nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Markov decision process-based policy characterization approach for a stochastic inventory control problem with unreliable sourcing
|
Ahiska, S. Sebnem |
|
2013 |
144 |
2 |
p. 485-496 12 p. |
artikel |
2 |
Analysis for strategy of closed-loop supply chain with dual recycling channel
|
Huang, Min |
|
2013 |
144 |
2 |
p. 510-520 11 p. |
artikel |
3 |
An economic production quantity model with consolidating shipments of imperfect quality items: A note
|
Chang, Hung-Chi |
|
2013 |
144 |
2 |
p. 507-509 3 p. |
artikel |
4 |
An effective dynamic decision policy for the revenue management of an airline flight
|
Hung, Yi-Feng |
|
2013 |
144 |
2 |
p. 440-450 11 p. |
artikel |
5 |
An experimental study on the effect of pattern recognition parameters on the accuracy of wireless-based task time estimation
|
Muyanja, Andrew W. |
|
2013 |
144 |
2 |
p. 533-545 13 p. |
artikel |
6 |
A vendor–buyer integrated production–inventory model with normal distribution of lead time
|
Hoque, M.A. |
|
2013 |
144 |
2 |
p. 409-417 9 p. |
artikel |
7 |
Comment on “Simultaneous determination of multiproduct batch and full truckload shipment schedules”
|
Prasetyo, Hari |
|
2013 |
144 |
2 |
p. 405-408 4 p. |
artikel |
8 |
Containing piracy with product pricing, updating and protection investments
|
Kogan, Konstantin |
|
2013 |
144 |
2 |
p. 468-478 11 p. |
artikel |
9 |
Determining cost effectiveness index of remanufacturing: A graph theoretic approach
|
Sabharwal, Srishti |
|
2013 |
144 |
2 |
p. 521-532 12 p. |
artikel |
10 |
Editorial Board
|
|
|
2013 |
144 |
2 |
p. IFC- 1 p. |
artikel |
11 |
Erratum to “Johnson's algorithm: A key to solve optimally or approximately flowshop scheduling problems with unavailability periods” [International Journal of Production Economics 121 (2009) 81–87]
|
Rapine, C. |
|
2013 |
144 |
2 |
p. 641-643 3 p. |
artikel |
12 |
Examining relationships between the return policy, product quality, and pricing strategy in online direct selling
|
Li, Yongjian |
|
2013 |
144 |
2 |
p. 451-460 10 p. |
artikel |
13 |
Influence of dispatching rules on average production lead time for multi-stage production systems
|
Hübl, Alexander |
|
2013 |
144 |
2 |
p. 479-484 6 p. |
artikel |
14 |
Numerical investigation on mixed bundling and pricing of information products
|
Li, Minqiang |
|
2013 |
144 |
2 |
p. 560-571 12 p. |
artikel |
15 |
Optimal inventory policy for a perishable item with demand function sensitive to price and time
|
Avinadav, Tal |
|
2013 |
144 |
2 |
p. 497-506 10 p. |
artikel |
16 |
Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging
|
Ouyang, Liang-Yuh |
|
2013 |
144 |
2 |
p. 610-617 8 p. |
artikel |
17 |
Ordering, pricing and allocation in a service supply chain
|
Wei, Yihua |
|
2013 |
144 |
2 |
p. 590-598 9 p. |
artikel |
18 |
Overbooking for parallel flights with transference
|
Huang, Yiqian |
|
2013 |
144 |
2 |
p. 582-589 8 p. |
artikel |
19 |
Production and lead time quotation under imperfect shop floor information
|
Kaman, Cumhur |
|
2013 |
144 |
2 |
p. 422-431 10 p. |
artikel |
20 |
RFID and perishable inventory management with shelf-space and freshness dependent demand
|
Piramuthu, Selwyn |
|
2013 |
144 |
2 |
p. 635-640 6 p. |
artikel |
21 |
Scenario-based strategic supply chain design and analysis for the forest biorefinery using an operational supply chain model
|
Mansoornejad, Behrang |
|
2013 |
144 |
2 |
p. 618-634 17 p. |
artikel |
22 |
Scheduling deteriorating jobs with past-sequence-dependent delivery times
|
Liu, Ming |
|
2013 |
144 |
2 |
p. 418-421 4 p. |
artikel |
23 |
Sequential grouping heuristic for the two-dimensional cutting stock problem with pattern reduction
|
Cui, Yaodong |
|
2013 |
144 |
2 |
p. 432-439 8 p. |
artikel |
24 |
Sourcing under cost information asymmetry when facing time-sensitive customers
|
Xu, He |
|
2013 |
144 |
2 |
p. 599-609 11 p. |
artikel |
25 |
Supplier partnership and cost performance: The moderating roles of specific investments and environmental uncertainty
|
Yeung, Kwong |
|
2013 |
144 |
2 |
p. 546-559 14 p. |
artikel |
26 |
Supply chain channel strategies with quality and marketing effort-dependent demand
|
Ma, Peng |
|
2013 |
144 |
2 |
p. 572-581 10 p. |
artikel |
27 |
VRP12 (vehicle routing problem with distances one and two) with side constraints
|
Ceranoglu, Ahmet N. |
|
2013 |
144 |
2 |
p. 461-467 7 p. |
artikel |