nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Adapting Wright's modification of Holt's method to forecasting intermittent demand
|
Altay, Nezih |
|
2008 |
111 |
2 |
p. 389-408 20 p. |
artikel |
2 |
A genetic algorithm to optimize the total cost and service level for just-in-time distribution in a supply chain
|
Farahani, Reza Zanjirani |
|
2008 |
111 |
2 |
p. 229-243 15 p. |
artikel |
3 |
An adapted multi-criteria approach to suppliers and products selection—An application oriented to lead-time reduction
|
Bottani, Eleonora |
|
2008 |
111 |
2 |
p. 763-781 19 p. |
artikel |
4 |
An analytical model to evaluating the implementation of a batch-production-oriented line
|
Gamberi, M. |
|
2008 |
111 |
2 |
p. 729-740 12 p. |
artikel |
5 |
A new decision-making structure for the order entry stage in make-to-order environments
|
Ebadian, M. |
|
2008 |
111 |
2 |
p. 351-367 17 p. |
artikel |
6 |
An improved (Q, R) formulation when the stockout cost is incurred on a per-stockout basis
|
Lau, Amy Hing Ling |
|
2008 |
111 |
2 |
p. 421-434 14 p. |
artikel |
7 |
A note on: Developing an exact solution for an inventory system with product recovery
|
Konstantaras, I. |
|
2008 |
111 |
2 |
p. 707-712 6 p. |
artikel |
8 |
A semi-Markov decision algorithm for the maintenance of a production system with buffer capacity and continuous repair times
|
Dimitrakos, T.D. |
|
2008 |
111 |
2 |
p. 752-762 11 p. |
artikel |
9 |
Assembly line balancing: Which model to use when?
|
Boysen, Nils |
|
2008 |
111 |
2 |
p. 509-528 20 p. |
artikel |
10 |
A tabu search procedure for developing robust predictive project schedules
|
Lambrechts, Olivier |
|
2008 |
111 |
2 |
p. 493-508 16 p. |
artikel |
11 |
A two objective model for decision making in a supply chain
|
Pokharel, Shaligram |
|
2008 |
111 |
2 |
p. 378-388 11 p. |
artikel |
12 |
Competition in remanufacturing and the effects of government subsidies
|
Mitra, Supriya |
|
2008 |
111 |
2 |
p. 287-298 12 p. |
artikel |
13 |
Confirmation of a measurement model for green supply chain management practices implementation
|
Zhu, Qinghua |
|
2008 |
111 |
2 |
p. 261-273 13 p. |
artikel |
14 |
Coordination of a single-manufacturer/multi-buyer supply chain with credit option
|
Sarmah, S.P. |
|
2008 |
111 |
2 |
p. 676-685 10 p. |
artikel |
15 |
Cost estimation for sheet metal parts using multiple regression and artificial neural networks: A case study
|
Verlinden, B. |
|
2008 |
111 |
2 |
p. 484-492 9 p. |
artikel |
16 |
Customer driven production planning
|
Jodlbauer, H. |
|
2008 |
111 |
2 |
p. 793-801 9 p. |
artikel |
17 |
Designing and evaluating sustainable logistics networks
|
Frota Neto, J. Quariguasi |
|
2008 |
111 |
2 |
p. 195-208 14 p. |
artikel |
18 |
Determining the most appropriate set of weekly working hours for planning annualised working time
|
Lusa, Amaia |
|
2008 |
111 |
2 |
p. 697-706 10 p. |
artikel |
19 |
Economic-based design of engineering systems with degrading components
|
Kap Son, Young |
|
2008 |
111 |
2 |
p. 648-663 16 p. |
artikel |
20 |
Environmental management and manufacturing performance: The role of collaboration in the supply chain
|
Vachon, Stephan |
|
2008 |
111 |
2 |
p. 299-315 17 p. |
artikel |
21 |
Heuristics for scheduling in a no-wait open shop with movable dedicated machines
|
Lin, Hung-Tso |
|
2008 |
111 |
2 |
p. 368-377 10 p. |
artikel |
22 |
Integrating Forward and Reverse Supply Chains: Application to a metal-mechanic company
|
de la Fuente, M. Victoria |
|
2008 |
111 |
2 |
p. 782-792 11 p. |
artikel |
23 |
ISO 26000 and supply chains—On the diffusion of the social responsibility standard
|
Castka, Pavel |
|
2008 |
111 |
2 |
p. 274-286 13 p. |
artikel |
24 |
Locating collection centers for distance- and incentive-dependent returns
|
Aras, Necati |
|
2008 |
111 |
2 |
p. 316-333 18 p. |
artikel |
25 |
Lot sizing in reverse MRP for scheduling disassembly
|
Barba-Gutiérrez, Y. |
|
2008 |
111 |
2 |
p. 741-751 11 p. |
artikel |
26 |
Low-frequency collection of materials disassembled from end-of-life vehicles
|
Krikke, Harold |
|
2008 |
111 |
2 |
p. 209-228 20 p. |
artikel |
27 |
Lumpy demand forecasting using neural networks
|
Gutierrez, Rafael S. |
|
2008 |
111 |
2 |
p. 409-420 12 p. |
artikel |
28 |
Manufacturing strategy, competitive strategy and firm performance: An empirical study in a developing economy environment
|
Amoako-Gyampah, Kwasi |
|
2008 |
111 |
2 |
p. 575-592 18 p. |
artikel |
29 |
Mapping the structural properties of production process and product mix
|
Kemppainen, Katariina |
|
2008 |
111 |
2 |
p. 713-728 16 p. |
artikel |
30 |
Mass customization: A method for market segmentation and choice menu design
|
Fogliatto, Flávio S. |
|
2008 |
111 |
2 |
p. 606-622 17 p. |
artikel |
31 |
Meta-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times
|
Hamed Hendizadeh, S. |
|
2008 |
111 |
2 |
p. 593-605 13 p. |
artikel |
32 |
Negotiation-based coordination in product recovery networks
|
Walther, Grit |
|
2008 |
111 |
2 |
p. 334-350 17 p. |
artikel |
33 |
On the optimal selection of process alternatives in a Six Sigma implementation
|
Kumar, U. Dinesh |
|
2008 |
111 |
2 |
p. 456-467 12 p. |
artikel |
34 |
Optimal booking of machines in a virtual job-shop with stochastic processing times to minimize total machine rental and job tardiness costs
|
Laslo, Zohar |
|
2008 |
111 |
2 |
p. 812-821 10 p. |
artikel |
35 |
Optimal buffer inventory and opportunistic preventive maintenance under random production capacity availability
|
Zequeira, Romulo I. |
|
2008 |
111 |
2 |
p. 686-696 11 p. |
artikel |
36 |
Optimal production allocation and distribution supply chain networks
|
Tsiakis, Panagiotis |
|
2008 |
111 |
2 |
p. 468-483 16 p. |
artikel |
37 |
Optimizing liquefied natural gas terminal design for effective supply-chain operations
|
Özelkan, Ertunga C. |
|
2008 |
111 |
2 |
p. 529-542 14 p. |
artikel |
38 |
Partitioning bottleneck work center for cellular manufacturing: An integrated performance and cost model
|
Agarwal, Atul |
|
2008 |
111 |
2 |
p. 635-647 13 p. |
artikel |
39 |
Possibilistic optimization in planning decision of construction industry
|
Vasant, Pandian M. |
|
2008 |
111 |
2 |
p. 664-675 12 p. |
artikel |
40 |
Power-of-two single-warehouse multi-buyer inventory coordination with private information
|
Chu, Chi-Leung |
|
2008 |
111 |
2 |
p. 562-574 13 p. |
artikel |
41 |
Price discounts in exchange for reduced customer demand variability and applications to advance demand information acquisition
|
Kunnumkal, Sumit |
|
2008 |
111 |
2 |
p. 543-561 19 p. |
artikel |
42 |
Redesigning closed-loop service network at a computer manufacturer: A case study
|
Kusumastuti, Ratih Dyah |
|
2008 |
111 |
2 |
p. 244-260 17 p. |
artikel |
43 |
Single-machine scheduling with a time-dependent learning effect
|
Wang, J.-B. |
|
2008 |
111 |
2 |
p. 802-811 10 p. |
artikel |
44 |
Single machine scheduling with outsourcing allowed
|
Lee, Ik Sun |
|
2008 |
111 |
2 |
p. 623-634 12 p. |
artikel |
45 |
Sustainable supply chain management
|
Piplani, Rajesh |
|
2008 |
111 |
2 |
p. 193-194 2 p. |
artikel |
46 |
The impact of pricing policy on sales variability in a supermarket retail context
|
Hamister, James W. |
|
2008 |
111 |
2 |
p. 441-455 15 p. |
artikel |
47 |
The single-machine parallel-batching on-line scheduling problem with family jobs to minimize makespan
|
Nong, Qingqin |
|
2008 |
111 |
2 |
p. 435-440 6 p. |
artikel |