no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
A model for a production–repair system under a time-varying demand process
|
Omar, Mohd |
|
2009 |
119 |
1 |
p. 17-23 7 p. |
article |
2 |
An application of tournament genetic algorithm in a marketing oriented economic production lot-size model for deteriorating items
|
Bhunia, A.K. |
|
2009 |
119 |
1 |
p. 112-121 10 p. |
article |
3 |
A single control chart for monitoring the frequency and magnitude of an event
|
Wu, Zhang |
|
2009 |
119 |
1 |
p. 24-33 10 p. |
article |
4 |
A test-rework process yield performance model for estimation of printed wiring board assembly cost
|
Shimohashi, Koki |
|
2009 |
119 |
1 |
p. 161-173 13 p. |
article |
5 |
Concurrent engineering performance: Incremental versus radical innovation
|
Valle, Sandra |
|
2009 |
119 |
1 |
p. 136-148 13 p. |
article |
6 |
Cost analyses and predictions for a fuel ethanol plant in a rural and landlocked African country: Lang factor approach
|
Amigun, B. |
|
2009 |
119 |
1 |
p. 207-216 10 p. |
article |
7 |
Designing parallel assembly lines with split workplaces: Model and optimization procedure
|
Scholl, Armin |
|
2009 |
119 |
1 |
p. 90-100 11 p. |
article |
8 |
Designing replenishment rules in a two-echelon supply chain with a flexible or an inflexible capacity strategy
|
Boute, Robert N. |
|
2009 |
119 |
1 |
p. 187-198 12 p. |
article |
9 |
Designing salespeople's routes with multiple visits of customers: A case study
|
Ferrer, Laia |
|
2009 |
119 |
1 |
p. 46-54 9 p. |
article |
10 |
Determining the optimal size of supply base with the consideration of risks of supply disruptions
|
Sarkar, Ashutosh |
|
2009 |
119 |
1 |
p. 122-135 14 p. |
article |
11 |
Erratum to “A modified two objective model for decision making in a supply chain” [International Journal of Production Economics 111 (2008) 378–388]
|
Kannan, Govindan |
|
2009 |
119 |
1 |
p. 217-218 2 p. |
article |
12 |
Heuristics for parallel-machine scheduling with job class setups and delivery to multiple customers
|
Wang, Xiuli |
|
2009 |
119 |
1 |
p. 199-206 8 p. |
article |
13 |
Joint cyclic production and delivery scheduling in a two-stage supply chain
|
Pundoor, Guruprasad |
|
2009 |
119 |
1 |
p. 55-74 20 p. |
article |
14 |
Order release strategies to control outsourced operations in a supply chain
|
Boulaksil, Youssef |
|
2009 |
119 |
1 |
p. 149-160 12 p. |
article |
15 |
Prediction intervals for future demand of existing products with an observed demand of zero
|
Lindsey, Matthew |
|
2009 |
119 |
1 |
p. 75-89 15 p. |
article |
16 |
Production and preventive maintenance control in a stochastic manufacturing system
|
Song, Dong-Ping |
|
2009 |
119 |
1 |
p. 101-111 11 p. |
article |
17 |
Quantifying the effects of parts consolidation and development costs on material selection decisions: A process-based costing approach
|
Johnson, Michael |
|
2009 |
119 |
1 |
p. 174-186 13 p. |
article |
18 |
Six Sigma programs: An implementation model
|
Chakravorty, Satya S. |
|
2009 |
119 |
1 |
p. 1-16 16 p. |
article |
19 |
The value of auditing supply chains
|
Fahmy Salama, Kamal |
|
2009 |
119 |
1 |
p. 34-45 12 p. |
article |