no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
A group genetic algorithm for the machine cell formation problem
|
Vila Gonçalves Filho, Eduardo |
|
2006 |
102 |
1 |
p. 1-21 21 p. |
article |
2 |
A heuristic procedure for the two-level control of serial supply chains under fuzzy customer demand
|
Xie, Ying |
|
2006 |
102 |
1 |
p. 37-50 14 p. |
article |
3 |
Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives
|
Ding, Fong-Yuen |
|
2006 |
102 |
1 |
p. 108-131 24 p. |
article |
4 |
Cost characterizations of supply chain delivery performance
|
Guiffrida, Alfred L. |
|
2006 |
102 |
1 |
p. 22-36 15 p. |
article |
5 |
Determination of price and warranty length for a normal lifetime distributed product
|
Wu, Chin-Chun |
|
2006 |
102 |
1 |
p. 95-107 13 p. |
article |
6 |
Diary of Events
|
|
|
2006 |
102 |
1 |
p. 181-182 2 p. |
article |
7 |
Editorial Board
|
|
|
2006 |
102 |
1 |
p. iii-vi nvt p. |
article |
8 |
EOQ, JIT and fixed costs in the ready-mixed concrete industry
|
Min, Wu |
|
2006 |
102 |
1 |
p. 167-180 14 p. |
article |
9 |
Generation of possible multiple components disassembly sequence for maintenance using a disassembly constraint graph
|
Li, Jing Rong |
|
2006 |
102 |
1 |
p. 51-65 15 p. |
article |
10 |
Scheduling of multi-buyer joint replenishments
|
Chan, Chi Kin |
|
2006 |
102 |
1 |
p. 132-142 11 p. |
article |
11 |
Sequence-dependent group scheduling problems in flexible flow shops
|
Logendran, Rasaratnam |
|
2006 |
102 |
1 |
p. 66-86 21 p. |
article |
12 |
Single item optimal lot sizing under continuous unit cost decrease
|
Khouja, Moutaz |
|
2006 |
102 |
1 |
p. 87-94 8 p. |
article |
13 |
Single machine parallel batch scheduling problem with release dates and three hierarchical criteria to minimize makespan, machine occupation time and stocking cost
|
Li, Wenhua |
|
2006 |
102 |
1 |
p. 143-148 6 p. |
article |
14 |
Time-bounds for production networks
|
Gibson, Glenn A. |
|
2006 |
102 |
1 |
p. 149-166 18 p. |
article |