nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Bayesian approach based on multiple samples for measuring process performance with incapability index
|
Lin, Gu-Hong |
|
2007 |
106 |
2 |
p. 506-512 7 p. |
artikel |
2 |
An economic order quantity model with defective items and shortages
|
Eroglu, Abdullah |
|
2007 |
106 |
2 |
p. 544-549 6 p. |
artikel |
3 |
An empirical assessment of a nomological network of organizational design constructs: From culture to structure to pull production to performance
|
Koufteros, Xenophon A. |
|
2007 |
106 |
2 |
p. 468-492 25 p. |
artikel |
4 |
A review of multi-factor capacity expansion models for manufacturing plants: Searching for a holistic decision aid
|
Julka, Nirupam |
|
2007 |
106 |
2 |
p. 607-621 15 p. |
artikel |
5 |
A survey and optimization-based evaluation of development strategies for the air cargo industry
|
Chang, Yu-Hern |
|
2007 |
106 |
2 |
p. 550-562 13 p. |
artikel |
6 |
Effective control policies for stochastic inventory systems with a minimum order quantity and linear costs
|
Zhou, Bin |
|
2007 |
106 |
2 |
p. 523-531 9 p. |
artikel |
7 |
Enterprise management: A new frontier for organisations
|
Binder, Mario |
|
2007 |
106 |
2 |
p. 409-430 22 p. |
artikel |
8 |
Implementing strategically aligned performance measurement in small firms
|
Hudson Smith, Mel |
|
2007 |
106 |
2 |
p. 393-408 16 p. |
artikel |
9 |
Improving the performance of the ATC dispatch rule by using workload data to determine the lookahead parameter value
|
Valente, Jorge M.S. |
|
2007 |
106 |
2 |
p. 563-573 11 p. |
artikel |
10 |
Multiobjective single machine scheduling with nontraditional requirements
|
Haral, Uday |
|
2007 |
106 |
2 |
p. 574-584 11 p. |
artikel |
11 |
Optimal project selection with random fuzzy parameters
|
Huang, Xiaoxia |
|
2007 |
106 |
2 |
p. 513-522 10 p. |
artikel |
12 |
Organizational culture, critical success factors, and the reduction of hospital errors
|
Stock, Gregory N. |
|
2007 |
106 |
2 |
p. 368-392 25 p. |
artikel |
13 |
Organizational learning culture—the missing link between business process change and organizational performance
|
Škerlavaj, Miha |
|
2007 |
106 |
2 |
p. 346-367 22 p. |
artikel |
14 |
Organizational structures and the performance of supply chain management
|
Kim, Soo Wook |
|
2007 |
106 |
2 |
p. 323-345 23 p. |
artikel |
15 |
Risk hedging through forward supply contract and equity ownership in a spin-off decision
|
Takezawa, Naoya |
|
2007 |
106 |
2 |
p. 532-543 12 p. |
artikel |
16 |
‘Soft’ supplier management related issues: An empirical investigation
|
Polychronakis, Yiannis E. |
|
2007 |
106 |
2 |
p. 431-449 19 p. |
artikel |
17 |
Special issue on organizational structure, culture and operations management: An empirical missing link
|
Edwin Cheng, T.C. |
|
2007 |
106 |
2 |
p. 321-322 2 p. |
artikel |
18 |
Supplier evaluation and management system for strategic sourcing based on a new multicriteria sorting procedure
|
Araz, Ceyhun |
|
2007 |
106 |
2 |
p. 585-606 22 p. |
artikel |
19 |
The role of Guanxi in supply management practices
|
Lee, Peter K.C. |
|
2007 |
106 |
2 |
p. 450-467 18 p. |
artikel |
20 |
WITHDRAWN: An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation
|
Lo, Sh-Tyan |
|
2007 |
106 |
2 |
p. 493-505 13 p. |
artikel |