nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
An economically designed, integrated quality and maintenance model using an adaptive Shewhart chart
|
Panagiotidou, Sofia |
|
2009 |
94 |
3 |
p. 732-741 10 p. |
artikel |
2 |
Bayesian framework for prediction of future number of failures from a single group of units in the field
|
Ebrahimi, Nader |
|
2009 |
94 |
3 |
p. 773-775 3 p. |
artikel |
3 |
Calculations of Sobol indices for the Gaussian process metamodel
|
Marrel, Amandine |
|
2009 |
94 |
3 |
p. 742-751 10 p. |
artikel |
4 |
Calendar
|
|
|
2009 |
94 |
3 |
p. I-II nvt p. |
artikel |
5 |
Comment on “A framework to practical predictive maintenance modeling for multi-state systems” by Tan C.M. and Raghavan N. [Reliab Eng Syst Saf 2008;93(8):1138–50]
|
Liu, Yu |
|
2009 |
94 |
3 |
p. 776-780 5 p. |
artikel |
6 |
Comments on “An improved algorithm for connectivity analysis of distribution networks” [Reliab Eng Syst Saf 2007;92(10):1295–302]
|
Mishra, Rajesh |
|
2009 |
94 |
3 |
p. 783- 1 p. |
artikel |
7 |
Computational implementation of sampling-based approaches to the calculation of expected dose in performance assessments for the proposed high-level radioactive waste repository at Yucca Mountain, Nevada
|
Helton, Jon C. |
|
2009 |
94 |
3 |
p. 699-721 23 p. |
artikel |
8 |
Conceptual basis for the definition and calculation of expected dose in performance assessments for the proposed high-level radioactive waste repository at Yucca Mountain, Nevada
|
Helton, Jon C. |
|
2009 |
94 |
3 |
p. 677-698 22 p. |
artikel |
9 |
Diagnostic system for identification of accident scenarios in nuclear power plants using artificial neural networks
|
Santosh, T.V. |
|
2009 |
94 |
3 |
p. 759-762 4 p. |
artikel |
10 |
Inside Front Cover/Editorial Board
|
|
|
2009 |
94 |
3 |
p. IFC- 1 p. |
artikel |
11 |
Model-based Monte Carlo state estimation for condition-based component replacement
|
Cadini, F. |
|
2009 |
94 |
3 |
p. 752-758 7 p. |
artikel |
12 |
Parallel systems under two sequential attacks
|
Levitin, Gregory |
|
2009 |
94 |
3 |
p. 763-772 10 p. |
artikel |
13 |
Reply to comments on “A framework to practical predictive maintenance modeling for multi-state systems”
|
Tan, Cher Ming |
|
2009 |
94 |
3 |
p. 781-782 2 p. |
artikel |
14 |
Simulation-based seismic loss estimation of seaport transportation system
|
Na, Ung Jin |
|
2009 |
94 |
3 |
p. 722-731 10 p. |
artikel |