11 p. |
artikel |
36 |
A multicriteria framework for inventory control
|
Agrell, Per J. |
|
1995 |
30-31 |
1-3 |
p. 59-70 12 p. |
artikel |
37 |
A multiple-criteria approach to machine selection for flexible manufacturing systems
|
Myint, San |
|
1994 |
30-31 |
1-3 |
p. 121-131 11 p. |
artikel |
38 |
An adaptive dynamic model of production and inventories
|
Ghali, Moheb A. |
|
1999 |
30-31 |
1-3 |
p. 13-22 10 p. |
artikel |
39 |
Analysis and integration of optimization models for logistic systems
|
Speranza, Maria Grazia |
|
1994 |
30-31 |
1-3 |
p. 183-190 8 p. |
artikel |
40 |
Analysis of an inventory system under backorder correlated deterministic demand and geometric supply process
|
Argon, Nilay Tanık |
|
2001 |
30-31 |
1-3 |
p. 247-254 8 p. |
artikel |
41 |
Analysis of an inventory system under supply uncertainty
|
Güllü, Refik |
|
1999 |
30-31 |
1-3 |
p. 377-385 9 p. |
artikel |
42 |
Analysis of assembly systems with service level constraints
|
de Kok, Ton G. |
|
1999 |
30-31 |
1-3 |
p. 313-326 14 p. |
artikel |
43 |
Analysis of the EOQ repair and waste disposal problem with integer setup numbers
|
Richter, Knut |
|
1999 |
30-31 |
1-3 |
p. 463-467 5 p. |
artikel |
44 |
An analytic approach to supply chain development
|
Korpela, Jukka |
|
2001 |
30-31 |
1-3 |
p. 145-155 11 p. |
artikel |
45 |
An application of the multi-stage Monte Carlo optimization algorithm to aggregate production planning
|
Bakir, M.A. |
|
1994 |
30-31 |
1-3 |
p. 207-213 7 p. |
artikel |
46 |
An economical resetting model in continuous review
|
Beyer, Dirk |
|
1994 |
30-31 |
1-3 |
p. 223-231 9 p. |
artikel |
47 |
An economic batch production quantity model with learning curve-dependent effects: a technical note
|
Shiue, Yih-Chearng |
|
1991 |
30-31 |
1-3 |
p. 35-38 4 p. |
artikel |
48 |
An economic manufacturing quantity model with learning effects
|
Cheng, T.C.E. |
|
1994 |
30-31 |
1-3 |
p. 257-264 8 p. |
artikel |
49 |
A net present value approach to safety stocks in a multi-level MRP system
|
Grubbström, Robert W. |
|
1999 |
30-31 |
1-3 |
p. 361-375 15 p. |
artikel |
50 |
A network approach to operate agile manufacturing systems
|
Frayret, Jean-Marc |
|
2001 |
30-31 |
1-3 |
p. 239-259 21 p. |
artikel |
51 |
A new heuristic based on a hypergraph representation for the tool switching problem
|
Djellab, Housni |
|
2000 |
30-31 |
1-3 |
p. 165-176 12 p. |
artikel |
52 |
An exact method for cost-oriented assembly line balancing
|
Amen, Matthias |
|
2000 |
30-31 |
1-3 |
p. 187-195 9 p. |
artikel |
53 |
An expert system for choosing demand forecasting techniques
|
Lo, Tammy |
|
1994 |
30-31 |
1-3 |
p. 5-15 11 p. |
artikel |
54 |
An information system for building production management
|
Ameziane, Farid |
|
2000 |
30-31 |
1-3 |
p. 345-358 14 p. |
artikel |
55 |
An integrated modelling approach for complex applications and distributed information systems
|
Gargouri, Faı̈ez |
|
2000 |
30-31 |
1-3 |
p. 331-344 14 p. |
artikel |
56 |
An integrated production-inventory-distribution model for manufacture of urea: a case
|
Haq, A. Noorul |
|
1991 |
30-31 |
1-3 |
p. 39-49 11 p. |
artikel |
57 |
An integrated production planning and scheduling system for hybrid flowshop organizations
|
Riane, F. |
|
2001 |
30-31 |
1-3 |
p. 33-48 16 p. |
artikel |
58 |
An integration approach to process design and parts-layout planning
|
Ohashi, Kazumasa |
|
1994 |
30-31 |
1-3 |
p. 237-245 9 p. |
artikel |
59 |
An inventory management model for an inventory consisting of lumpy items, slow movers and fast movers
|
Vereecke, Ann |
|
1994 |
30-31 |
1-3 |
p. 379-389 11 p. |
artikel |
60 |
An LP-based approach for loading and routing in a flexible assembly line
|
Sawik, Tadeusz |
|
2000 |
30-31 |
1-3 |
p. 49-58 10 p. |
artikel |
61 |
An MCDM framework for dynamic systems
|
Agrell, Per J |
|
1996 |
30-31 |
1-3 |
p. 279-292 14 p. |
artikel |
62 |
An optimal operation planning for the fixed quantity withdrawal Kanban system with variable leadtimes
|
Yanagawa, Yoshinari |
|
1994 |
30-31 |
1-3 |
p. 163-168 6 p. |
artikel |
63 |
An overview of the state and problems of inventory management in Finland
|
Pirttilä, Timo |
|
1992 |
30-31 |
1-3 |
p. 217-220 4 p. |
artikel |
64 |
A Petri net model and a general method for on and off-line multi-resource shop floor scheduling with setup times
|
Artigues, Christian |
|
2001 |
30-31 |
1-3 |
p. 63-75 13 p. |
artikel |
65 |
Application of calculus of variations to a continuous time aggregate production model
|
Molinder, Anders |
|
1995 |
30-31 |
1-3 |
p. 273-280 8 p. |
artikel |
66 |
Approximating general multi-echelon inventory systems by Poisson models
|
Axsäter, Sven |
|
1994 |
30-31 |
1-3 |
p. 201-206 6 p. |
artikel |
67 |
A preliminary model for lot sizing in semiconductor manufacturing
|
Carmon, Tali F. |
|
1994 |
30-31 |
1-3 |
p. 259-264 6 p. |
artikel |
68 |
A production scheduling system in a hybrid flow shop
|
Uetake, Toshifumi |
|
1995 |
30-31 |
1-3 |
p. 395-398 4 p. |
artikel |
69 |
A proposed model of JIT purchasing in an integrated steel plant
|
Roy, R.N. |
|
1999 |
30-31 |
1-3 |
p. 179-187 9 p. |
artikel |
70 |
Are push and pull systems really so different?
|
Bonney, M.C |
|
1999 |
30-31 |
1-3 |
p. 53-64 12 p. |
artikel |
71 |
A robust optimization model for stochastic logistic problems
|
Yu, Chian-Son |
|
2000 |
30-31 |
1-3 |
p. 385-397 13 p. |
artikel |
72 |
A routing algorithm for a single straddle carrier to load export containers onto a containership
|
Young Kim, Ki |
|
1999 |
30-31 |
1-3 |
p. 425-433 9 p. |
artikel |
73 |
A simulation-based method to aid the improvement of manufacturing flexibility
|
Byrne, M.D. |
|
1992 |
30-31 |
1-3 |
p. 153-159 7 p. |
artikel |
74 |
A simulation framework for forecasting uncertain lumpy demand
|
Bartezzaghi, Emilio |
|
1999 |
30-31 |
1-3 |
p. 499-510 12 p. |
artikel |
75 |
A simulation model for container-terminal operation analysis using an object-oriented approach
|
Yun, Won Young |
|
1999 |
30-31 |
1-3 |
p. 221-230 10 p. |
artikel |
76 |
A simulation study of bottleneck scheduling
|
Neely, A.D. |
|
1992 |
30-31 |
1-3 |
p. 187-192 6 p. |
artikel |
77 |
A simulation study of unit exchange spares management of diesel locomotives in the Indian railways
|
Kumar, Narendra |
|
1994 |
30-31 |
1-3 |
p. 225-236 12 p. |
artikel |
78 |
Asset-selling problems with holding costs
|
David, Israel |
|
2001 |
30-31 |
1-3 |
p. 317-321 5 p. |
artikel |
79 |
A step-wise method for product range management and production control decisions: A case study at a board industry company
|
Pirttilä, Timo |
|
1996 |
30-31 |
1-3 |
p. 223-230 8 p. |
artikel |
80 |
A stochastic inventory problem with piecewise quadratic costs
|
Parlar, Mahmut |
|
1992 |
30-31 |
1-3 |
p. 327-332 6 p. |
artikel |
81 |
A stochastic model for forecast consumption in master scheduling
|
Weeda, P.J. |
|
1994 |
30-31 |
1-3 |
p. 401-404 4 p. |
artikel |
82 |
A study of bottlenecks in a MRP environment using simulation
|
Byrne, M.D. |
|
1994 |
30-31 |
1-3 |
p. 115-120 6 p. |
artikel |
83 |
A study of heuristics for bidirectional multi-hoist production scheduling systems
|
Sun, T.C. |
|
1994 |
30-31 |
1-3 |
p. 207-214 8 p. |
artikel |
84 |
A study of inventories in Finnish manufacturing industry
|
Leinonen, Jouko |
|
1994 |
30-31 |
1-3 |
p. 29-32 4 p. |
artikel |
85 |
A study on the design of CNC lathe for education and application
|
Kim, Jeong-Du |
|
1991 |
30-31 |
1-3 |
p. 169-180 12 p. |
artikel |
86 |
A test of the linear rational expectations equilibrium inventory model in the EEC
|
Dimelis, Sophia P. |
|
1992 |
30-31 |
1-3 |
p. 25-32 8 p. |
artikel |
87 |
A two-phase heuristic approach to the permutation flow-shop scheduling problem
|
Suliman, S.M.A. |
|
2000 |
30-31 |
1-3 |
p. 143-152 10 p. |
artikel |
88 |
A two-supplier inventory model
|
Janssen, Fred |
|
1999 |
30-31 |
1-3 |
p. 395-403 9 p. |
artikel |
89 |
A two-tier hierarchical scheduler for the micro-electronic industry
|
Dar-El, Ezey M. |
|
1991 |
30-31 |
1-3 |
p. 81-87 7 p. |
artikel |
90 |
Author index
|
|
|
2001 |
30-31 |
1-3 |
p. 315-316 2 p. |
artikel |
91 |
Author index
|
|
|
1992 |
30-31 |
1-3 |
p. 374- 1 p. |
artikel |
92 |
Author index
|
|
|
1991 |
30-31 |
1-3 |
p. 231-231 1 p. |
artikel |
93 |
Author index to volume 41
|
|
|
1995 |
30-31 |
1-3 |
p. 441-443 3 p. |
artikel |
94 |
Author Index to Volume 71
|
|
|
2001 |
30-31 |
1-3 |
p. 477-479 3 p. |
artikel |
95 |
Author index to volume 45
|
|
|
1996 |
30-31 |
1-3 |
p. 509-511 3 p. |
artikel |
96 |
Author index to volume 35
|
|
|
1994 |
30-31 |
1-3 |
p. 411-413 3 p. |
artikel |
97 |
Author index to volume 33
|
|
|
1994 |
30-31 |
1-3 |
p. 275-276 2 p. |
artikel |
98 |
Automatic notation of the physical structure of a flexible manufacturing system
|
Tacquard, Claudine |
|
2001 |
30-31 |
1-3 |
p. 279-292 14 p. |
artikel |
99 |
Average cost estimation of lot-sizing heuristics
|
Richter, Knut |
|
1992 |
30-31 |
1-3 |
p. 341-345 5 p. |
artikel |
100 |
A visually interactive expert system for a distribution center environment
|
Carlson, John G |
|
1996 |
30-31 |
1-3 |
p. 101-109 9 p. |
artikel |
101 |
Bar-code technology for inventory and marketing management systems: A model for its development and implementation
|
Manthou, Vassiliki |
|
2001 |
30-31 |
1-3 |
p. 157-164 8 p. |
artikel |
102 |
Batching policies for a product life cycle
|
Hill, Roger M |
|
1996 |
30-31 |
1-3 |
p. 421-427 7 p. |
artikel |
103 |
Batch-model assembly line balancing: A multiattribute decision making approach
|
Kabir, Md.Alamgir |
|
1995 |
30-31 |
1-3 |
p. 193-201 9 p. |
artikel |
104 |
Batch-scheduling problems to minimize inventory cost in the shop with both receiving and delivery just-in-times
|
Hakim Halim, Abdul |
|
1994 |
30-31 |
1-3 |
p. 185-194 10 p. |
artikel |
105 |
Bicriteria scheduling problem involving total tardiness and total earliness penalties
|
Azizoǧlu, Meral |
|
1991 |
30-31 |
1-3 |
p. 17-24 8 p. |
artikel |
106 |
Bicriterion scheduling problem in a job shop with parallel processors
|
Cenna, Ahmed Abu |
|
1991 |
30-31 |
1-3 |
p. 95-101 7 p. |
artikel |
107 |
Buffer allocation and required availability in a transfer line with unreliable machines
|
Sörensen, Kenneth |
|
2001 |
30-31 |
1-3 |
p. 163-173 11 p. |
artikel |
108 |
Buying behavior and product planning
|
Leinsdorff, Torben |
|
1995 |
30-31 |
1-3 |
p. 237-239 3 p. |
artikel |
109 |
Can inventory chaos be welfare improving
|
Matsumoto, Akio |
|
2001 |
30-31 |
1-3 |
p. 31-43 13 p. |
artikel |
110 |
Capital structure and inventory management:
|
Luciano, Elisa |
|
1999 |
30-31 |
1-3 |
p. 169-178 10 p. |
artikel |
111 |
Case study of productivity and quality aspects in production technology transfer to China
|
Bruun, Peter |
|
1995 |
30-31 |
1-3 |
p. 109-114 6 p. |
artikel |
112 |
Cell formation using evolutionary algorithms with certain constraints
|
Plaquin, Marie-France |
|
2000 |
30-31 |
1-3 |
p. 267-278 12 p. |
artikel |
113 |
Cell formation with alternative process plans and machine capacity constraints: A new combined approach
|
Caux, C. |
|
2000 |
30-31 |
1-3 |
p. 279-284 6 p. |
artikel |
114 |
Changes in Hungarian manufacturing strategies
|
Demeter, Krisztina |
|
1994 |
30-31 |
1-3 |
p. 131-136 6 p. |
artikel |
115 |
Changing the givens in modelling inventory problems: the example of just-in-time systems
|
Silver, Edward A. |
|
1992 |
30-31 |
1-3 |
p. 347-351 5 p. |
artikel |
116 |
CIM networking: promise and problems
|
Snyder, Charles A. |
|
1991 |
30-31 |
1-3 |
p. 205-212 8 p. |
artikel |
117 |
Classical and variance bounds tests of the production smoothing hypothesis
|
Dimelis, Sophia P. |
|
1994 |
30-31 |
1-3 |
p. 15-22 8 p. |
artikel |
118 |
Combinatorial optimization of the location—inventory problem
|
Bogataj, Marija |
|
1992 |
30-31 |
1-3 |
p. 273-276 4 p. |
artikel |
119 |
Common order cycle system for multi-item inventory model with learning in ordering and transportation
|
Ogawa, Sanae |
|
1995 |
30-31 |
1-3 |
p. 321-325 5 p. |
artikel |
120 |
Comparison of echelon stock and installation stock policies for two-level inventory systems
|
Axsäter, Sven |
|
1996 |
30-31 |
1-3 |
p. 303-310 8 p. |
artikel |
121 |
Complexity index as a base for decision making whether to introduce NC or conventional machines
|
Ramani, S. |
|
1991 |
30-31 |
1-3 |
p. 187-196 10 p. |
artikel |
122 |
Computational procedures for stochastic multi-echelon production systems
|
van Houtum, G.J. |
|
1991 |
30-31 |
1-3 |
p. 223-237 15 p. |
artikel |
123 |
Computational results for the control of a divergent N-echelon inventory system
|
Diks, E.B. |
|
1999 |
30-31 |
1-3 |
p. 327-336 10 p. |
artikel |
124 |
Computerised materials requirement planning in manufacturing companies in Malaysia
|
Hamid, Aziz A. |
|
1991 |
30-31 |
1-3 |
p. 73-79 7 p. |
artikel |
125 |
Concepts and applications of inventory management in Northern Greece
|
Manthou, V. |
|
1994 |
30-31 |
1-3 |
p. 149-152 4 p. |
artikel |
126 |
Concepts, practices and expectations of MRP, JIT and OPT in Finland and Japan
|
Matsuura, Haruki |
|
1995 |
30-31 |
1-3 |
p. 267-272 6 p. |
artikel |
127 |
Conditional production smoothing in the United Kingdom and Japan
|
Ginama, Isamu |
|
1999 |
30-31 |
1-3 |
p. 23-32 10 p. |
artikel |
128 |
Conditional volatility and the production smoothing hypothesis of inventory investment
|
Ginama, Isamu |
|
1996 |
30-31 |
1-3 |
p. 29-36 8 p. |
artikel |
129 |
Contents
|
|
|
2001 |
30-31 |
1-3 |
p. viii-x nvt p. |
artikel |
130 |
Contents of this Volume
|
|
|
2001 |
30-31 |
1-3 |
p. 317-318 2 p. |
artikel |
131 |
Contents volume 41
|
|
|
1995 |
30-31 |
1-3 |
p. 445-446 2 p. |
artikel |
132 |
Contents Volume 71
|
|
|
2001 |
30-31 |
1-3 |
p. 481-483 3 p. |
artikel |
133 |
Continuous review inventory control when capacity is variable
|
Wang, Yunzeng |
|
1996 |
30-31 |
1-3 |
p. 381-388 8 p. |
artikel |
134 |
Continuous review lost sales inventory models where two orders may be outstanding
|
Hill, Roger M. |
|
1994 |
30-31 |
1-3 |
p. 313-319 7 p. |
artikel |
135 |
Contribution of aggregate and sectoral shocks to the dynamics of inventories:
|
Ben Salem, Mélika |
|
1999 |
30-31 |
1-3 |
p. 33-42 10 p. |
artikel |
136 |
Controlled partial shipments in two-echelon supply chain networks: a simulation study
|
Banerjee, Snehamay |
|
2001 |
30-31 |
1-3 |
p. 91-100 10 p. |
artikel |
137 |
Controlled stochastic processes and inventories
|
Girlich, Hans-Joachim |
|
1992 |
30-31 |
1-3 |
p. 299-302 4 p. |
artikel |
138 |
Controlling a divergent 2-echelon network with transshipments using the consistent appropriate share rationing policy
|
Diks, E.B |
|
1996 |
30-31 |
1-3 |
p. 369-379 11 p. |
artikel |
139 |
Controlling different flow rates in job-shop like production departments
|
van Ooijen, H.P.G. |
|
1991 |
30-31 |
1-3 |
p. 239-249 11 p. |
artikel |
140 |
Conveyor scheduling system for a feeds manufacturing plant: a case study
|
del Rosario, Elise A. |
|
1991 |
30-31 |
1-3 |
p. 89-94 6 p. |
artikel |
141 |
Co-operative production planning for small- and medium-sized enterprises
|
Mezgár, István |
|
2000 |
30-31 |
1-3 |
p. 37-48 12 p. |
artikel |
142 |
Coordinated vs. independent inventory replenishment policies for a vendor and multiple buyers
|
Banerjee, Avijit |
|
1994 |
30-31 |
1-3 |
p. 215-222 8 p. |
artikel |
143 |
Corporate strategy and culture in a conversion process: Adjustment in defence industry
|
Nironen, Erkki |
|
1995 |
30-31 |
1-3 |
p. 297-301 5 p. |
artikel |
144 |
Costs and benefits of investment in electronic design
|
Chiplin, B. |
|
1991 |
30-31 |
1-3 |
p. 37-45 9 p. |
artikel |
145 |
Cover-Time Planning, a method for calculation of material requirements
|
Segerstedt, Anders |
|
1995 |
30-31 |
1-3 |
p. 355-368 14 p. |
artikel |
146 |
Criticality analysis of spare parts using the analytic hierarchy process
|
Gajpal, Prem Prakash |
|
1994 |
30-31 |
1-3 |
p. 293-297 5 p. |
artikel |
147 |
Customer focused lean production development
|
Kosonen, K. |
|
1995 |
30-31 |
1-3 |
p. 211-216 6 p. |
artikel |
148 |
Customer order lead times for production based on lead time and tardiness costs
|
Bertrand, J.W.M. |
|
2000 |
30-31 |
1-3 |
p. 257-265 9 p. |
artikel |
149 |
Cycle time models for single/double carousel system
|
Hwang, Hark |
|
1991 |
30-31 |
1-3 |
p. 129-140 12 p. |
artikel |
150 |
Decision criteria in capital budgeting under uncertainties: implications for future research
|
Chansa-ngavej, Chuvej |
|
1991 |
30-31 |
1-3 |
p. 25-35 11 p. |
artikel |
151 |
Deriving advantages from advanced manufacturing technology — an organizing paradigm
|
Chung, K.B. |
|
1991 |
30-31 |
1-3 |
p. 13-21 9 p. |
artikel |
152 |
Design and operational control of an AGV system
|
Mantel, Ronald J. |
|
1995 |
30-31 |
1-3 |
p. 257-266 10 p. |
artikel |
153 |
Design and performance of kitting and order picking systems
|
Brynzér, H. |
|
1995 |
30-31 |
1-3 |
p. 115-125 11 p. |
artikel |
154 |
Design for automated assembly of circular parts: An algorithm
|
Abdel-Malek, Layek L. |
|
1995 |
30-31 |
1-3 |
p. 45-50 6 p. |
artikel |
155 |
Designing customer oriented production planning system (COPPS)
|
Tamura, Takayoshi |
|
1995 |
30-31 |
1-3 |
p. 377-385 9 p. |
artikel |
156 |
Designing of a components-oriented ordering system
|
Hiraki, Shusaku |
|
1994 |
30-31 |
1-3 |
p. 143-153 11 p. |
artikel |
157 |
Design maturity assessment for concurrent engineering co-ordination
|
O'Brien, C |
|
1995 |
30-31 |
1-3 |
p. 311-320 10 p. |
artikel |
158 |
Design of a decision support system for overseas plant location in the EC
|
Yurimoto, Shigeru |
|
1995 |
30-31 |
1-3 |
p. 411-418 8 p. |
artikel |
159 |
Deteriorating inventory model with quantity discount, pricing and partial backordering
|
Wee, Hui-Ming |
|
1999 |
30-31 |
1-3 |
p. 511-518 8 p. |
artikel |
160 |
Determining locations of stock points from a multi-criteria decision problem
|
Deweß, Günter |
|
1999 |
30-31 |
1-3 |
p. 355-359 5 p. |
artikel |
161 |
Determining the size and location of suppliers for a minimum total distribution route problem
|
Kalfakakou, Ria |
|
2001 |
30-31 |
1-3 |
p. 401-405 5 p. |
artikel |
162 |
Developing manufacturing management strategies: Influence of technology and other issues
|
Banerjee, S.K |
|
2000 |
30-31 |
1-3 |
p. 79-90 12 p. |
artikel |
163 |
Diary of events
|
|
|
1994 |
30-31 |
1-3 |
p. 407-409 3 p. |
artikel |
164 |
Diary of events
|
|
|
1995 |
30-31 |
1-3 |
p. 437-440 4 p. |
artikel |
165 |
Diary of Events
|
|
|
2001 |
30-31 |
1-3 |
p. 313-314 2 p. |
artikel |
166 |
Diary of Events
|
|
|
2001 |
30-31 |
1-3 |
p. 473-475 3 p. |
artikel |
167 |
Diary of events
|
|
|
1996 |
30-31 |
1-3 |
p. 505-507 3 p. |
artikel |
168 |
Diary of events
|
|
|
1994 |
30-31 |
1-3 |
p. 271-274 4 p. |
artikel |
169 |
Direct tests of the hypothesis that expectations are rational
|
Irvine, F.Owen |
|
1992 |
30-31 |
1-3 |
p. 49-59 11 p. |
artikel |
170 |
Discrete frequency models for inventory management – an introduction
|
Favaretto, Daniela |
|
2001 |
30-31 |
1-3 |
p. 331-342 12 p. |
artikel |
171 |
Disposal of excess stock at the end of a project when facing on-going operational usage
|
Silver, Edward A. |
|
1999 |
30-31 |
1-3 |
p. 189-194 6 p. |
artikel |
172 |
Does levelling lead to shortages? An empirical test
|
Ábel, I. |
|
1992 |
30-31 |
1-3 |
p. 5-11 7 p. |
artikel |
173 |
Does the time shape of inventory data hold clues on inventory behaviour
|
Reinhardt, Paul |
|
1996 |
30-31 |
1-3 |
p. 77-81 5 p. |
artikel |
174 |
Due-date setting and production control
|
Dellaert, Nico P. |
|
1991 |
30-31 |
1-3 |
p. 59-67 9 p. |
artikel |
175 |
Economic design of a Vp X ̄ chart
|
De Magalhães, Maysa S. |
|
2001 |
30-31 |
1-3 |
p. 191-200 10 p. |
artikel |
176 |
Economic due-date setting in job-shops based on routing and workload dependent flow time distribution functions
|
van Ooijen, H.P.G. |
|
2001 |
30-31 |
1-3 |
p. 261-268 8 p. |
artikel |
177 |
Economic lot scheduling heuristic for random demands
|
Kelle, P. |
|
1994 |
30-31 |
1-3 |
p. 337-342 6 p. |
artikel |
178 |
Economic lot sizing with learning and continuous time discounting: Is it significant?
|
Jaber, Mohamad Y. |
|
2001 |
30-31 |
1-3 |
p. 135-143 9 p. |
artikel |
179 |
Economic production quantity model for items with imperfect quality
|
Salameh, M.K. |
|
2000 |
30-31 |
1-3 |
p. 59-64 6 p. |
artikel |
180 |
Editorial
|
|
|
2000 |
30-31 |
1-3 |
p. xi-xiii nvt p. |
artikel |
181 |
Editorial Board
|
|
|
1994 |
30-31 |
1-3 |
p. iii-vii nvt p. |
artikel |
182 |
Editorial Board
|
|
|
1995 |
30-31 |
1-3 |
p. CO2- 1 p. |
artikel |
183 |
Editorial Board
|
|
|
1996 |
30-31 |
1-3 |
p. i-iv nvt p. |
artikel |
184 |
Editorial Board
|
|
|
1991 |
30-31 |
1-3 |
p. iii-vi nvt p. |
artikel |
185 |
Editorial Board
|
|
|
1992 |
30-31 |
1-3 |
p. iii-vi nvt p. |
artikel |
186 |
Editorial Board
|
|
|
1994 |
30-31 |
1-3 |
p. v-vii nvt p. |
artikel |
187 |
Editorial Board
|
|
|
1991 |
30-31 |
1-3 |
p. IFC- 1 p. |
artikel |
188 |
Effect of errors and delays in inventory reporting on production system performance
|
Bonney, Maurice |
|
1994 |
30-31 |
1-3 |
p. 93-105 13 p. |
artikel |
189 |
Efficient purchasing in make-to-order supply chains
|
Jahnukainen, Jonni |
|
1999 |
30-31 |
1-3 |
p. 103-111 9 p. |
artikel |
190 |
Electricity from industrial waste heat using high-speed organic Rankine cycle (ORC)
|
Larjola, J. |
|
1995 |
30-31 |
1-3 |
p. 227-235 9 p. |
artikel |
191 |
Electronic data interchange and inventories
|
Anvari, Mohsen |
|
1992 |
30-31 |
1-3 |
p. 135-143 9 p. |
artikel |
192 |
Empirical estimation of three models of production and inventory behavior using monthly industry data
|
Ghali, Moheb A. |
|
1992 |
30-31 |
1-3 |
p. 43-48 6 p. |
artikel |
193 |
End-of-life service
|
Teunter, Ruud H. |
|
1999 |
30-31 |
1-3 |
p. 487-497 11 p. |
artikel |
194 |
EOQ formula when inventory cost is fuzzy
|
Vujošević, Mirko |
|
1996 |
30-31 |
1-3 |
p. 499-504 6 p. |
artikel |
195 |
Estimating inventory variance with the batch means method
|
Takahashi, Katsuhiko |
|
1991 |
30-31 |
1-3 |
p. 23-33 11 p. |
artikel |
196 |
Evaluating flexibility of alternative FMS designs — A comparative measure
|
Abdel-Malek, Layek |
|
1991 |
30-31 |
1-3 |
p. 3-10 8 p. |
artikel |
197 |
Evaluation of forecast models used for inventory control during a product's life cycle: A simulation study
|
Alstrøm, Poul |
|
1994 |
30-31 |
1-3 |
p. 191-200 10 p. |
artikel |
198 |
Exact distribution of the makespan in a two machines flow shop with two kinds of jobs
|
Baptiste, Pierre |
|
2001 |
30-31 |
1-3 |
p. 77-83 7 p. |
artikel |
199 |
Experiences with a concurrent engineering self-assessment tool
|
Landeghem, Rik Van |
|
2000 |
30-31 |
1-3 |
p. 295-309 15 p. |
artikel |
200 |
Expert system for AGV managing in bidirectional networks: KADS methodology based approach
|
Dhouib, Karem |
|
1994 |
30-31 |
1-3 |
p. 31-43 13 p. |
artikel |
201 |
Extension of a reliability-type inventory model to just-in-time systems
|
Kelle, Peter |
|
1992 |
30-31 |
1-3 |
p. 319-326 8 p. |
artikel |
202 |
Facilities layout: A knowledge-based approach for converting a dual graph into a block layout
|
Welgama, P.S. |
|
1994 |
30-31 |
1-3 |
p. 17-30 14 p. |
artikel |
203 |
Financing constraints and reordering rules
|
Milne, Alistair |
|
1996 |
30-31 |
1-3 |
p. 65-75 11 p. |
artikel |
204 |
Flexible part-feeding system for machine loading and assembly. Part I. A state-of-the-art survey
|
Lee, Kok-Meng |
|
1991 |
30-31 |
1-3 |
p. 141-153 13 p. |
artikel |
205 |
Flexible part-feeding system for machine loading and assembly. Part II. A cost-effective solution
|
Lee, Kok-Meng |
|
1991 |
30-31 |
1-3 |
p. 155-168 14 p. |
artikel |
206 |
Flow simulation and genetic algorithm as optimization tools
|
Fontanili, F. |
|
2000 |
30-31 |
1-3 |
p. 91-100 10 p. |
artikel |
207 |
Food inventory policies under liberalized trade
|
Jha, Shikha |
|
2001 |
30-31 |
1-3 |
p. 21-29 9 p. |
artikel |
208 |
Foreword
|
Chikán, Attila |
|
1992 |
30-31 |
1-3 |
p. 1- 1 p. |
artikel |
209 |
Forming the material supply structure through the choice of the production cooperation range
|
Sygit, Maciej |
|
1992 |
30-31 |
1-3 |
p. 237-241 5 p. |
artikel |
210 |
Further theoretical considerations on the relationship between MRP, input-output analysis and multi-echelon inventory systems
|
Grubbström, Robert W |
|
1994 |
30-31 |
1-3 |
p. 299-311 13 p. |
artikel |
211 |
Future production systems: Influence of self-organization on approaches to quality engineering
|
Massotte, Pierre |
|
2000 |
30-31 |
1-3 |
p. 359-377 19 p. |
artikel |
212 |
Fuzzy models for the newsboy problem
|
Petrović, Dobrila |
|
1996 |
30-31 |
1-3 |
p. 435-441 7 p. |
artikel |
213 |
Generalized inspection strategy for randomly failing systems subjected to random shocks
|
Chelbi, Anis |
|
2000 |
30-31 |
1-3 |
p. 379-384 6 p. |
artikel |
214 |
Generic bill-of-material: a new product model
|
Hegge, H.M.H. |
|
1991 |
30-31 |
1-3 |
p. 117-128 12 p. |
artikel |
215 |
Generic organizational choices for logistics in decentralized organizations Implications for inventory management
|
Pirttilä, Timo |
|
1996 |
30-31 |
1-3 |
p. 195-202 8 p. |
artikel |
216 |
Genetic algorithm for assembly line balancing
|
Rubinovitz, J. |
|
1995 |
30-31 |
1-3 |
p. 343-354 12 p. |
artikel |
217 |
Genetic neuro-scheduler: A new approach for job shop scheduling
|
Dagli, C.H. |
|
1995 |
30-31 |
1-3 |
p. 135-145 11 p. |
artikel |
218 |
Geographic information systems in warehouse site selection decisions
|
Vlachopoulou, Maro |
|
2001 |
30-31 |
1-3 |
p. 205-212 8 p. |
artikel |
219 |
Grain stocking and storing in Benue State: An appraisal of the Federal Government of Nigeria's food grain storage policy
|
Chinedu Umeh, J |
|
1996 |
30-31 |
1-3 |
p. 261-270 10 p. |
artikel |
220 |
Group technology concepts as applied to flexible manufacturing systems
|
Radharamanan, R. |
|
1994 |
30-31 |
1-3 |
p. 133-142 10 p. |
artikel |
221 |
Has inventory management in the US become more efficient and flexible? A macroeconomic perspective
|
Hirsch, Albert A |
|
1996 |
30-31 |
1-3 |
p. 37-46 10 p. |
artikel |
222 |
Heavy-traffic inventory—production systems
|
Bulinskaya, E.V. |
|
1992 |
30-31 |
1-3 |
p. 283-291 9 p. |
artikel |
223 |
Heuristic production triggering mechanisms under discrete unequal inventory withdrawals
|
Banerjee, Avijit |
|
1996 |
30-31 |
1-3 |
p. 83-90 8 p. |
artikel |
224 |
Hierarchical production planning and multi-echelon inventory management
|
Zijm, W.H.M. |
|
1992 |
30-31 |
1-3 |
p. 257-264 8 p. |
artikel |
225 |
Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness
|
Botta-Genoulaz, Valérie |
|
2000 |
30-31 |
1-3 |
p. 101-111 11 p. |
artikel |
226 |
Hypergame analysis of the stability of relationships between computerbased logistics systems
|
Graham, Ian |
|
1992 |
30-31 |
1-3 |
p. 303-310 8 p. |
artikel |
227 |
Identifying the firm's characteristics affecting the choice of inventory valuation methods
|
Arcelus, F.J. |
|
1991 |
30-31 |
1-3 |
p. 11-16 6 p. |
artikel |
228 |
Import related inventory management in Indian economy
|
Prasad, K.N |
|
1996 |
30-31 |
1-3 |
p. 215-222 8 p. |
artikel |
229 |
Incremental order quantity for the case of very lumpy demand
|
Yilmaz, Cengiz |
|
1992 |
30-31 |
1-3 |
p. 367-371 5 p. |
artikel |
230 |
Index
|
|
|
2000 |
30-31 |
1-3 |
p. 419-421 3 p. |
artikel |
231 |
Indicators for measuring performances of morphology and material handling systems in flexible manufacturing systems
|
Devise, Olivier |
|
2000 |
30-31 |
1-3 |
p. 209-218 10 p. |
artikel |
232 |
Information systems design requirements for inventory management: A conceptual approach
|
Manthou, Vassiliki |
|
1996 |
30-31 |
1-3 |
p. 181-186 6 p. |
artikel |
233 |
Initial order quantities in multistage serial production systems
|
Ding, Huiping |
|
1994 |
30-31 |
1-3 |
p. 277-284 8 p. |
artikel |
234 |
Innovative production structures — Precondition for a customer-orientated production management
|
Bullinger, Hans-Jörg |
|
1995 |
30-31 |
1-3 |
p. 15-22 8 p. |
artikel |
235 |
Integrated decision modelling of supply chain efficiency
|
Li, Dong |
|
1999 |
30-31 |
1-3 |
p. 147-157 11 p. |
artikel |
236 |
Integrated scheduling, assembly area- and part-assignment for large-scale, make-to-order assemblies
|
Kolisch, R. |
|
2000 |
30-31 |
1-3 |
p. 127-141 15 p. |
artikel |
237 |
Integrating computer aided quality assurance in flexible engineering and production processes
|
Innala, M. |
|
1995 |
30-31 |
1-3 |
p. 179-184 6 p. |
artikel |
238 |
Intertemporal generalization of the relationship between material requirements planning and input-output analysis
|
Grubbström, Robert W. |
|
1992 |
30-31 |
1-3 |
p. 311-318 8 p. |
artikel |
239 |
Inventories and customer service in Polish manufacturing companies
|
Kisperska-Moron, Danuta |
|
1996 |
30-31 |
1-3 |
p. 147-157 11 p. |
artikel |
240 |
Inventories cycle in an augmented RBC model
|
Collard, Fabrice |
|
1996 |
30-31 |
1-3 |
p. 9-19 11 p. |
artikel |
241 |
Inventories, financial structure and market structure
|
Tribó, Josep A. |
|
2001 |
30-31 |
1-3 |
p. 79-89 11 p. |
artikel |
242 |
Inventories in macroeconomic fluctuations: the stylized facts
|
Sebold-Bender, Monika |
|
1992 |
30-31 |
1-3 |
p. 107-114 8 p. |
artikel |
243 |
Inventories in spatial models
|
Bogataj, Marija |
|
1996 |
30-31 |
1-3 |
p. 337-342 6 p. |
artikel |
244 |
Inventories in the economy in transition
|
Chikán, Attila |
|
1992 |
30-31 |
1-3 |
p. 19-23 5 p. |
artikel |
245 |
Inventory allocation and customer travelling problem in spatial duopoly
|
Bogataj, Marija |
|
1999 |
30-31 |
1-3 |
p. 271-279 9 p. |
artikel |
246 |
Inventory and capacity trade-offs in a manufacturing cell
|
Hurley, Simon F |
|
1999 |
30-31 |
1-3 |
p. 203-212 10 p. |
artikel |
247 |
Inventory and enterprise integration
|
Bonney, M.C |
|
1996 |
30-31 |
1-3 |
p. 91-99 9 p. |
artikel |
248 |
Inventory control on sequences of links with given transportation frequencies
|
Bertazzi, Luca |
|
1999 |
30-31 |
1-3 |
p. 261-270 10 p. |
artikel |
249 |
Inventory control with variation in lead times, especially when demand is intermittent
|
Segerstedt, Anders |
|
1994 |
30-31 |
1-3 |
p. 365-372 8 p. |
artikel |
250 |
Inventory forecasting with a multiple criteria decision tool
|
Korpela, Jukka |
|
1996 |
30-31 |
1-3 |
p. 159-168 10 p. |
artikel |
251 |
Inventory investment in Greek manufacturing industry: Effects from participation in the European market
|
Louri, Helen |
|
1996 |
30-31 |
1-3 |
p. 47-54 8 p. |
artikel |
252 |
Inventory investment over the business cycle in the EU and the US
|
Dimelis, Sophia P |
|
2001 |
30-31 |
1-3 |
p. 1-8 8 p. |
artikel |
253 |
Inventory model with two stocks
|
Bylka, S |
|
1996 |
30-31 |
1-3 |
p. 361-368 8 p. |
artikel |
254 |
Inventory policies for all-or-nothing demand processes
|
Hill, Roger M |
|
2001 |
30-31 |
1-3 |
p. 365-371 7 p. |
artikel |
255 |
Inventory theory: New perspectives for corporate management
|
Krautter, Jochen |
|
1999 |
30-31 |
1-3 |
p. 129-134 6 p. |
artikel |
256 |
Inventory trigger control policies developed in terms of control theory
|
Grubbström, Robert W |
|
1996 |
30-31 |
1-3 |
p. 397-406 10 p. |
artikel |
257 |
Investment policy for multiple product setup reduction under budgetary and capacity constraints
|
Banerjee, Avijit |
|
1996 |
30-31 |
1-3 |
p. 321-327 7 p. |
artikel |
258 |
Iterative determination and matching of part groups and machine cells: optimization and successive approximations
|
Stanfel, Larry E. |
|
1991 |
30-31 |
1-3 |
p. 213-222 10 p. |
artikel |
259 |
Japanese direct investment in Asia-Pacific and other regions: Empirical analysis using MITI survey data
|
Nakamura, Masao |
|
1991 |
30-31 |
1-3 |
p. 219-229 11 p. |
artikel |
260 |
Job shop scheduling with alternative process plans
|
Thomalla, Christoph S. |
|
2001 |
30-31 |
1-3 |
p. 125-134 10 p. |
artikel |
261 |
Joint micro and macro effects on inventories in transition economies
|
Chikán, Attila |
|
1994 |
30-31 |
1-3 |
p. 11-14 4 p. |
artikel |
262 |
Just-in-time purchasing:
|
Gunasekaran, A. |
|
1999 |
30-31 |
1-3 |
p. 77-84 8 p. |
artikel |
263 |
Just-in-time shipments in a truck-traffic-coordination system
|
Pleschberger, Thomas E. |
|
1994 |
30-31 |
1-3 |
p. 195-205 11 p. |
artikel |
264 |
Leadtime effects and policy improvement for stochastic inventory control with remanufacturing
|
Inderfurth, Karl |
|
2001 |
30-31 |
1-3 |
p. 381-390 10 p. |
artikel |
265 |
Lead-time variability in a homogeneous queueing model of batching
|
Kuik, Roelof |
|
1999 |
30-31 |
1-3 |
p. 435-441 7 p. |
artikel |
266 |
Lean production
|
Warnecke, H.J. |
|
1995 |
30-31 |
1-3 |
p. 37-43 7 p. |
artikel |
267 |
Linear model for Bulgarian inventory investment between 1962 and 1985
|
Chankova, Lilia |
|
1992 |
30-31 |
1-3 |
p. 13-18 6 p. |
artikel |
268 |
Linkages among manufacturing concepts, inventories, delivery service and competitiveness
|
Vastag, Gyula |
|
2001 |
30-31 |
1-3 |
p. 195-204 10 p. |
artikel |
269 |
List of referees
|
|
|
1992 |
30-31 |
1-3 |
p. 373- 1 p. |
artikel |
270 |
Loading problem and resource considerations in FMS: a review
|
Shanker, Kripa |
|
1991 |
30-31 |
1-3 |
p. 111-119 9 p. |
artikel |
271 |
Local search algorithms for flow shop scheduling with fuzzy due-dates
|
Ishibuchi, Hisao |
|
1994 |
30-31 |
1-3 |
p. 53-66 14 p. |
artikel |
272 |
Logistics change during the transition period in the Polish economy
|
Kisperska-Moron, Danuta |
|
1994 |
30-31 |
1-3 |
p. 23-28 6 p. |
artikel |
273 |
Lot sizes in a capacity constrained facility with available initial inventories
|
Segerstedt, Anders |
|
1999 |
30-31 |
1-3 |
p. 469-475 7 p. |
artikel |
274 |
Lot sizing and throughput times in a job shop
|
Häfner, Heinz |
|
1991 |
30-31 |
1-3 |
p. 111-116 6 p. |
artikel |
275 |
Lot sizing for varying degrees of demand uncertainty
|
Johansen, Søren Glud |
|
1999 |
30-31 |
1-3 |
p. 405-414 10 p. |
artikel |
276 |
Lot-sizing problem with setup times in labor-based capacity production systems
|
Aghezzaf, El-Houssaine |
|
2000 |
30-31 |
1-3 |
p. 1-9 9 p. |
artikel |
277 |
Low costs and carbon dioxide emissions through efficient power production methods in Finland
|
Tarjanne, R. |
|
1995 |
30-31 |
1-3 |
p. 387-394 8 p. |
artikel |
278 |
Macroeconomic analyses of inventories: learning from practice
|
Sprague, Linda G |
|
1996 |
30-31 |
1-3 |
p. 231-237 7 p. |
artikel |
279 |
Macroeconomic implications of S,s versus accelerator finished goods inventory strategies
|
Lovell, Michael C |
|
1996 |
30-31 |
1-3 |
p. 55-64 10 p. |
artikel |
280 |
Maintenance spare parts logistics: Special characteristics and strategic choices
|
Huiskonen, Janne |
|
2001 |
30-31 |
1-3 |
p. 125-133 9 p. |
artikel |
281 |
Managing innovative projects
|
Kiss, János |
|
1994 |
30-31 |
1-3 |
p. 405-406 2 p. |
artikel |
282 |
Managing inventories in the machine building industry:
|
Hałas, Elżbieta |
|
2001 |
30-31 |
1-3 |
p. 119-123 5 p. |
artikel |
283 |
Managing supply chain inventories: A multiple retailer, one warehouse, multiple supplier model 1 1 The author would like to thank Professor Jack Hayya of Penn State University, and two anonymous referee’s for their comments on earlier drafts of this paper.
|
Ganeshan, Ram |
|
1999 |
30-31 |
1-3 |
p. 341-354 14 p. |
artikel |
284 |
Manufacturing and operation management: Asia-Pacific orientation
|
Tabucanon, Mario T. |
|
1991 |
30-31 |
1-3 |
p. 1-4 4 p. |
artikel |
285 |
Manufacturing cells design with flexible routing capability in presence of unreliable machines
|
Diallo, Mohamadou |
|
2001 |
30-31 |
1-3 |
p. 175-182 8 p. |
artikel |
286 |
Manufacturing flexibility and real options: A review
|
Bengtsson, Jens |
|
2001 |
30-31 |
1-3 |
p. 213-224 12 p. |
artikel |
287 |
Manufacturing practices: differences that matter
|
Vastag, Gyula |
|
1991 |
30-31 |
1-3 |
p. 251-259 9 p. |
artikel |
288 |
Manufacturing strategy and capital budgeting process
|
Pirttilä, Timo |
|
1995 |
30-31 |
1-3 |
p. 335-341 7 p. |
artikel |
289 |
Maximizing benefits in short-term planning in bottle-glass industry
|
Richard, Pascal |
|
2000 |
30-31 |
1-3 |
p. 11-19 9 p. |
artikel |
290 |
Measurable economic consequences of investments in flexible capacity
|
Corbey, Michael |
|
1991 |
30-31 |
1-3 |
p. 47-57 11 p. |
artikel |
291 |
Measure of manufacturing performance in advanced manufacturing systems
|
de Ron, Ad J. |
|
1995 |
30-31 |
1-3 |
p. 147-160 14 p. |
artikel |
292 |
Measuring the performance of lot-sizing techniques in uncertain environments
|
Jeunet, Jully |
|
2000 |
30-31 |
1-3 |
p. 197-208 12 p. |
artikel |
293 |
Minimum cost allocation of supply centers with limitation on time delivery
|
Tsouros, C. |
|
1992 |
30-31 |
1-3 |
p. 353-358 6 p. |
artikel |
294 |
MIS investments for operations management; Relevant costs and revenues
|
Dirks, Paula |
|
1994 |
30-31 |
1-3 |
p. 137-148 12 p. |
artikel |
295 |
Mixed model assembly simulation
|
Carlson, John G. |
|
1992 |
30-31 |
1-3 |
p. 161-167 7 p. |
artikel |
296 |
Modeling and simulation of the control framework on a flexible manufacturing system
|
Gertosio, C |
|
2000 |
30-31 |
1-3 |
p. 285-293 9 p. |
artikel |
297 |
Modeling of inventory control with regenerative processes
|
Bázsa, E.M |
|
2001 |
30-31 |
1-3 |
p. 263-276 14 p. |
artikel |
298 |
Modelling production opportunities — an historical overview
|
Grubbström, Robert W. |
|
1995 |
30-31 |
1-3 |
p. 1-14 14 p. |
artikel |
299 |
Models for warehouse management: Classification and examples
|
Berg, J.P.van den |
|
1999 |
30-31 |
1-3 |
p. 519-528 10 p. |
artikel |
300 |
MRP: an adaptive approach
|
Al-Hakim, Latif A. |
|
1991 |
30-31 |
1-3 |
p. 65-72 8 p. |
artikel |
301 |
MRP with uncertainty: a review and some extensions
|
Murthy, D.N.P. |
|
1991 |
30-31 |
1-3 |
p. 51-64 14 p. |
artikel |
302 |
Multi-criteria models for capacity analysis and aggregate planning in manufacturing systems
|
Vercellis, C. |
|
1991 |
30-31 |
1-3 |
p. 261-272 12 p. |
artikel |
303 |
Multicriteria ranking of inventory replenishment policies in the presence of uncertainty in customer demand
|
Petrovic, Radivoj |
|
2001 |
30-31 |
1-3 |
p. 439-446 8 p. |
artikel |
304 |
Multi-echelon inventory theory — A retrospective
|
Clark, Andrew J. |
|
1994 |
30-31 |
1-3 |
p. 271-275 5 p. |
artikel |
305 |
Multi-item inventory systems with joint ordering and transportation decisions
|
Van Eijs, M.J.G. |
|
1994 |
30-31 |
1-3 |
p. 285-292 8 p. |
artikel |
306 |
Multi-level approaches to demand management in complex environments: an analytical model
|
Zotteri, Giulio |
|
2001 |
30-31 |
1-3 |
p. 221-233 13 p. |
artikel |
307 |
Multi-level control and asymptotic behaviour of some inventory systems
|
Bulinskaya, Ekaterina |
|
1999 |
30-31 |
1-3 |
p. 289-295 7 p. |
artikel |
308 |
Multiple batch structures in throughput scheduling
|
Weeda, P.J. |
|
1992 |
30-31 |
1-3 |
p. 359-366 8 p. |
artikel |
309 |
Multiple regimes in the US inventory time-series: A disaggregate analysis
|
Stern, Andrew |
|
2001 |
30-31 |
1-3 |
p. 45-53 9 p. |
artikel |
310 |
Multi-product inventory and auxiliary allocation problem
|
Bylka, Stanisław |
|
2001 |
30-31 |
1-3 |
p. 295-303 9 p. |
artikel |
311 |
Multiproduct lot sizing for finite production rate
|
Bylka, Stanisław |
|
2001 |
30-31 |
1-3 |
p. 305-315 11 p. |
artikel |
312 |
Multi-site planning: A transshipment problem
|
Guinet, Alain |
|
2001 |
30-31 |
1-3 |
p. 21-32 12 p. |
artikel |
313 |
Neural network approach for minimizing the makespan of the general job-shop
|
Satake, Tsuyoshi |
|
1994 |
30-31 |
1-3 |
p. 67-74 8 p. |
artikel |
314 |
[No title]
|
Chikán, Attila |
|
2001 |
30-31 |
1-3 |
p. xi- 1 p. |
artikel |
315 |
Numerical computation of inventory policies, based on the EOQ/σ x value for order-point systems
|
Alstrøm, Poul |
|
2001 |
30-31 |
1-3 |
p. 235-245 11 p. |
artikel |
316 |
Observation errors and inventory cycles
|
Reiter, Michael |
|
1992 |
30-31 |
1-3 |
p. 99-105 7 p. |
artikel |
317 |
On a forward algorithm for a generalized production inventory problem
|
Rempała, R. |
|
1999 |
30-31 |
1-3 |
p. 455-461 7 p. |
artikel |
318 |
On-farm storage structure inventory management: An economic appraisal of rhumbu
|
Umeh, J.Chinedu |
|
1994 |
30-31 |
1-3 |
p. 77-84 8 p. |
artikel |
319 |
On multi-stage production/inventory systems under stochastic demand
|
Zijm, Henk |
|
1994 |
30-31 |
1-3 |
p. 391-400 10 p. |
artikel |
320 |
On optimal strategies in inventory systems with Wiener demand process
|
Girlich, Hans-Joachim |
|
1991 |
30-31 |
1-3 |
p. 105-110 6 p. |
artikel |
321 |
On queueing models for some multi-location problems
|
Köchel, Peter |
|
1996 |
30-31 |
1-3 |
p. 429-433 5 p. |
artikel |
322 |
On (s, S)-control in a manufacturing system
|
Köchel, Peter |
|
1994 |
30-31 |
1-3 |
p. 343-349 7 p. |
artikel |
323 |
On switching-type mixed-ordering policy based on monitoring forecasting error
|
Hoshino, Kyoji |
|
2001 |
30-31 |
1-3 |
p. 373-380 8 p. |
artikel |
324 |
On the availability of “relevant costs” information in operations management
|
Corbey, Michael |
|
1994 |
30-31 |
1-3 |
p. 121-129 9 p. |
artikel |
325 |
On the bias of intermittent demand estimates
|
Syntetos, A.A |
|
2001 |
30-31 |
1-3 |
p. 457-466 10 p. |
artikel |
326 |
On the optimal release time of jobs with random processing times, with extensions to other criteria
|
Elmaghraby, Salah E. |
|
2001 |
30-31 |
1-3 |
p. 103-113 11 p. |
artikel |
327 |
On the optimization of initial order quantities
|
Ding, Huiping |
|
1991 |
30-31 |
1-3 |
p. 79-88 10 p. |
artikel |
328 |
On the risk-based aggregate planning for seasonal products
|
Vörös, József |
|
1999 |
30-31 |
1-3 |
p. 195-201 7 p. |
artikel |
329 |
On the suboptimality of (S−1, S) lost sales inventory policies
|
Hill, Roger M. |
|
1999 |
30-31 |
1-3 |
p. 387-393 7 p. |
artikel |
330 |
Optimal control of hereditary inventory systems with short-time conservation effects
|
Bogataj, Marija |
|
1994 |
30-31 |
1-3 |
p. 241-244 4 p. |
artikel |
331 |
Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment
|
Dohi, Tadashi |
|
2001 |
30-31 |
1-3 |
p. 147-155 9 p. |
artikel |
332 |
Optimal input control for job-shop type production systems using inverse queueing network analysis
|
Kuroda, M. |
|
1994 |
30-31 |
1-3 |
p. 215-223 9 p. |
artikel |
333 |
Optimal just-in-time buffer inventory for regular preventive maintenance
|
Salameh, M.K. |
|
2001 |
30-31 |
1-3 |
p. 157-161 5 p. |
artikel |
334 |
Optimal moves of the material handling system in a robotic cell
|
Brauner, Nadia |
|
2001 |
30-31 |
1-3 |
p. 269-277 9 p. |
artikel |
335 |
Optimal order quantity and pricing decisions in single-period inventory systems
|
Polatog̈lu, L.Hakan |
|
1991 |
30-31 |
1-3 |
p. 175-185 11 p. |
artikel |
336 |
Optimal prices of a job shop with a single work station: a discrete time model
|
Glud Johansen, Søren |
|
1991 |
30-31 |
1-3 |
p. 129-137 9 p. |
artikel |
337 |
Optimal replacement of a tool subject to random failure
|
Makis, V. |
|
1995 |
30-31 |
1-3 |
p. 249-256 8 p. |
artikel |
338 |
Optimal sequence of partial inspections subject to errors
|
Liou, Ming-Jong |
|
1994 |
30-31 |
1-3 |
p. 109-119 11 p. |
artikel |
339 |
Optimal solution for a two-product dynamic scheduling problem in a just-in-time environment
|
Benyoucef, Lyès |
|
2001 |
30-31 |
1-3 |
p. 85-91 7 p. |
artikel |
340 |
Optimal solution of a total time distribution problem
|
Tsouros, C |
|
1996 |
30-31 |
1-3 |
p. 473-478 6 p. |
artikel |
341 |
Optimal solutions for stochastic inventory models when the lead-time demand distribution is partially specified
|
Shore, Haim |
|
1999 |
30-31 |
1-3 |
p. 477-485 9 p. |
artikel |
342 |
Optimal start times under stochastic activity durations
|
Elmaghraby, S.E. |
|
2000 |
30-31 |
1-3 |
p. 153-164 12 p. |
artikel |
343 |
Order point/order quantity models with random yield
|
Gerchak, Yigal |
|
1992 |
30-31 |
1-3 |
p. 297-298 2 p. |
artikel |
344 |
Organizational changes related to advanced manufacturing technology in the production area
|
Sun, Hongyi |
|
1995 |
30-31 |
1-3 |
p. 369-375 7 p. |
artikel |
345 |
Overview of models and DSS in planning and scheduling of FMS
|
Dhar, U.R. |
|
1991 |
30-31 |
1-3 |
p. 121-127 7 p. |
artikel |
346 |
Pacific manufacturing
|
Tabucanon, Mario T. |
|
1994 |
30-31 |
1-3 |
p. 1-3 3 p. |
artikel |
347 |
Pattern generating procedure for the cutting stock problem
|
Suliman, Saad M.A. |
|
2001 |
30-31 |
1-3 |
p. 293-301 9 p. |
artikel |
348 |
Performance evaluation and design of a CONWIP system with inspections
|
Duri, Christelle |
|
2000 |
30-31 |
1-3 |
p. 219-229 11 p. |
artikel |
349 |
Performance measurement and performance management
|
Lebas, Michel J. |
|
1995 |
30-31 |
1-3 |
p. 23-35 13 p. |
artikel |
350 |
Performance optimization of a system through the transitive interaction between its sections
|
Fragopoulou-Manthou, V. |
|
1992 |
30-31 |
1-3 |
p. 293-296 4 p. |
artikel |
351 |
Perturbations in living stock and similar biological inventory systems
|
Bogataj, L. |
|
1994 |
30-31 |
1-3 |
p. 233-239 7 p. |
artikel |
352 |
Perturbed inventory systems with delays
|
Bogataj, L. |
|
1992 |
30-31 |
1-3 |
p. 277-281 5 p. |
artikel |
353 |
Planning for technological substitution and change
|
Chambers, Michael R. |
|
1991 |
30-31 |
1-3 |
p. 191-200 10 p. |
artikel |
354 |
Positioning inventory in distribution systems
|
Whybark, D.Clay |
|
1996 |
30-31 |
1-3 |
p. 271-278 8 p. |
artikel |
355 |
Preface
|
Attila Chikán, |
|
1996 |
30-31 |
1-3 |
p. xi- 1 p. |
artikel |
356 |
Preface
|
Chikán, Attila |
|
1994 |
30-31 |
1-3 |
p. xv- 1 p. |
artikel |
357 |
Prelims pages: Contents
|
|
|
2001 |
30-31 |
1-3 |
p. viii-x nvt p. |
artikel |
358 |
Principal economic decisions of operational production management in Czechoslovak enterprises of electrotechnical industry
|
Tomek, Gustav |
|
1992 |
30-31 |
1-3 |
p. 243-246 4 p. |
artikel |
359 |
Procurement and vendor management in the global environment
|
Palaniswami, Shanthakumar |
|
1994 |
30-31 |
1-3 |
p. 171-176 6 p. |
artikel |
360 |
Production economics and process quality: A Taguchi perspective
|
Ganeshan, Ram |
|
2001 |
30-31 |
1-3 |
p. 343-350 8 p. |
artikel |
361 |
Production economics: Issues and challenges for the 90's
|
Grubbstrom, Robert W. |
|
1991 |
30-31 |
1-3 |
p. 1-2 2 p. |
artikel |
362 |
Production indices obtained by a myopic policy for non-Markovian dynamics
|
Hongler, Max-Olivier |
|
2001 |
30-31 |
1-3 |
p. 115-123 9 p. |
artikel |
363 |
Production lot sizing with variable production rate and explicit idle capacity cost
|
Eiamkanchanalai, Somkiat |
|
1999 |
30-31 |
1-3 |
p. 251-259 9 p. |
artikel |
364 |
Production lot sizing with work-in-process considerations in response to periodic demand
|
Banerjee, Avijit |
|
1992 |
30-31 |
1-3 |
p. 145-151 7 p. |
artikel |
365 |
Production planning in Japan: rediscovering lost experiences or new insights?
|
de Haan, Job |
|
2001 |
30-31 |
1-3 |
p. 101-109 9 p. |
artikel |
366 |
Production planning using a hybrid simulation – analytical approach
|
Byrne, M.D |
|
1999 |
30-31 |
1-3 |
p. 305-311 7 p. |
artikel |
367 |
Production scheduling to satisfy worker's preferences for days off and overtime under due-date constraints
|
Yura, Kenji |
|
1994 |
30-31 |
1-3 |
p. 265-270 6 p. |
artikel |
368 |
Production strategies under environmental constraints: Continuous-time model with concave costs
|
Dobos, Imre |
|
2001 |
30-31 |
1-3 |
p. 323-330 8 p. |
artikel |
369 |
Production strategies under environmental constraints in an Arrow–Karlin model
|
Dobos, Imre |
|
1999 |
30-31 |
1-3 |
p. 337-340 4 p. |
artikel |
370 |
Productive systems: Strategy, control, and management
|
Artiba, Abdelhakim |
|
2001 |
30-31 |
1-3 |
p. 1-4 4 p. |
artikel |
371 |
Product remanufacturing and disposal: A numerical comparison of alternative control strategies
|
van der Laan, Erwin |
|
1996 |
30-31 |
1-3 |
p. 489-498 10 p. |
artikel |
372 |
Project procurement and disposal decisions: An inventory management model
|
Willoughby, Keith A |
|
2001 |
30-31 |
1-3 |
p. 467-472 6 p. |
artikel |
373 |
Pull-Push integration in production ordering systems
|
Takahashi, Katsuhiko |
|
1994 |
30-31 |
1-3 |
p. 155-161 7 p. |
artikel |
374 |
Pure and modified base-stock policies for the lost sales inventory system with negligible set-up costs and constant lead times
|
Johansen, Søren Glud |
|
2001 |
30-31 |
1-3 |
p. 391-399 9 p. |
artikel |
375 |
Quality by a step-by-step program in low scale industries
|
Zackrisson, J. |
|
1995 |
30-31 |
1-3 |
p. 419-427 9 p. |
artikel |
376 |
Quality control through lot sizing for items sold with warranty
|
Djamaludin, I. |
|
1994 |
30-31 |
1-3 |
p. 97-107 11 p. |
artikel |
377 |
Quantitative models for performance measurement system
|
Suwignjo, P |
|
2000 |
30-31 |
1-3 |
p. 231-241 11 p. |
artikel |
378 |
Reducing inventories in a multi-echelon manufacturing firm A case study
|
Stenger, Alan J |
|
1996 |
30-31 |
1-3 |
p. 239-249 11 p. |
artikel |
379 |
Relativity of the “new logistic technologies” and of their inventory aspects
|
Kisperska-Moroń, Danuta |
|
1992 |
30-31 |
1-3 |
p. 181-186 6 p. |
artikel |
380 |
Reliability of some inventory-production systems
|
Bulinskaya, E.V. |
|
1994 |
30-31 |
1-3 |
p. 245-251 7 p. |
artikel |
381 |
Replenishment and pricing policy for deteriorating items taking into account the time-value of money
|
Wee, Hui-Ming |
|
2001 |
30-31 |
1-3 |
p. 213-220 8 p. |
artikel |
382 |
Researching inventories: Why haven't we learned more?
|
Lovell, Michael C. |
|
1994 |
30-31 |
1-3 |
p. 33-41 9 p. |
artikel |
383 |
Restructuring the bill of material for productivity: A strategic evaluation of product configuration
|
Stonebraker, Peter W |
|
1996 |
30-31 |
1-3 |
p. 251-260 10 p. |
artikel |
384 |
Robotics in automated inspection
|
Hedenborn, Per |
|
1995 |
30-31 |
1-3 |
p. 161-166 6 p. |
artikel |
385 |
Safety stocks in multistage divergent inventory systems: A survey
|
Inderfurth, Karl |
|
1994 |
30-31 |
1-3 |
p. 321-329 9 p. |
artikel |
386 |
Scaling down multi-echelon inventory problems
|
Axsäter, Sven |
|
2001 |
30-31 |
1-3 |
p. 255-261 7 p. |
artikel |
387 |
Segregating space allocation models for container inventories in port container terminals
|
Hwan Kim, Kap |
|
1999 |
30-31 |
1-3 |
p. 415-423 9 p. |
artikel |
388 |
Sensitivity analysis on the CUSUM method
|
Radharamanan, R. |
|
1994 |
30-31 |
1-3 |
p. 89-95 7 p. |
artikel |
389 |
Sensitivity of quadratic cost functionals under stochastically perturbed controls in inventory systems with delays
|
Čibej, J.A. |
|
1994 |
30-31 |
1-3 |
p. 265-270 6 p. |
artikel |
390 |
Sequencing problems in designing energy efficient production systems
|
Wolters, W.T.M. |
|
1995 |
30-31 |
1-3 |
p. 405-410 6 p. |
artikel |
391 |
Sequential stability of the constant cost dynamic lot size model
|
Richter, Knut |
|
1994 |
30-31 |
1-3 |
p. 359-363 5 p. |
artikel |
392 |
Setting customer service levels: an overall cost-approach
|
Konijnendijk, Paul A. |
|
1991 |
30-31 |
1-3 |
p. 139-146 8 p. |
artikel |
393 |
Short term inventory and employment interplay in Finnish manufacturing industry
|
Kyläheiko, Kalevi |
|
1992 |
30-31 |
1-3 |
p. 61-70 10 p. |
artikel |
394 |
Simplicity, totality and change: a logistic viewpoint in inventory management
|
Keloharju, Raimo |
|
1992 |
30-31 |
1-3 |
p. 173-180 8 p. |
artikel |
395 |
Simulating a 100% just-in-time economy
|
Lovell, Michael C. |
|
1992 |
30-31 |
1-3 |
p. 71-78 8 p. |
artikel |
396 |
Simulating the impact of process capability on lot sizes in batch manufacturing
|
Palaniswami, Shanthakumar |
|
1992 |
30-31 |
1-3 |
p. 203-210 8 p. |
artikel |
397 |
Simulation of inventory control systems
|
Alstrøm, Poul |
|
1992 |
30-31 |
1-3 |
p. 125-134 10 p. |
artikel |
398 |
Simulation of supply chain behaviour and performance in an uncertain environment
|
Petrovic, Dobrila |
|
2001 |
30-31 |
1-3 |
p. 429-438 10 p. |
artikel |
399 |
Single facility, multi-item lot sizing under just-in-time and “cyclic scheduling for improvement”
|
Ramani, S. |
|
1992 |
30-31 |
1-3 |
p. 333-339 7 p. |
artikel |
400 |
Small random perturbations of just-in-time systems
|
Bulinskaya, Ekaterina |
|
2001 |
30-31 |
1-3 |
p. 287-294 8 p. |
artikel |
401 |
SME financiers' qualitative evaluation criteria in development projects
|
Hyvärinen, Liisa |
|
1995 |
30-31 |
1-3 |
p. 167-178 12 p. |
artikel |
402 |
Some comments on normal approximation for stochastic demand processes
|
Girlich, Hans-Joachim |
|
1996 |
30-31 |
1-3 |
p. 389-395 7 p. |
artikel |
403 |
Some cultural/geographical styles in quality strategies and quality costs (P.R. China versus Australia)
|
Barad, Miryam |
|
1995 |
30-31 |
1-3 |
p. 81-92 12 p. |
artikel |
404 |
Some designing principles of production systems based on field research in Europe and Japan
|
Fröhner, K.-D. |
|
1991 |
30-31 |
1-3 |
p. 99-103 5 p. |
artikel |
405 |
Some ideas regarding reserving supplier capacity and selecting replenishment quantities in a project context
|
Silver, Edward A. |
|
1994 |
30-31 |
1-3 |
p. 177-182 6 p. |
artikel |
406 |
Some insights regarding selecting sets of scenarios in combinatorial stochastic problems
|
Jönsson, Henrik |
|
1996 |
30-31 |
1-3 |
p. 463-472 10 p. |
artikel |
407 |
Some issues on the modelling of incentives for special sales
|
Arcelus, F.J. |
|
1992 |
30-31 |
1-3 |
p. 267-272 6 p. |
artikel |
408 |
Some practical issues in the assessment of nonconforming rates in a manufacturing process
|
Goh, T.N. |
|
1994 |
30-31 |
1-3 |
p. 81-88 8 p. |
artikel |
409 |
Spare parts management at complex technology-based organizations: An agenda for research
|
Rustenburg, W.D. |
|
2001 |
30-31 |
1-3 |
p. 177-193 17 p. |
artikel |
410 |
Spare provisioning strategy for preventively replaced systems subjected to random failure
|
Chelbi, Anis |
|
2001 |
30-31 |
1-3 |
p. 183-189 7 p. |
artikel |
411 |
Spatial decomposition for a multi-facility production and distribution problem
|
Dhaenens-Flipo, Clarisse |
|
2000 |
30-31 |
1-3 |
p. 177-186 10 p. |
artikel |
412 |
Stability problems in inventory theory
|
Bulinskaya, E.V |
|
1996 |
30-31 |
1-3 |
p. 353-359 7 p. |
artikel |
413 |
Staistical inventory control in theory and practice
|
McLaughlin, Curtis P. |
|
1994 |
30-31 |
1-3 |
p. 161-169 9 p. |
artikel |
414 |
Stochastic considerations of Grubbström—Molinder model of MRP, input-output and multi-echelon inventory systems
|
Bogataj, Ludvik |
|
1996 |
30-31 |
1-3 |
p. 329-336 8 p. |
artikel |
415 |
Stochastic properties of a production—inventory process with planned production using transform methodology
|
Grubbström, Robert W |
|
1996 |
30-31 |
1-3 |
p. 407-419 13 p. |
artikel |
416 |
Stockout risk and order splitting
|
Kelle, Peter |
|
2001 |
30-31 |
1-3 |
p. 407-415 9 p. |
artikel |
417 |
Storage opportunity loss with a Pearson demand distribution
|
Pastijn, H. |
|
1994 |
30-31 |
1-3 |
p. 351-357 7 p. |
artikel |
418 |
Strategic aspects of flexible production technologies: theory and evidence
|
Röller, Lars-Hendrik |
|
1991 |
30-31 |
1-3 |
p. 197-204 8 p. |
artikel |
419 |
Strategic integrated manufacturing systems: the concept and structures
|
Hitomi, Katsundo |
|
1991 |
30-31 |
1-3 |
p. 5-12 8 p. |
artikel |
420 |
Strategic inventory management of renewable energy resources. Aluminium as an energy storage medium and market commodity
|
Partington, E.C. |
|
1992 |
30-31 |
1-3 |
p. 211-216 6 p. |
artikel |
421 |
Strategic safety stocks in reverse logistics supply chains
|
Minner, Stefan |
|
2001 |
30-31 |
1-3 |
p. 417-428 12 p. |
artikel |
422 |
Strategies for encouraging and managing technological innovation
|
O'Brien, C. |
|
1995 |
30-31 |
1-3 |
p. 303-310 8 p. |
artikel |
423 |
Structural reforms and inventory management: Evidence from Indian industries
|
Swaminathan, A.M |
|
2001 |
30-31 |
1-3 |
p. 67-78 12 p. |
artikel |
424 |
Supply centers allocation under budget restrictions minimizing the longest delivery time
|
Tsouros, C. |
|
1994 |
30-31 |
1-3 |
p. 373-377 5 p. |
artikel |
425 |
Supply chain coordination in spatial games
|
Bogataj, Marija |
|
2001 |
30-31 |
1-3 |
p. 277-285 9 p. |
artikel |
426 |
Supply chain modelling using fuzzy sets
|
Petrovic, Dobrila |
|
1999 |
30-31 |
1-3 |
p. 443-453 11 p. |
artikel |
427 |
Systems design of a two-echelon steel industry supply chain
|
Hafeez, K |
|
1996 |
30-31 |
1-3 |
p. 121-130 10 p. |
artikel |
428 |
Temporal aggregation and estimation of inventory functions
|
Ghali, Moheb |
|
1996 |
30-31 |
1-3 |
p. 21-27 7 p. |
artikel |
429 |
The behavior of manufacturers’ inventories: Evidence from US industry level data
|
Humphreys, Brad R. |
|
2001 |
30-31 |
1-3 |
p. 9-20 12 p. |
artikel |
430 |
The choice of replenishment policies in an MRP environment
|
Hautaniemi, Petri |
|
1999 |
30-31 |
1-3 |
p. 85-92 8 p. |
artikel |
431 |
The cost of manufacturing toys in the Shenzhen special economic zone of China
|
Chan, J.C.M. |
|
1991 |
30-31 |
1-3 |
p. 181-190 10 p. |
artikel |
432 |
The development of an integration modelling method for manufacturing cell control systems
|
Jin, J.Q. |
|
1995 |
30-31 |
1-3 |
p. 185-192 8 p. |
artikel |
433 |
The economic lot scheduling problem: theory and practice
|
Narro Lopez, Miguel A. |
|
1991 |
30-31 |
1-3 |
p. 147-164 18 p. |
artikel |
434 |
The economic manufacture/order quantity (EMQ/EOQ) and the learning curve: Past, present, and future
|
Jaber, Mohamad Y. |
|
1999 |
30-31 |
1-3 |
p. 93-102 10 p. |
artikel |
435 |
The effect of (s,S) ordering policy on the supply chain
|
Kelle, Peter |
|
1999 |
30-31 |
1-3 |
p. 113-122 10 p. |
artikel |
436 |
The EOQ with backlogging derived without derivatives
|
Grubbström, Robert W. |
|
1999 |
30-31 |
1-3 |
p. 529-530 2 p. |
artikel |
437 |
The extended EOQ repair and waste disposal model
|
Richter, Knut |
|
1996 |
30-31 |
1-3 |
p. 443-447 5 p. |
artikel |
438 |
The feeder rack assignment problem in PCB assembly: A case study
|
Klomp, Cornelis |
|
2000 |
30-31 |
1-3 |
p. 399-407 9 p. |
artikel |
439 |
The finite horizon economic lot sizing problem in job shops:
|
Ouenniche, J. |
|
2001 |
30-31 |
1-3 |
p. 49-61 13 p. |
artikel |
440 |
The impact of inventory and flow planning parameters on supply chain performance: An exploratory study
|
Ganeshan, Ram |
|
2001 |
30-31 |
1-3 |
p. 111-118 8 p. |
artikel |
441 |
The impact of real-time data communication on inventory management
|
Yao, Andrew C |
|
1999 |
30-31 |
1-3 |
p. 213-219 7 p. |
artikel |
442 |
The implementation and use of material requirements planning system in Northern Greece: A case study
|
Manthou, Vassiliki |
|
1996 |
30-31 |
1-3 |
p. 187-193 7 p. |
artikel |
443 |
The influence of lead-time reductions on decisions and rules in the production planning process
|
Wedel, J. |
|
1995 |
30-31 |
1-3 |
p. 399-404 6 p. |
artikel |
444 |
The inventory investment decision and firm value: A conceptual framework
|
Nyerges, Richard |
|
1992 |
30-31 |
1-3 |
p. 193-201 9 p. |
artikel |
445 |
The inventory investment equation: an empirical work using business survey data
|
Modesto, Leonor |
|
1992 |
30-31 |
1-3 |
p. 79-88 10 p. |
artikel |
446 |
The new management paradigm: An extension through the IFAM perspective
|
Nyerges, Richard T |
|
1996 |
30-31 |
1-3 |
p. 203-214 12 p. |
artikel |
447 |
The origins of dynamic inventory modelling under uncertainty
|
Girlich, Hans-Joachim |
|
2001 |
30-31 |
1-3 |
p. 351-363 13 p. |
artikel |
448 |
The overlapping production planning: A new approach of bounded capacity management
|
Bahroun, Z |
|
2000 |
30-31 |
1-3 |
p. 21-36 16 p. |
artikel |
449 |
The relationship of work-in-process inventories, manufacturing lead times and waiting line analysis
|
Rao, S.Subba |
|
1992 |
30-31 |
1-3 |
p. 221-227 7 p. |
artikel |
450 |
The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost
|
Richter, Knut |
|
2001 |
30-31 |
1-3 |
p. 447-456 10 p. |
artikel |
451 |
The role of inventory investment as a leading indicator of the US business cycle
|
Stern, Andrew |
|
1994 |
30-31 |
1-3 |
p. 65-75 11 p. |
artikel |
452 |
The role of master kits in assembly operations
|
Carlson, John G. |
|
1994 |
30-31 |
1-3 |
p. 253-258 6 p. |
artikel |
453 |
The role of qualitative methods in production management research
|
Beach, R. |
|
2001 |
30-31 |
1-3 |
p. 201-212 12 p. |
artikel |
454 |
The selection of information systems for production management: An evolving problem
|
Beach, R. |
|
2000 |
30-31 |
1-3 |
p. 319-329 11 p. |
artikel |
455 |
The self-consistent parametric inference algorithm (SPI): Optimisation in continuous search space
|
Bodmann, Bardo E.J. |
|
2001 |
30-31 |
1-3 |
p. 303-312 10 p. |
artikel |
456 |
The speed of adjustment and production smoothing: Bayesian estimation
|
Surekha, K |
|
2001 |
30-31 |
1-3 |
p. 55-65 11 p. |
artikel |
457 |
The strategic grounding of competitive advantage — The case of Scania
|
Nilsson, Carl-Henric |
|
1995 |
30-31 |
1-3 |
p. 281-296 16 p. |
artikel |
458 |
The system implications of pure manufacturing policy options
|
Walbank, Martin |
|
1992 |
30-31 |
1-3 |
p. 247-255 9 p. |
artikel |
459 |
The two level master production schedule and planning bills in a just in time MRP context
|
Lamouri, Samir |
|
2000 |
30-31 |
1-3 |
p. 409-415 7 p. |
artikel |
460 |
The undershoot of the reorder point: Tests of an approximation
|
Baganha, Manuel P |
|
1996 |
30-31 |
1-3 |
p. 311-320 10 p. |
artikel |
461 |
The usefulness of possibilistic programming in production planning problems
|
Inuiguchi, Masahiro |
|
1994 |
30-31 |
1-3 |
p. 45-52 8 p. |
artikel |
462 |
The use of automatic data capture systems in inventory management
|
Lindau, Roger |
|
1999 |
30-31 |
1-3 |
p. 159-167 9 p. |
artikel |
463 |
The use of the PROMETHEE method in the location choice of a production system
|
Pavić, Ivan |
|
1991 |
30-31 |
1-3 |
p. 165-174 10 p. |
artikel |
464 |
The volume and structure of inventories
|
Chikán, Attila |
|
1996 |
30-31 |
1-3 |
p. 1-7 7 p. |
artikel |
465 |
Time to build and aggregate work-in-progress
|
Milne, Alistair |
|
2001 |
30-31 |
1-3 |
p. 165-175 11 p. |
artikel |
466 |
Title index
|
|
|
1992 |
30-31 |
1-3 |
p. 375- 1 p. |
artikel |
467 |
Title index
|
|
|
1991 |
30-31 |
1-3 |
p. 232-232 1 p. |
artikel |
468 |
Tracking signals in inventory control systems A simulation study
|
Alstrøm, Poul |
|
1996 |
30-31 |
1-3 |
p. 293-302 10 p. |
artikel |
469 |
Trends in inventory management
|
Bonney, M.C. |
|
1994 |
30-31 |
1-3 |
p. 107-114 8 p. |
artikel |
470 |
UK stock relief legislation and the short run-tax elasticity of inventory investment
|
Milne, Alistair |
|
1994 |
30-31 |
1-3 |
p. 43-52 10 p. |
artikel |
471 |
Unit load size as a function of the degree of overtaking
|
Bengtsson, Johan |
|
1995 |
30-31 |
1-3 |
p. 103-108 6 p. |
artikel |
472 |
Use of simulation for planning of work organization in highly automated production systems — Two case studies
|
Zülch, Gert |
|
1995 |
30-31 |
1-3 |
p. 429-436 8 p. |
artikel |
473 |
Using learning theory in assembly lines for new products
|
Dar-El, Ezey M. |
|
1991 |
30-31 |
1-3 |
p. 103-109 7 p. |
artikel |
474 |
Using mixed frequency data to improve macroeconomic forecasts of inventory investment
|
Donihue, Michael R. |
|
1992 |
30-31 |
1-3 |
p. 33-41 9 p. |
artikel |
475 |
Variable priority dispatching rules: An analytical approach
|
Agliari, Anna |
|
1995 |
30-31 |
1-3 |
p. 51-58 8 p. |
artikel |
476 |
Variance laws for inventory management
|
Boylan, I.E |
|
1996 |
30-31 |
1-3 |
p. 343-352 10 p. |
artikel |
477 |
Virtual enterprise – organisation, evolution and control
|
Martinez, M.T |
|
2001 |
30-31 |
1-3 |
p. 225-238 14 p. |
artikel |
478 |
Warehousing conditions for holding inventory in Polish supply chains
|
Kisperska-Moron, Danuta |
|
1999 |
30-31 |
1-3 |
p. 123-128 6 p. |
artikel |
479 |
Water resources planning under budgetary uncertainty: the case in Indonesia
|
Sutardi, |
|
1991 |
30-31 |
1-3 |
p. 201-217 17 p. |
artikel |
480 |
Weather and structural reforms induced instability in agriculture and buffer stocks in India
|
Prasad, K.N. |
|
1994 |
30-31 |
1-3 |
p. 53-63 11 p. |
artikel |
481 |
Weather-induced instability in agricultural produce with respect to buffer stocks in India and Iran: an integrated optimisation and dynamic input-output model
|
Prasad, K.N. |
|
1992 |
30-31 |
1-3 |
p. 89-97 9 p. |
artikel |
482 |
Why are UK manufacturing inventory-output ratios falling?
|
Black, I.G. |
|
1994 |
30-31 |
1-3 |
p. 1-9 9 p. |
artikel |
483 |
Work-force management in automated assembly systems
|
Croci, F |
|
2000 |
30-31 |
1-3 |
p. 243-255 13 p. |
artikel |
484 |
Work in process: performance measures
|
Fogarty, Donald W. |
|
1992 |
30-31 |
1-3 |
p. 169-172 4 p. |
artikel |
485 |
Workplace design-General view and some special experiences
|
Kern, P. |
|
1995 |
30-31 |
1-3 |
p. 203-209 7 p. |
artikel |
486 |
Zero inventory management: facts or fiction? Lessons from Japan
|
de Haan, Job |
|
1999 |
30-31 |
1-3 |
p. 65-75 11 p. |
artikel |