nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A coordination mechanism for a supply chain with demand information updating
|
Chen, Haoya |
|
2006 |
103 |
1 |
p. 347-361 15 p. |
artikel |
2 |
Activity-based costing as a method for assessing the economics of modularization—A case study and beyond
|
Thyssen, Jesper |
|
2006 |
103 |
1 |
p. 252-270 19 p. |
artikel |
3 |
A DSS approach to managing customer enquiries for SMEs at the customer enquiry stage
|
Xiong, M.H. |
|
2006 |
103 |
1 |
p. 332-346 15 p. |
artikel |
4 |
An algorithm for minimizing weighted earliness penalty in assembly job shops
|
Pathumnakul, Supachai |
|
2006 |
103 |
1 |
p. 230-245 16 p. |
artikel |
5 |
A note on “a hybrid genetic algorithm for the dynamic plant layout problem”
|
Balakrishnan, Jaydeep |
|
2006 |
103 |
1 |
p. 87-89 3 p. |
artikel |
6 |
Cost estimation in mechanical production: The Cost Entity approach applied to integrated product engineering
|
H’mida, Fehmi |
|
2006 |
103 |
1 |
p. 17-35 19 p. |
artikel |
7 |
Demand forecast accuracy and performance of inventory policies under multi-level rolling schedule environments
|
Jeunet, Jully |
|
2006 |
103 |
1 |
p. 401-419 19 p. |
artikel |
8 |
Disruption management for machine scheduling: The case of SPT schedules
|
Qi, Xiangtong |
|
2006 |
103 |
1 |
p. 166-184 19 p. |
artikel |
9 |
Editorial Board
|
|
|
2006 |
103 |
1 |
p. CO2- 1 p. |
artikel |
10 |
Equipment management strategy under machine capacity loss
|
Sheu, D. Daniel |
|
2006 |
103 |
1 |
p. 308-315 8 p. |
artikel |
11 |
Financial risk management in the planning of refinery operations
|
Pongsakdi, Arkadej |
|
2006 |
103 |
1 |
p. 64-86 23 p. |
artikel |
12 |
Implementation of Deming's style of quality management: An action research study in a plastics company
|
Hales, Douglas N. |
|
2006 |
103 |
1 |
p. 131-148 18 p. |
artikel |
13 |
Industry evidence of enhanced production stability since 1984
|
Bivin, David G. |
|
2006 |
103 |
1 |
p. 438-448 11 p. |
artikel |
14 |
In Memoriam: Professor Norman Dudley, CBE, FREng 1916–2006
|
|
|
2006 |
103 |
1 |
p. 1-2 2 p. |
artikel |
15 |
Integrated project evaluation and selection using multiple-attribute decision-making technique
|
Dey, Prasanta Kumar |
|
2006 |
103 |
1 |
p. 90-103 14 p. |
artikel |
16 |
Integrating direct and indirect sales channels under decentralized decision-making
|
Seifert, Ralf W. |
|
2006 |
103 |
1 |
p. 209-229 21 p. |
artikel |
17 |
Joint economic procurement—production–delivery policy for multiple items in a single-manufacturer, multiple-retailer system
|
Kim, Taebok |
|
2006 |
103 |
1 |
p. 199-208 10 p. |
artikel |
18 |
Little's Law in a continuous setting
|
Jodlbauer, Herbert |
|
2006 |
103 |
1 |
p. 10-16 7 p. |
artikel |
19 |
Mixed-variable fuzzy clustering approach to part family and machine cell formation for GT applications
|
Yang, Miin-Shen |
|
2006 |
103 |
1 |
p. 185-198 14 p. |
artikel |
20 |
Models for production planning under uncertainty: A review
|
Mula, J. |
|
2006 |
103 |
1 |
p. 271-285 15 p. |
artikel |
21 |
Note on: Concurrent pricing and lot sizing for make-to-order contract production
|
Cárdenas-Barrón, Leopoldo Eduardo |
|
2006 |
103 |
1 |
p. 449-450 2 p. |
artikel |
22 |
On optimal payment time for a retailer under permitted delay of payment by the wholesaler
|
Song, Xiping |
|
2006 |
103 |
1 |
p. 246-251 6 p. |
artikel |
23 |
On the stock control performance of intermittent demand estimators
|
Syntetos, Aris A. |
|
2006 |
103 |
1 |
p. 36-47 12 p. |
artikel |
24 |
Optimization-based decision support for order promising in supply chain networks
|
Venkatadri, Uday |
|
2006 |
103 |
1 |
p. 117-130 14 p. |
artikel |
25 |
Product development practices and performance: A structural equation modeling-based multi-group analysis
|
Koufteros, Xenophon |
|
2006 |
103 |
1 |
p. 286-307 22 p. |
artikel |
26 |
Raw material release time control for complex make-to-order products with stochastic processing times
|
Song, Dong-Ping |
|
2006 |
103 |
1 |
p. 371-385 15 p. |
artikel |
27 |
Rotational allocation of tasks to multifunctional workers in a service industry
|
Corominas, Albert |
|
2006 |
103 |
1 |
p. 3-9 7 p. |
artikel |
28 |
So many factors, so little time…Simulation experiments in the frequency domain
|
Sanchez, Susan M. |
|
2006 |
103 |
1 |
p. 149-165 17 p. |
artikel |
29 |
Synchronization in common cycle lot size scheduling for a multi-product serial supply chain
|
Hoque, M.A. |
|
2006 |
103 |
1 |
p. 316-331 16 p. |
artikel |
30 |
Temporal technical and profit efficiency measurement: Definitions, duality and aggregation results
|
Briec, Walter |
|
2006 |
103 |
1 |
p. 48-63 16 p. |
artikel |
31 |
The impact of information sharing and forecasting in capacitated industrial supply chains: A case study
|
Byrne, P.J. |
|
2006 |
103 |
1 |
p. 420-437 18 p. |
artikel |
32 |
Two-echelon supply chain models: Considering duopolistic retailers’ different competitive behaviors
|
Yang, Shan-Lin |
|
2006 |
103 |
1 |
p. 104-116 13 p. |
artikel |
33 |
Two-machine flowshop scheduling problem to minimize total completion time with bounded setup and processing times
|
Allahverdi, Ali |
|
2006 |
103 |
1 |
p. 386-400 15 p. |
artikel |
34 |
Two-warehouse partial backlogging inventory models for deteriorating items under inflation
|
Yang, Hui-Ling |
|
2006 |
103 |
1 |
p. 362-370 9 p. |
artikel |