nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A factual comment on “Joint economic lot size in distribution system with multiple shipment policy”
|
Goyal, S.K. |
|
2007 |
105 |
2 |
p. 609- 1 p. |
artikel |
2 |
A factual comment on the erratum to “incorporating transportation cost in the lot size and pricing decisions with downward sloping demand”
|
Goyal, S.K. |
|
2007 |
105 |
2 |
p. 607- 1 p. |
artikel |
3 |
An imperfect production process in a volume flexible inventory model
|
Sana, Shib Sankar |
|
2007 |
105 |
2 |
p. 548-559 12 p. |
artikel |
4 |
An optimal mixed policy of inspection and burn-in and the optimal production quantity
|
Yu, Hong-Fwu |
|
2007 |
105 |
2 |
p. 483-491 9 p. |
artikel |
5 |
Batch scheduling of jobs with identical process times on flexible flow lines
|
Quadt, Daniel |
|
2007 |
105 |
2 |
p. 385-401 17 p. |
artikel |
6 |
Batch splitting in an assembly scheduling environment
|
Ghosh Dastidar, Satyaki |
|
2007 |
105 |
2 |
p. 372-384 13 p. |
artikel |
7 |
Comprehensive and configurable metrics for supplier selection
|
Huang, Samuel H. |
|
2007 |
105 |
2 |
p. 510-523 14 p. |
artikel |
8 |
Cost minimizing scheduling of work and rework processes on a single facility under deterioration of reworkables
|
Inderfurth, Karl |
|
2007 |
105 |
2 |
p. 345-356 12 p. |
artikel |
9 |
Diary of Events
|
|
|
2007 |
105 |
2 |
p. 610-611 2 p. |
artikel |
10 |
EOQ revisited: The case of unequal and integral order quantities
|
Lodree Jr., Emmett J. |
|
2007 |
105 |
2 |
p. 580-590 11 p. |
artikel |
11 |
Evaluating alternative capacity strategies in semiconductor manufacturing under uncertain demand and price scenarios
|
Chou, Yon-Chun |
|
2007 |
105 |
2 |
p. 591-606 16 p. |
artikel |
12 |
Heuristic genetic algorithm for capacitated production planning problems with batch processing and remanufacturing
|
Li, Yongjian |
|
2007 |
105 |
2 |
p. 301-317 17 p. |
artikel |
13 |
Hybrid flow shop scheduling as a multi-mode multi-project scheduling problem with batching requirements: A real-world application
|
Voß, Stefan |
|
2007 |
105 |
2 |
p. 445-458 14 p. |
artikel |
14 |
Lot sizing problem on a paper machine under a cyclic production approach
|
Bouchriha, Hanen |
|
2007 |
105 |
2 |
p. 318-328 11 p. |
artikel |
15 |
Metaheuristic approaches to the hybrid flow shop scheduling problem with a cost-related criterion
|
Janiak, Adam |
|
2007 |
105 |
2 |
p. 407-424 18 p. |
artikel |
16 |
Modelling and analysis of rail maintenance cost
|
Reddy, Venkatarami |
|
2007 |
105 |
2 |
p. 475-482 8 p. |
artikel |
17 |
Moving -window spectral model based statistical process control
|
Ridley, D. |
|
2007 |
105 |
2 |
p. 492-509 18 p. |
artikel |
18 |
Observation on: A genetic algorithm for solving a fuzzy economic lot-size scheduling problem
|
Goyal, S.K. |
|
2007 |
105 |
2 |
p. 608- 1 p. |
artikel |
19 |
Optimal and near-optimal algorithms to rolling batch scheduling for seamless steel tube production
|
Tang, Lixin |
|
2007 |
105 |
2 |
p. 357-371 15 p. |
artikel |
20 |
Product development process with focus on value engineering and target-costing: A case study in an automotive company
|
Ibusuki, Ugo |
|
2007 |
105 |
2 |
p. 459-474 16 p. |
artikel |
21 |
Scheduling of batch plants: Constraint-based approach and performance investigation
|
Huang, Wei |
|
2007 |
105 |
2 |
p. 425-444 20 p. |
artikel |
22 |
Scheduling on a single machine with family setups to minimize total tardiness
|
Schaller, Jeffrey |
|
2007 |
105 |
2 |
p. 329-344 16 p. |
artikel |
23 |
Single machine serial-batching scheduling problem with a common batch size to minimize total weighted completion time
|
Yuan, J.J. |
|
2007 |
105 |
2 |
p. 402-406 5 p. |
artikel |
24 |
Special issue on scheduling in batch-processing industries and supply chains
|
Cheng, T.C. Edwin |
|
2007 |
105 |
2 |
p. 299-300 2 p. |
artikel |
25 |
Total Quality Environmental Management and Total Cost Assessment: An exploratory study
|
Curkovic, Sime |
|
2007 |
105 |
2 |
p. 560-579 20 p. |
artikel |
26 |
Using the learning curve to maximize IT productivity: A decision analysis model for timing software upgrades
|
Ngwenyama, Ojelanki |
|
2007 |
105 |
2 |
p. 524-535 12 p. |
artikel |
27 |
Value chain analysis using hybrid simulation and AHP
|
Rabelo, Luis |
|
2007 |
105 |
2 |
p. 536-547 12 p. |
artikel |