nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
An economic batch production quantity model with learning curve-dependent effects: a technical note
|
Shiue, Yih-Chearng |
|
1991 |
25 |
1-3 |
p. 35-38 4 p. |
artikel |
2 |
An integrated production-inventory-distribution model for manufacture of urea: a case
|
Haq, A. Noorul |
|
1991 |
25 |
1-3 |
p. 39-49 11 p. |
artikel |
3 |
A study on the design of CNC lathe for education and application
|
Kim, Jeong-Du |
|
1991 |
25 |
1-3 |
p. 169-180 12 p. |
artikel |
4 |
A two-tier hierarchical scheduler for the micro-electronic industry
|
Dar-El, Ezey M. |
|
1991 |
25 |
1-3 |
p. 81-87 7 p. |
artikel |
5 |
Author index
|
|
|
1991 |
25 |
1-3 |
p. 231-231 1 p. |
artikel |
6 |
Bicriterion scheduling problem in a job shop with parallel processors
|
Cenna, Ahmed Abu |
|
1991 |
25 |
1-3 |
p. 95-101 7 p. |
artikel |
7 |
Computerised materials requirement planning in manufacturing companies in Malaysia
|
Hamid, Aziz A. |
|
1991 |
25 |
1-3 |
p. 73-79 7 p. |
artikel |
8 |
Conveyor scheduling system for a feeds manufacturing plant: a case study
|
del Rosario, Elise A. |
|
1991 |
25 |
1-3 |
p. 89-94 6 p. |
artikel |
9 |
Cycle time models for single/double carousel system
|
Hwang, Hark |
|
1991 |
25 |
1-3 |
p. 129-140 12 p. |
artikel |
10 |
Deriving advantages from advanced manufacturing technology — an organizing paradigm
|
Chung, K.B. |
|
1991 |
25 |
1-3 |
p. 13-21 9 p. |
artikel |
11 |
Editorial Board
|
|
|
1991 |
25 |
1-3 |
p. iii-vi nvt p. |
artikel |
12 |
Estimating inventory variance with the batch means method
|
Takahashi, Katsuhiko |
|
1991 |
25 |
1-3 |
p. 23-33 11 p. |
artikel |
13 |
Flexible part-feeding system for machine loading and assembly. Part I. A state-of-the-art survey
|
Lee, Kok-Meng |
|
1991 |
25 |
1-3 |
p. 141-153 13 p. |
artikel |
14 |
Flexible part-feeding system for machine loading and assembly. Part II. A cost-effective solution
|
Lee, Kok-Meng |
|
1991 |
25 |
1-3 |
p. 155-168 14 p. |
artikel |
15 |
Japanese direct investment in Asia-Pacific and other regions: Empirical analysis using MITI survey data
|
Nakamura, Masao |
|
1991 |
25 |
1-3 |
p. 219-229 11 p. |
artikel |
16 |
Loading problem and resource considerations in FMS: a review
|
Shanker, Kripa |
|
1991 |
25 |
1-3 |
p. 111-119 9 p. |
artikel |
17 |
Manufacturing and operation management: Asia-Pacific orientation
|
Tabucanon, Mario T. |
|
1991 |
25 |
1-3 |
p. 1-4 4 p. |
artikel |
18 |
MRP: an adaptive approach
|
Al-Hakim, Latif A. |
|
1991 |
25 |
1-3 |
p. 65-72 8 p. |
artikel |
19 |
MRP with uncertainty: a review and some extensions
|
Murthy, D.N.P. |
|
1991 |
25 |
1-3 |
p. 51-64 14 p. |
artikel |
20 |
Overview of models and DSS in planning and scheduling of FMS
|
Dhar, U.R. |
|
1991 |
25 |
1-3 |
p. 121-127 7 p. |
artikel |
21 |
Planning for technological substitution and change
|
Chambers, Michael R. |
|
1991 |
25 |
1-3 |
p. 191-200 10 p. |
artikel |
22 |
Strategic integrated manufacturing systems: the concept and structures
|
Hitomi, Katsundo |
|
1991 |
25 |
1-3 |
p. 5-12 8 p. |
artikel |
23 |
The cost of manufacturing toys in the Shenzhen special economic zone of China
|
Chan, J.C.M. |
|
1991 |
25 |
1-3 |
p. 181-190 10 p. |
artikel |
24 |
Title index
|
|
|
1991 |
25 |
1-3 |
p. 232-232 1 p. |
artikel |
25 |
Using learning theory in assembly lines for new products
|
Dar-El, Ezey M. |
|
1991 |
25 |
1-3 |
p. 103-109 7 p. |
artikel |
26 |
Water resources planning under budgetary uncertainty: the case in Indonesia
|
Sutardi, |
|
1991 |
25 |
1-3 |
p. 201-217 17 p. |
artikel |