no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
A bilinear goal programming model and a modified Benders decomposition algorithm for supply chain reconfiguration and supplier selection
|
Osman, Hany |
|
2010 |
124 |
1 |
p. 97-105 9 p. |
article |
2 |
A classification of logistic outsourcing levels and their impact on service performance: Evidence from the food processing industry
|
Hsiao, H.I. |
|
2010 |
124 |
1 |
p. 75-86 12 p. |
article |
3 |
A comparative study of pull control mechanisms for unreliable homogenous transfer lines
|
Lavoie, P. |
|
2010 |
124 |
1 |
p. 241-251 11 p. |
article |
4 |
A method for partner selection of codevelopment alliances using individual and collaborative utilities
|
Feng, Bo |
|
2010 |
124 |
1 |
p. 159-170 12 p. |
article |
5 |
An analysis of apple supply response
|
Devadoss, Stephen |
|
2010 |
124 |
1 |
p. 265-271 7 p. |
article |
6 |
An empirical study of employee loyalty, service quality and firm performance in the service industry
|
Yee, Rachel W.Y. |
|
2010 |
124 |
1 |
p. 109-120 12 p. |
article |
7 |
A stochastic model to study the system capacity for supply chains in terms of minimal cuts
|
Lin, Yi-Kuei |
|
2010 |
124 |
1 |
p. 181-187 7 p. |
article |
8 |
A two-machine flowshop scheduling problem with deteriorating jobs and blocking
|
Lee, Wen-Chiung |
|
2010 |
124 |
1 |
p. 188-197 10 p. |
article |
9 |
Competition and cooperation in a single-retailer two-supplier supply chain with supply disruption
|
Li, Jian |
|
2010 |
124 |
1 |
p. 137-150 14 p. |
article |
10 |
Coordination of a supply chain with consumer return under demand uncertainty
|
Xiao, Tiaojun |
|
2010 |
124 |
1 |
p. 171-180 10 p. |
article |
11 |
Crane scheduling in a shipbuilding environment
|
Wen, Charlie |
|
2010 |
124 |
1 |
p. 40-50 11 p. |
article |
12 |
Designing multi-attribute auctions for engineering services procurement in new product development in the automotive context
|
Perrone, G. |
|
2010 |
124 |
1 |
p. 20-31 12 p. |
article |
13 |
Economic order quantity model for items with imperfect quality with learning in inspection
|
Khan, M. |
|
2010 |
124 |
1 |
p. 87-96 10 p. |
article |
14 |
Entry timing in a secondary market: When to trade?
|
Yan, Tingting |
|
2010 |
124 |
1 |
p. 62-74 13 p. |
article |
15 |
Game-theoretic approach to simultaneous configuration of platform products and supply chains with one manufacturing firm and multiple cooperative suppliers
|
Zhang, Xinyan |
|
2010 |
124 |
1 |
p. 121-136 16 p. |
article |
16 |
Integrating sustainability into supplier selection with grey system and rough set methodologies
|
Bai, Chunguang |
|
2010 |
124 |
1 |
p. 252-264 13 p. |
article |
17 |
Inventory optimization in a one product recoverable manufacturing system
|
Sebnem Ahiska, S. |
|
2010 |
124 |
1 |
p. 11-19 9 p. |
article |
18 |
Life cycle inventory policy characterizations for a single-product recoverable system
|
Ahiska, S. Sebnem |
|
2010 |
124 |
1 |
p. 51-61 11 p. |
article |
19 |
Managing yield by lot splitting in a serial production line with learning, rework and scrap
|
Jaber, Mohamad Y. |
|
2010 |
124 |
1 |
p. 32-39 8 p. |
article |
20 |
Multi-objective job-shop scheduling with lot-splitting production
|
Huang, Rong-Hwa |
|
2010 |
124 |
1 |
p. 206-213 8 p. |
article |
21 |
Note on: A necessary and sufficient conditions for the existence of the optimal solution of a single-vendor single-buyer integrated production-inventory model with process unreliability consideration
|
Ha, Daesung |
|
2010 |
124 |
1 |
p. 106-108 3 p. |
article |
22 |
On integrating theories of international economics in the strategic planning of global supply chains and facility location
|
Lee, Chaehwa |
|
2010 |
124 |
1 |
p. 225-240 16 p. |
article |
23 |
Optimal age for preventive replacement under a combined fully renewable free replacement with a pro-rata warranty
|
Chien, Yu-Hung |
|
2010 |
124 |
1 |
p. 198-205 8 p. |
article |
24 |
Project performance development framework: An approach for developing performance criteria & measures for information systems (IS) projects
|
Barclay, Corlane |
|
2010 |
124 |
1 |
p. 272-292 21 p. |
article |
25 |
Scheduling problems with multiple maintenance activities and non-preemptive jobs on two identical parallel machines
|
Sun, Kaibiao |
|
2010 |
124 |
1 |
p. 151-158 8 p. |
article |
26 |
Supply flexibility strategies in Spanish firms: Results from a survey
|
Tachizawa, Elcio M. |
|
2010 |
124 |
1 |
p. 214-224 11 p. |
article |
27 |
The environment as a determining factor of purchasing and supply strategy: An empirical analysis of Brazilian firms
|
González-Benito, Javier |
|
2010 |
124 |
1 |
p. 1-10 10 p. |
article |
28 |
The viewpoint on “Optimal inventory policy with non-instantaneous receipt under trade credit by Ouyang, Teng, Chuang and Chuang”
|
Chung, Kun-Jen |
|
2010 |
124 |
1 |
p. 293-298 6 p. |
article |