nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A flow-network approach for equilibrium of material requirements planning
|
Yenisey, Mehmet Mutlu |
|
2006 |
102 |
2 |
p. 317-332 16 p. |
artikel |
2 |
A fuzzy approach for supplier evaluation and selection in supply chain management
|
Chen, Chen-Tung |
|
2006 |
102 |
2 |
p. 289-301 13 p. |
artikel |
3 |
A genetic algorithm for solving a fuzzy economic lot-size scheduling problem
|
Chang, Ping-Teng |
|
2006 |
102 |
2 |
p. 265-288 24 p. |
artikel |
4 |
A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer
|
Hoque, Mohammad A. |
|
2006 |
102 |
2 |
p. 217-225 9 p. |
artikel |
5 |
A Lagrangean relaxation algorithm for multi-item lot-sizing problems with joint piecewise linear resource costs
|
Rizk, Nafee |
|
2006 |
102 |
2 |
p. 344-357 14 p. |
artikel |
6 |
A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem
|
Gamberini, Rita |
|
2006 |
102 |
2 |
p. 226-243 18 p. |
artikel |
7 |
An examination of the impact of coordinating supply chain policies and price markdowns on short lifecycle product retail performance
|
Nair, Anand |
|
2006 |
102 |
2 |
p. 379-392 14 p. |
artikel |
8 |
Cost evaluation of a two-echelon inventory system with lost sales and approximately Poisson demand
|
Seifbarghy, Mehdi |
|
2006 |
102 |
2 |
p. 244-254 11 p. |
artikel |
9 |
Decentralized inventory control in a two-component assembly system
|
Chu, Hongsheng |
|
2006 |
102 |
2 |
p. 255-264 10 p. |
artikel |
10 |
Designing logistics networks in divergent process industries: A methodology and its application to the lumber industry
|
Vila, Didier |
|
2006 |
102 |
2 |
p. 358-378 21 p. |
artikel |
11 |
Diary of Events
|
|
|
2006 |
102 |
2 |
p. 393-394 2 p. |
artikel |
12 |
Editorial Board
|
|
|
2006 |
102 |
2 |
p. CO2- 1 p. |
artikel |
13 |
Joint economic lot size in distribution system with multiple shipment policy
|
Siajadi, Hans |
|
2006 |
102 |
2 |
p. 302-316 15 p. |
artikel |
14 |
Response surface analysis of a multi-product batch processing facility using a simulation metamodel
|
Noguera, Jose H. |
|
2006 |
102 |
2 |
p. 333-343 11 p. |
artikel |
15 |
Time-phased creation of hybrid manufacturing systems
|
Ioannou, George |
|
2006 |
102 |
2 |
p. 183-198 16 p. |
artikel |
16 |
Uncapacitated production and location planning models with demand fulfillment flexibility
|
Merzifonluoğlu, Yasemin |
|
2006 |
102 |
2 |
p. 199-216 18 p. |
artikel |