no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
A comparison of the behavior of Japanese and US inventories
|
West, Kenneth D. |
|
1992 |
26 |
1-3 |
p. 115-122 8 p. |
article |
2 |
A decision support system for materials management
|
Speranza, M.G. |
|
1992 |
26 |
1-3 |
p. 229-236 8 p. |
article |
3 |
An overview of the state and problems of inventory management in Finland
|
Pirttilä, Timo |
|
1992 |
26 |
1-3 |
p. 217-220 4 p. |
article |
4 |
A simulation-based method to aid the improvement of manufacturing flexibility
|
Byrne, M.D. |
|
1992 |
26 |
1-3 |
p. 153-159 7 p. |
article |
5 |
A simulation study of bottleneck scheduling
|
Neely, A.D. |
|
1992 |
26 |
1-3 |
p. 187-192 6 p. |
article |
6 |
A stochastic inventory problem with piecewise quadratic costs
|
Parlar, Mahmut |
|
1992 |
26 |
1-3 |
p. 327-332 6 p. |
article |
7 |
A test of the linear rational expectations equilibrium inventory model in the EEC
|
Dimelis, Sophia P. |
|
1992 |
26 |
1-3 |
p. 25-32 8 p. |
article |
8 |
Author index
|
|
|
1992 |
26 |
1-3 |
p. 374- 1 p. |
article |
9 |
Average cost estimation of lot-sizing heuristics
|
Richter, Knut |
|
1992 |
26 |
1-3 |
p. 341-345 5 p. |
article |
10 |
Changing the givens in modelling inventory problems: the example of just-in-time systems
|
Silver, Edward A. |
|
1992 |
26 |
1-3 |
p. 347-351 5 p. |
article |
11 |
Combinatorial optimization of the location—inventory problem
|
Bogataj, Marija |
|
1992 |
26 |
1-3 |
p. 273-276 4 p. |
article |
12 |
Controlled stochastic processes and inventories
|
Girlich, Hans-Joachim |
|
1992 |
26 |
1-3 |
p. 299-302 4 p. |
article |
13 |
Direct tests of the hypothesis that expectations are rational
|
Irvine, F.Owen |
|
1992 |
26 |
1-3 |
p. 49-59 11 p. |
article |
14 |
Does levelling lead to shortages? An empirical test
|
Ábel, I. |
|
1992 |
26 |
1-3 |
p. 5-11 7 p. |
article |
15 |
Editorial Board
|
|
|
1992 |
26 |
1-3 |
p. iii-vi nvt p. |
article |
16 |
Electronic data interchange and inventories
|
Anvari, Mohsen |
|
1992 |
26 |
1-3 |
p. 135-143 9 p. |
article |
17 |
Empirical estimation of three models of production and inventory behavior using monthly industry data
|
Ghali, Moheb A. |
|
1992 |
26 |
1-3 |
p. 43-48 6 p. |
article |
18 |
Extension of a reliability-type inventory model to just-in-time systems
|
Kelle, Peter |
|
1992 |
26 |
1-3 |
p. 319-326 8 p. |
article |
19 |
Foreword
|
Chikán, Attila |
|
1992 |
26 |
1-3 |
p. 1- 1 p. |
article |
20 |
Forming the material supply structure through the choice of the production cooperation range
|
Sygit, Maciej |
|
1992 |
26 |
1-3 |
p. 237-241 5 p. |
article |
21 |
Heavy-traffic inventory—production systems
|
Bulinskaya, E.V. |
|
1992 |
26 |
1-3 |
p. 283-291 9 p. |
article |
22 |
Hierarchical production planning and multi-echelon inventory management
|
Zijm, W.H.M. |
|
1992 |
26 |
1-3 |
p. 257-264 8 p. |
article |
23 |
Hypergame analysis of the stability of relationships between computerbased logistics systems
|
Graham, Ian |
|
1992 |
26 |
1-3 |
p. 303-310 8 p. |
article |
24 |
Incremental order quantity for the case of very lumpy demand
|
Yilmaz, Cengiz |
|
1992 |
26 |
1-3 |
p. 367-371 5 p. |
article |
25 |
Intertemporal generalization of the relationship between material requirements planning and input-output analysis
|
Grubbström, Robert W. |
|
1992 |
26 |
1-3 |
p. 311-318 8 p. |
article |
26 |
Inventories in macroeconomic fluctuations: the stylized facts
|
Sebold-Bender, Monika |
|
1992 |
26 |
1-3 |
p. 107-114 8 p. |
article |
27 |
Inventories in the economy in transition
|
Chikán, Attila |
|
1992 |
26 |
1-3 |
p. 19-23 5 p. |
article |
28 |
Linear model for Bulgarian inventory investment between 1962 and 1985
|
Chankova, Lilia |
|
1992 |
26 |
1-3 |
p. 13-18 6 p. |
article |
29 |
List of referees
|
|
|
1992 |
26 |
1-3 |
p. 373- 1 p. |
article |
30 |
Minimum cost allocation of supply centers with limitation on time delivery
|
Tsouros, C. |
|
1992 |
26 |
1-3 |
p. 353-358 6 p. |
article |
31 |
Mixed model assembly simulation
|
Carlson, John G. |
|
1992 |
26 |
1-3 |
p. 161-167 7 p. |
article |
32 |
Multiple batch structures in throughput scheduling
|
Weeda, P.J. |
|
1992 |
26 |
1-3 |
p. 359-366 8 p. |
article |
33 |
Observation errors and inventory cycles
|
Reiter, Michael |
|
1992 |
26 |
1-3 |
p. 99-105 7 p. |
article |
34 |
Order point/order quantity models with random yield
|
Gerchak, Yigal |
|
1992 |
26 |
1-3 |
p. 297-298 2 p. |
article |
35 |
Performance optimization of a system through the transitive interaction between its sections
|
Fragopoulou-Manthou, V. |
|
1992 |
26 |
1-3 |
p. 293-296 4 p. |
article |
36 |
Perturbed inventory systems with delays
|
Bogataj, L. |
|
1992 |
26 |
1-3 |
p. 277-281 5 p. |
article |
37 |
Principal economic decisions of operational production management in Czechoslovak enterprises of electrotechnical industry
|
Tomek, Gustav |
|
1992 |
26 |
1-3 |
p. 243-246 4 p. |
article |
38 |
Production lot sizing with work-in-process considerations in response to periodic demand
|
Banerjee, Avijit |
|
1992 |
26 |
1-3 |
p. 145-151 7 p. |
article |
39 |
Relativity of the “new logistic technologies” and of their inventory aspects
|
Kisperska-Moroń, Danuta |
|
1992 |
26 |
1-3 |
p. 181-186 6 p. |
article |
40 |
Short term inventory and employment interplay in Finnish manufacturing industry
|
Kyläheiko, Kalevi |
|
1992 |
26 |
1-3 |
p. 61-70 10 p. |
article |
41 |
Simplicity, totality and change: a logistic viewpoint in inventory management
|
Keloharju, Raimo |
|
1992 |
26 |
1-3 |
p. 173-180 8 p. |
article |
42 |
Simulating a 100% just-in-time economy
|
Lovell, Michael C. |
|
1992 |
26 |
1-3 |
p. 71-78 8 p. |
article |
43 |
Simulating the impact of process capability on lot sizes in batch manufacturing
|
Palaniswami, Shanthakumar |
|
1992 |
26 |
1-3 |
p. 203-210 8 p. |
article |
44 |
Simulation of inventory control systems
|
Alstrøm, Poul |
|
1992 |
26 |
1-3 |
p. 125-134 10 p. |
article |
45 |
Single facility, multi-item lot sizing under just-in-time and “cyclic scheduling for improvement”
|
Ramani, S. |
|
1992 |
26 |
1-3 |
p. 333-339 7 p. |
article |
46 |
Some issues on the modelling of incentives for special sales
|
Arcelus, F.J. |
|
1992 |
26 |
1-3 |
p. 267-272 6 p. |
article |
47 |
Strategic inventory management of renewable energy resources. Aluminium as an energy storage medium and market commodity
|
Partington, E.C. |
|
1992 |
26 |
1-3 |
p. 211-216 6 p. |
article |
48 |
The inventory investment decision and firm value: A conceptual framework
|
Nyerges, Richard |
|
1992 |
26 |
1-3 |
p. 193-201 9 p. |
article |
49 |
The inventory investment equation: an empirical work using business survey data
|
Modesto, Leonor |
|
1992 |
26 |
1-3 |
p. 79-88 10 p. |
article |
50 |
The relationship of work-in-process inventories, manufacturing lead times and waiting line analysis
|
Rao, S.Subba |
|
1992 |
26 |
1-3 |
p. 221-227 7 p. |
article |
51 |
The system implications of pure manufacturing policy options
|
Walbank, Martin |
|
1992 |
26 |
1-3 |
p. 247-255 9 p. |
article |
52 |
Title index
|
|
|
1992 |
26 |
1-3 |
p. 375- 1 p. |
article |
53 |
Using mixed frequency data to improve macroeconomic forecasts of inventory investment
|
Donihue, Michael R. |
|
1992 |
26 |
1-3 |
p. 33-41 9 p. |
article |
54 |
Weather-induced instability in agricultural produce with respect to buffer stocks in India and Iran: an integrated optimisation and dynamic input-output model
|
Prasad, K.N. |
|
1992 |
26 |
1-3 |
p. 89-97 9 p. |
article |
55 |
Work in process: performance measures
|
Fogarty, Donald W. |
|
1992 |
26 |
1-3 |
p. 169-172 4 p. |
article |