no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
A Bayesian approach to determine the value of information in the newsboy problem
|
Lee, Chih-Ming |
|
2008 |
112 |
1 |
p. 391-402 12 p. |
article |
2 |
A bi-objective genetic algorithm approach to risk mitigation in project scheduling
|
Kılıç, Murat |
|
2008 |
112 |
1 |
p. 202-216 15 p. |
article |
3 |
A combined financial and physical flows evaluation for logistic process and tactical production planning: Application in a company supply chain
|
Comelli, Mickael |
|
2008 |
112 |
1 |
p. 77-95 19 p. |
article |
4 |
A fuzzy approach for the evaluation of competences
|
Pépiot, Grégoire |
|
2008 |
112 |
1 |
p. 336-353 18 p. |
article |
5 |
A general model for the design of data warehouses
|
Schneider, Michel |
|
2008 |
112 |
1 |
p. 309-325 17 p. |
article |
6 |
A generic production rules-based system for on-line simulation, decision making and discrete process control
|
Iassinovski, Serguei |
|
2008 |
112 |
1 |
p. 62-76 15 p. |
article |
7 |
A modelling environment based on data warehousing to manage and to optimize the running of international company
|
Combes, C. |
|
2008 |
112 |
1 |
p. 294-308 15 p. |
article |
8 |
Analysis of the impact of the RFID technology on reducing product misplacement errors at retail stores
|
Rekik, Yacine |
|
2008 |
112 |
1 |
p. 264-278 15 p. |
article |
9 |
A new combinatorial approach for coordinating aerial conflicts given uncertainties regarding aircraft speeds
|
Haddad, R. |
|
2008 |
112 |
1 |
p. 226-235 10 p. |
article |
10 |
An objective-oriented and product-line-based manufacturing performance measurement
|
Chen, Chee-Cheng |
|
2008 |
112 |
1 |
p. 380-390 11 p. |
article |
11 |
A project scheduling problem with labour constraints and time-dependent activities requirements
|
Drezet, L.-E. |
|
2008 |
112 |
1 |
p. 217-225 9 p. |
article |
12 |
Branch and bound algorithm for a facility location problem with concave site dependent costs
|
Dupont, Lionel |
|
2008 |
112 |
1 |
p. 245-254 10 p. |
article |
13 |
Cellular manufacturing—A time-based analysis to the layout problem
|
Angra, Surjit |
|
2008 |
112 |
1 |
p. 427-438 12 p. |
article |
14 |
Contribution to reusability and modularity of manufacturing systems simulation models: Application to distributed control simulation within DFT context
|
El Haouzi, H. |
|
2008 |
112 |
1 |
p. 48-61 14 p. |
article |
15 |
DEA Malmquist productivity measure: Taiwanese semiconductor companies
|
Liu, Fuh-Hwa Franklin |
|
2008 |
112 |
1 |
p. 367-379 13 p. |
article |
16 |
Definition of FTL with bypass lines and its simulator for buffer size decision
|
Yamamoto, Hidehiko |
|
2008 |
112 |
1 |
p. 18-25 8 p. |
article |
17 |
Designing distribution patterns for long-term inventory routing with constant demand rates
|
Raa, Birger |
|
2008 |
112 |
1 |
p. 255-263 9 p. |
article |
18 |
Efficient branch-and-bound algorithm for minimizing the weighted sum of completion times on a single machine with one availability constraint
|
Kacem, Imed |
|
2008 |
112 |
1 |
p. 138-150 13 p. |
article |
19 |
Implementing a near-optimal solution for the multi-stage, multi-product capacitated lot-sizing problem by rolling out a cyclical production plan
|
Van den broecke, Frank |
|
2008 |
112 |
1 |
p. 121-137 17 p. |
article |
20 |
Integrating environmental consciousness in product/process development based on life-cycle thinking
|
Mascle, Christian |
|
2008 |
112 |
1 |
p. 5-17 13 p. |
article |
21 |
Investigating implementation issues for workload control (WLC): A comparative case study analysis
|
Hendry, L. |
|
2008 |
112 |
1 |
p. 452-469 18 p. |
article |
22 |
Lot-sizing in a serial distribution system with capacitated in-system production flow
|
Boissière, J. |
|
2008 |
112 |
1 |
p. 483-494 12 p. |
article |
23 |
Minimizing the makespan for the MPM job-shop with availability constraints
|
Zribi, N. |
|
2008 |
112 |
1 |
p. 151-160 10 p. |
article |
24 |
Minimizing work overload in mixed-model assembly lines
|
Bautista, Joaquín |
|
2008 |
112 |
1 |
p. 177-191 15 p. |
article |
25 |
Multicriteria approach to rank scheduling strategies
|
Roux, O. |
|
2008 |
112 |
1 |
p. 192-201 10 p. |
article |
26 |
Optimization of hospital sterilization costs proposing new grouping choices of medical devices into packages
|
Reymondon, Francis |
|
2008 |
112 |
1 |
p. 326-335 10 p. |
article |
27 |
Optimization tool for short-term production planning and scheduling
|
Józefowska, J. |
|
2008 |
112 |
1 |
p. 109-120 12 p. |
article |
28 |
Permutation flowshop scheduling problems with time lags to minimize the weighted sum of machine completion times
|
Fondrevelle, J. |
|
2008 |
112 |
1 |
p. 168-176 9 p. |
article |
29 |
Preventive maintenance and upgrade system: Optimizing the whole performance system by components’ replacement or rearrangement
|
Rachaniotis, N.P. |
|
2008 |
112 |
1 |
p. 236-244 9 p. |
article |
30 |
Production rate control for stochastic remanufacturing systems
|
Gharbi, A. |
|
2008 |
112 |
1 |
p. 37-47 11 p. |
article |
31 |
Rapid cost estimation of metallic components for the aerospace industry
|
de Cos, Javier |
|
2008 |
112 |
1 |
p. 470-482 13 p. |
article |
32 |
Recent developments in the design, control, planning and scheduling of productive systems
|
Artiba, Abdelhakim |
|
2008 |
112 |
1 |
p. 1-4 4 p. |
article |
33 |
Response to a factual comment on the erratum to “Incorporating transportation cost in the lot size and pricing decisions with downward sloping demand” by Prof. S.K. Goyal
|
Abad, Prakash L |
|
2008 |
112 |
1 |
p. 504-505 2 p. |
article |
34 |
Scheduling a hybrid MTO/MTS semiconductor fab with machine-dedication features
|
Wu, Muh-Cherng |
|
2008 |
112 |
1 |
p. 416-426 11 p. |
article |
35 |
Simulation-based optimization of a single-stage failure-prone manufacturing system with transportation delay
|
Mourani, Iyad |
|
2008 |
112 |
1 |
p. 26-36 11 p. |
article |
36 |
Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan
|
Allaoui, H. |
|
2008 |
112 |
1 |
p. 161-167 7 p. |
article |
37 |
Solving surgical cases assignment problem by a branch-and-price approach
|
Fei, H. |
|
2008 |
112 |
1 |
p. 96-108 13 p. |
article |
38 |
Some insights regarding the optimal reorder period in periodic review inventory systems
|
Silver, Edward A. |
|
2008 |
112 |
1 |
p. 354-366 13 p. |
article |
39 |
The order progress diagram: A supportive tool for diagnosing delivery reliability performance in make-to-order companies
|
Soepenberg, G.D. |
|
2008 |
112 |
1 |
p. 495-503 9 p. |
article |
40 |
Using a KDD process to forecast the duration of surgery
|
Combes, C. |
|
2008 |
112 |
1 |
p. 279-293 15 p. |
article |
41 |
Value analysis of location-enabled radio-frequency identification information on delivery chain performance
|
Kim, Jindae |
|
2008 |
112 |
1 |
p. 403-415 13 p. |
article |
42 |
Virtual cellular manufacturing: Configuring routing flexibility
|
Nomden, Gert |
|
2008 |
112 |
1 |
p. 439-451 13 p. |
article |