nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A hierarchical process industry production–distribution planning model
|
Das, K. |
|
2009 |
117 |
2 |
p. 402-419 18 p. |
artikel |
2 |
A hybrid simulation optimization method for production planning of dedicated remanufacturing
|
Li, Jianzhi |
|
2009 |
117 |
2 |
p. 286-301 16 p. |
artikel |
3 |
An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes
|
Lova, Antonio |
|
2009 |
117 |
2 |
p. 302-316 15 p. |
artikel |
4 |
An overview of theory and practice on process capability indices for quality assurance
|
Wu, Chien-Wei |
|
2009 |
117 |
2 |
p. 338-359 22 p. |
artikel |
5 |
A simulated annealing method based on a clustering approach to determine bills of materials for a large product family
|
Agard, Bruno |
|
2009 |
117 |
2 |
p. 389-401 13 p. |
artikel |
6 |
Cooperative strategies for the availability service of repairable aircraft components
|
Kilpi, Jani |
|
2009 |
117 |
2 |
p. 360-370 11 p. |
artikel |
7 |
Corporate ownership and managerial short-termism: Results from a Finnish study of management perceptions
|
Liljeblom, Eva |
|
2009 |
117 |
2 |
p. 427-438 12 p. |
artikel |
8 |
Determining the utility functions of criteria used in the evaluation of real estate
|
Gomes, Luiz Flávio Autran Monteiro |
|
2009 |
117 |
2 |
p. 420-426 7 p. |
artikel |
9 |
Implementation of value-driven optimisation for the design of aircraft fuselage panels
|
Castagne, Sylvie |
|
2009 |
117 |
2 |
p. 381-388 8 p. |
artikel |
10 |
Inventory performance under pack size constraints and spatially-correlated demand
|
Yan, Xi Steven |
|
2009 |
117 |
2 |
p. 330-337 8 p. |
artikel |
11 |
Multi-product newsvendor problem with value-at-risk considerations
|
Özler, Aysun |
|
2009 |
117 |
2 |
p. 244-255 12 p. |
artikel |
12 |
Multistage bilateral bargaining model with incomplete information—A fuzzy approach
|
Costantino, Francesco |
|
2009 |
117 |
2 |
p. 235-243 9 p. |
artikel |
13 |
Optimal harvest time in continuous aquacultural production: The case of nonhomogeneous production cycles
|
Yu, Run |
|
2009 |
117 |
2 |
p. 267-270 4 p. |
artikel |
14 |
Scheduling a flow shop with combined buffer conditions
|
Liu, Shi Qiang |
|
2009 |
117 |
2 |
p. 371-380 10 p. |
artikel |
15 |
Scheduling parallel machines with resource-dependent processing times
|
Su, Ling-Huey |
|
2009 |
117 |
2 |
p. 256-266 11 p. |
artikel |
16 |
Stochastic single-source capacitated facility location model with service level requirements
|
Lin, C.K.Y. |
|
2009 |
117 |
2 |
p. 439-451 13 p. |
artikel |
17 |
Stocking policy in a two-party vendor managed channel with space restrictions
|
Xu, Kefeng |
|
2009 |
117 |
2 |
p. 271-285 15 p. |
artikel |
18 |
Tracking, tracing, and business process interests in food commodities: A multi-level decision complexity
|
Fritz, Melanie |
|
2009 |
117 |
2 |
p. 317-329 13 p. |
artikel |