nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A continuous model for supply planning of assembly systems with stochastic component procurement times
|
Chauhan, Satyaveer S. |
|
2009 |
120 |
2 |
p. 411-417 7 p. |
artikel |
2 |
Agents’ incentives under buy-back contracts in a two-stage supply chain
|
Wang, Yulan |
|
2009 |
120 |
2 |
p. 525-539 15 p. |
artikel |
3 |
A hybrid heuristic algorithm adopting both Boltzmann function and mutation operator for manufacturing cell formation problems
|
Wu, Tai-Hsi |
|
2009 |
120 |
2 |
p. 669-688 20 p. |
artikel |
4 |
A method for reducing inter-departure time variability in serial production lines
|
Kalir, Adar A. |
|
2009 |
120 |
2 |
p. 340-347 8 p. |
artikel |
5 |
Analysis of a general Markovian two-stage continuous-flow production system with a finite buffer
|
Tan, Barış |
|
2009 |
120 |
2 |
p. 327-339 13 p. |
artikel |
6 |
Analyzing the relationships between information technology, inputs substitution and national characteristics based on CES stochastic frontier production models
|
Chen, Yueh H. |
|
2009 |
120 |
2 |
p. 552-569 18 p. |
artikel |
7 |
An assessment of world-wide research productivity in production and operations management
|
Hsieh, Pao-Nuan |
|
2009 |
120 |
2 |
p. 540-551 12 p. |
artikel |
8 |
An economic-statistical design of double sampling X ¯ control chart
|
Torng, Chau-Chen |
|
2009 |
120 |
2 |
p. 495-500 6 p. |
artikel |
9 |
Ant colony optimization for the single model U-type assembly line balancing problem
|
Sabuncuoglu, Ihsan |
|
2009 |
120 |
2 |
p. 287-300 14 p. |
artikel |
10 |
A paradigm for examining second-order factor models employing structural equation modeling
|
Koufteros, Xenophon |
|
2009 |
120 |
2 |
p. 633-652 20 p. |
artikel |
11 |
Backup strategy for robots’ failures in an automotive assembly system
|
Kahan, Tomer |
|
2009 |
120 |
2 |
p. 315-326 12 p. |
artikel |
12 |
Benefits of using hybrid business models within a supply chain
|
Martínez-Olvera, César |
|
2009 |
120 |
2 |
p. 501-511 11 p. |
artikel |
13 |
Circulation of autonomous agents in production and service networks
|
Gallay, Olivier |
|
2009 |
120 |
2 |
p. 378-388 11 p. |
artikel |
14 |
Comparison of exact and heuristic methods for a transfer line balancing problem
|
Guschinskaya, Olga |
|
2009 |
120 |
2 |
p. 276-286 11 p. |
artikel |
15 |
Constraint programming for project-driven manufacturing
|
Banaszak, Z.A. |
|
2009 |
120 |
2 |
p. 463-475 13 p. |
artikel |
16 |
Coordinated supply chain scheduling
|
Sawik, Tadeusz |
|
2009 |
120 |
2 |
p. 437-451 15 p. |
artikel |
17 |
Coordinating dispersed product development processes: A contingency perspective of project design and modelling
|
To, Chester K.M. |
|
2009 |
120 |
2 |
p. 570-584 15 p. |
artikel |
18 |
Defining inventory control points in multiproduct stochastic pull systems
|
Askin, Ronald G. |
|
2009 |
120 |
2 |
p. 418-429 12 p. |
artikel |
19 |
Designing an electronic auction market for complex ‘smart parts’ logistics: Options based on LeBaron's computational stock market
|
McKelvey, Bill |
|
2009 |
120 |
2 |
p. 476-494 19 p. |
artikel |
20 |
Discrete forecast horizons for two-product variants of the dynamic lot-size problem
|
Dawande, Milind |
|
2009 |
120 |
2 |
p. 430-436 7 p. |
artikel |
21 |
Dynamic lot sizing problem with continuous-time Markovian production cost
|
Azaron, Amir |
|
2009 |
120 |
2 |
p. 607-612 6 p. |
artikel |
22 |
Economic design of an X chart for short-run production
|
Ho, Linda Lee |
|
2009 |
120 |
2 |
p. 613-624 12 p. |
artikel |
23 |
Integrated multi-period cell formation and subcontracting production planning in dynamic cellular manufacturing systems
|
Safaei, Nima |
|
2009 |
120 |
2 |
p. 301-314 14 p. |
artikel |
24 |
Introduction to design and analysis of production systems
|
Askin, Ronald G. |
|
2009 |
120 |
2 |
p. 271-275 5 p. |
artikel |
25 |
Investment decisions in troubled times: A Bayesian approach applied to Brazilian firms
|
Kalatzis, Aquiles Elie Guimarães |
|
2009 |
120 |
2 |
p. 595-606 12 p. |
artikel |
26 |
Job rotation in assembly lines employing disabled workers
|
Costa, Alysson M. |
|
2009 |
120 |
2 |
p. 625-632 8 p. |
artikel |
27 |
Offshore outsourcing of services: An evolutionary perspective
|
Tate, Wendy L. |
|
2009 |
120 |
2 |
p. 512-524 13 p. |
artikel |
28 |
Optimization methods for a stochastic surgery planning problem
|
Lamiri, Mehdi |
|
2009 |
120 |
2 |
p. 400-410 11 p. |
artikel |
29 |
Performance evaluation of production systems monitored by statistical process control and off-line inspections
|
Colledani, Marcello |
|
2009 |
120 |
2 |
p. 348-367 20 p. |
artikel |
30 |
Performance of French intensive care units: A directional distance function approach at the patient level
|
Dervaux, B. |
|
2009 |
120 |
2 |
p. 585-594 10 p. |
artikel |
31 |
Quantifying the effects of product family decisions on material selection: A process-based costing approach
|
Johnson, Michael D. |
|
2009 |
120 |
2 |
p. 653-668 16 p. |
artikel |
32 |
Queueing models for full-flexible multi-class call centers with real-time anticipated delays
|
Jouini, Oualid |
|
2009 |
120 |
2 |
p. 389-399 11 p. |
artikel |
33 |
The effect of dynamic worker behavior on flow line performance
|
Digiesi, Salvatore |
|
2009 |
120 |
2 |
p. 368-377 10 p. |
artikel |
34 |
The endoscopy scheduling problem: A case study with two specialised operating rooms
|
Fei, Hongying |
|
2009 |
120 |
2 |
p. 452-462 11 p. |
artikel |